KING ABDULLAH BIN ABDUL AZIZ

INTERNATIONAL AIRPORT CONSTRUCTION PROJECT JIZAN


TOWER LIGHT DAILY INSPECTION CHECK LIST
Company: _______________ Subcontractor: ___________________Month: ______2022
Equipment No: __________ Operator Name & ID No._____________________________________
S. N CHECKS DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1. Is tower light physically in good condition?

2 Is there any damage in tire (Bolts, crack,


cuts & air pressure) etc.
3 Hoses/pipes are in good condition and free
from any leakage.
4 Is spark arrestor available and working
properly?
5 Is tower light exhaust system working
properly?
6 Is tower light have noise proof system?

7 Is there any vibration in tower light?

8 Is tower light moving parts are guarded


properly?
9 Light Safety stand locks are available?

10 Is drip trey available under Tower light?

11 Is there any damage in wiring or cable?

12 Is emergency Stop switch available and


working properly?
13 Is proper grounding/earthing available?

14 Is Fire extinguisher available with tower


light?
15 Is ELCB available and working properly?

16 Is Equipment have valid inspection


sticker/Certificate?
OPERATOR SIGNATURE

Legend: Good √ Poor Condition × Not Applicable N/A

Remarks