ATSSERRP01
HMI PRE-DESIGN
KOH NOREA Intake Pump Station
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
Contents
1 INTRODUCTION ............................................................................................................................... 1
2 PROJECT OBJECTIVE ...................................................................................................................... 1
3 Reference documents............................................................................................................................ 1
4 Definitions and abbreviations Symbols Details................................................................................... 2
5 Scope of work in the project ................................................................................................................ 2
6 Bill of Materials ................................................................................................................................... 3
6.1 PLC programming Software licenses .................................................................................................. 3
6.2 Main PLC 1201 ................................................................................................................................... 3
6.3 Remote IO PLC ................................................................................................................................... 4
7 System Architecture & Networks Topology configuration .................................................................. 4
8 HMI SCREEN ..................................................................................................................................... 5
8.1 Raw Intake Overview .......................................................................................................................... 5
8.2 Intake Pumping Station........................................................................................................................ 6
8.3 PLC & Network ................................................................................................................................... 7
8.4 Trends .................................................................................................................................................. 8
8.5 Trend of flow meters ........................................................................................................................... 9
8.6 Alarms ................................................................................................................................................. 9
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
Table of figures
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
1 INTRODUCTION
The purpose of this pre-design or draft version is to indicate the concept of system architecture,
process control, instrument, monitoring parameters, alarm in HMI. The functional design reviews are
essential to provide assurance that deliverable equipment and system being developed will meet the
requirements and design intent of the customer are understood by the development team. These reviews
provide a major input to the verification and validation processes for projects.
Prototyping is a user centric design approach which makes it possible for the end users to visualize
the system, even before it is being built, and provides a mechanism to validate requirements in earlier stages.
Prototypes will also serve to provide screen shots which can be inserted into the Use Case and/or User
Interface/Screen Design Documents.
2 PROJECT OBJECTIVE
The objective of this project is to install PLC based control systems and HMI for
controlling and monitoring of raw intake pumping station at Koh Norea Intake Pumping
Station. The scope of work includes:
- Design, testing and commissioning of PLC based control system for raw water
pump station
- The HMI interfaces include (Overview of Intake Pump Station, Intake Pumping
Station, Electrical System, PLC and network, Alarm, Trends, Report, …)
3 Reference documents
• System Architecture
• Operational and IO list
• Prototype of HMI screen
• BOQ of material
• Symbols in Vijeo Designer 3.0
Page 1 of 9
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
4 Definitions and abbreviations
Symbols Details
1. SCADA Supervision Control and Data Acquisition
2. PLC Programmable Logic Controller
3. VFD Variable Frequency Drive
4. FIT Flow Indicating Transmitter
5. LIT Level Indicating Transmitter
6. PIT Pressure Indicating Transmitter
7. MOV Motor Operated Valve
8. FSL Flow Switch Low
9. BEV Blackwash Electric Value
10. AEV Air Source Electric Value
11. WAV Washout Electric Value
12. IEP Inlet Electric Penstock
13. ORV Outlet Regulating Value
14. MTP Motive Pump
15. MVSG Medium Voltage Switchgear
16. TCP/IP Transmission Control Protocol/Internet Protocol
17. HMI Human Machine Interface
18. UPS Uninterrupted Power Supply
5 Scope of work in the project
The proposed architecture has Schneider M580 based PLC controllers in main control
panel (PLC-1201) with remote IO in PLC Remote IO panels mentioned in architecture. Panel
mounted HMI on PLC-1201 panel and Remote IO panel is controlling and monitoring in
locally. The HMI interface proposed is based on control system in the project. Our scope
includes the following:
• Software development
• HMI engineering
• As build drawing
• Design HMI system for control and monitoring
• On site testing and commissioning for control panels
• Training the interface for operator
Page 2 of 9
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
6 Bill of Materials
6.1 PLC programming Software licenses
Table 1 PLC software licenses
Page 3 of 9
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
6.3 Remote IO PLC
Table 4 Remote IO PLC
Page 4 of 9
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
Figure 2. Overview
Page 5 of 9
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
• Status of Submersible Pumps (P-1001, P-1002, P-1003, P-1004, P-1005 and P-
1006)
• Water levels (LIT-01, LIT-02, LIT-03, LIT-04 and LIT-05)
• Pressure Sensors (PIT-01 and PIT-02)
• Flow meters (FIT-1101 and FIT -1102)
• Display water quality (pH, turbidity, conductivity, Oxygen and temperature)
• Display subpage for monitoring data of level meter and flow meter (level meter, flow
meter and pressure)
Page 6 of 9
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
The design of intake pump station, there are 6 pumps which are controlled by VFDs in
associated withflow switches for motor protection, flow meter s, pressure sensors and level meters.
There are also some instruments for water quality to monitor the turbidity, PH, temperature,
Conductivity and oxygen.
• The status of Surge Vessel (Low low level, Low level, high level and high high
level)
• The status of flow switch (FSL-1001, FSL -1002, FSL -1003, FSL -1004, FSL -
1005 and FSL -1006)
• The status of submersible pumps (P1001, P1002, P1003, P1004, P1005 and
P1006)
• The status of sludge pump (P-1007 and P-1008)
8.3 PLC & Network
In the figure beloved show the network architecture of PLC and the communication
network for the whole intake pumping station.
Figure 4. Network
Page 7 of 9
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
8.4 Trends
The trend display data in real time of parameter in on trend. In the figure below is the
simple of status of 6 submersible pumps.
Figure 5. Trends
Page 8 of 9
Version: 5.0 Owner: Director – Service Division Apply From: 26-Jun-2020 External
ADVANCED TECHNICAL SUPPLIES CO., LTD.
AUTOMATION - SERVICE DIVISION
ATSSERRP01
8.5 Trend of flow meters
8.6 Alarms
Figure 7. Alarms
Page 9 of 9