CONCEPT NOTES

OMC distillation
@ N46
( Trial )

28/03/13 0 Sachin Mahendra


Objective:

To describe facility for OMC side stream R1 and R3 distillation trial at N46.

A. Brief Description of Current facility @ M3 :

 R1 and R3 is collected in drums during crude OMC distillation at M3.

 R1 and R3 is distilled in TFE after fresh crude OMC distillation lot.

 R1 and R3 is distilled in both TFE as per process requirement.

B. Brief Description of proposed facility @ N46 :

 OMC distillation will be carried out in Column-2.

 In this column Sulzer packing - BX is used. This packing will give


minimum pressure drop.

 SSR-I will be used as Feed tank. Feed will be introduces above


Bed-3. R22 will be collected from Bed-1 bottom.

 R21 will be collected in SST-II

 R22 will be collected in SST-IV. After process temp decrease, it will


be filled in drums.

 Till desired R22 purity, R22 stream will be recycled to feed tank
SST1

 R23 will be transferred in SSR-V.

 Collected material in SSR-V will be batch distilled. R31 stream will


be recycled to SST-1. R33 will be collected in drums.

 Basis :- Feed rate - 150 kg/hr


Trial run time - 24 hr
OMC quantity for trial - 5 MT

C. Changes required for Trial :-

 SS cartridge filter to be install in feed pump discharge line.

 Feed line is to be modify and divert from column-1 to Column-2


 Currently in column-2 feed is introduced at above Bed-2. We have to
modify line and feed to be introduce above Bed-3

 R21 transfer line to be modify to collect in SST-2

 R23 transfer line to be modify to collect in SSR-V

D. PFD : Proposed facility for Trial


E. Required equipment :

Sr. No Parameter Quantity


1 Column Circulation Pump - Seal 1
2 Piping & Fabrication
3 SS cartridge filter 1
4 Product cooler HEX ( After successful trial ) 1
5 Insulation

F. Safety :-

 Hazop study of proposed facility for trial


 Insulation to all open line and required process section
 Circulation pump seal to be change as per high temp operation
 Process operation training to concern operation persons before
initiating trial.

--------------------End Of CN---------------------