Professional Documents
Culture Documents
SCP_Annexure3
SCP_Annexure3
Workforce
Population distribution
growth
27% 29.43%
City Growth WFPR
Steep decline in population >15 yrs of age is attributed primarily for
rate ‘Education’ & ‘Employment’ reasons
1980 1990 2010 80% Electricity is available 10% HHs have Water Quality
Density 97%of the Day
for Rain Water meets
90%
ENERGY
28 PPH 34 PPH 61 PPH Increase in
density harvesting MOUD
40% Streetlights structure Benchmark
standards
are converted to LED
MOBILITY 48%HHs have
4000 LED lights Water Supply 10% HHs have
36% 29% 9% 683.7 Km distributed in the city connections Water Meters
Walk trips IPT Cycle
ROAD NETWORK WATER
forms 9.9%
HOUSING
of Land area SAFETY/SECURITY
Pucca
77.43%
Modal Share
development Extent…
Share first draft of the proposal
Round 2
with the citizens and invite
their suggestions / feedback
@ ~1000 Email
responses
Facebook
likes
responses
Nukkad
>50 >1.5lakh Natak at 110
newspaper Pamphlets Locations
articles distributed
>15 events at >2 lakh SMS & >4.5 Lakh
prominent WatsApp Total citizen
locations Messages outreach
3.4 VISION & GOALS
Investment Physical
Parents PSUs climate Infra-
CMP CDP Socio- structure
CITIZEN economic
Ranchi
Inherent
SLIP
documents
Master ENGAGEMENT ecosystem
strength
Plan 2037
Industries Slums
Geographic
Mobility CITY PROFILE
Meetings
with >20 positioning CITY SWOT Social Infra-
Elected structure
for All depts. Students rep.
“ ”
Ranchi aspires to be a
Vision
Learning & Knowledge hub of Eastern India that providesSustainable & vibrant environment to its citizens, by addressing their socio economic
needs by leveraging its knowledge institution ecosystem
Strengthen & Improve Core infrastructure • Meet 100% MOUD’s SLBs defined for citizen services
1 • Dedicated space for NMT & 50% Modal share for Public Transport
Enhance Mobility
Provision of adequate • Legal changes to regulate traffic movement
physical and social
infrastructure Preserve & Develop natural resources & open spaces • Open Spaces within 10 min walking distance
Ensure Socio Economic • Create >15,000 seats for higher education facility
2 Development of the city
Focus on Knowledge based Economy • Create >2 lakh jobs in the city
• Enhance tax net and revenue collection through Outsourcing to private vendor and use of
3 Fiscal
Sustainability
Revenue Optimization through innovative mechanism
ICT
Legal changes to improve tax collection • 100% inclusion of properties in the tax net and increase in revenue
Adoption of SMART Smart Urban form • Adoption of Mix Land use & TOD concepts in all future developments
4 PRINCIPLES for CITY
PLANNING,
DEVELOPMENT & Leveraging IT for Smart Governance & to connect with • Availability of 100% citizen services through a common online & offline platform
MANAGEMENT citizens
• Integrate ICT in city management and planning operations
3.5 AREA BASED DEVELOPMENT – Site Overview
3.6 AREA BASED DEVELOPMENT – Concept
Conceptual Development LIVE WORK
4 Proposed
1 Multi-Modal
Arrival
monorail TOD 1 transit Hub
node Eco Park Community 3
1 node Node 1 12
5 6
5 4 2 2 1 2
2Pie-charts – 1 4
3 1. Arrival node 4 Eco Park 6 2
6
400 m 250 m
High density(FAR>=4)
Medium Density(FAR= 4 to 2.5)
Low Density (FAR<=2.5)
One Integrated Infrastructure
facility connecting all modes of
transport :
• Railways
• Monorail
• Inter & Intra City bus service
• E-Rikshaws, Autos, E-Cabs
• Bike Sharing
NEIGHBOURHOOD PLANNING
• Complete & safe
Public walks, NMT
corridors.
• Vibrant & Active • E-rikshaws stands, Bus
MIX & DENSIFY
• Short route options for site. residential, Shopping & • Close proximity to Bus -parks & fields between
Cyclist & pedestrians • Max. 15 mins walk entertainment coexists. interchange, Monorail
COMPACT
• Maximum interval of distance to Monorail • High & medium density spread blocks well-lit
station and Railway Short distance to
pedestrian Station along the transit axis •
station. nearest road with good
intersection at 110 m . • Bike Sharing & parking access
facility through site.
Transit Oriented Development
3.8 AREA BASED DEVELOPMENT - Mobility
3.9 AREA BASED DEVELOPMENT – Site Plan
Monorail Hatia Station
Smart City
route Station
Sky Bridge
Dhurwa LEGEND:
Chowk 9 1. Convention centre & Urban Tower
Proposed 2. 5 Star Hotel
JUTCOL 3. Mixed use development
Heavy TOD 4. Government offices
3
Machine Tool 5. Institutional:
a. Skill development Park
Plant b. Other Institutes College
c. JUPMI
d. Senior Secondary School
Existing Main Road e. Student Resource centre
7d
6. Universities:
a. Medical college
MDE Plant b. Technical University
7c 3 7b 7. Housing:
Site 3 8b
a. MIG
Community 5b
3 b. HIG
Park c. EWS/LIG
4 1 7b d. Hostels
7a 7a
8. Public facilities
3 a. Neighbourhood centre & Smart city Haat
3 b. Community centre
8c
c. Sports centre
8a 9. Multi Modal Transport Hub
2 5d 6a
3 10. Mall & Commercial centre
7a 3 11. Utilities- STP, ESR , Sub-station.
6b
4 5b
ECO PARK
3
5c 3 5a
7a
5e 5b
Mixed Use
Commercial
Residential
Public facilities
Institutional
SMART
INFRASTRUCTURE
Retained
Embankment
Green area/person
760,000 sqm/50,000population
= 15 sqm/person 4.Community
Gardens
The most powerful element of Site- a
continuous green & blue network flowing
across the site, connecting all zones and
functions.
1.River Park 5.Sports
NMT tracks Centre
• Leisure trails
• Jungle trek 2. Eco Park 3.LAKE HARVEST
• Camping Site
• Jogging tracks • Water retention feature created at the already
• Bridges & water Decks existing low lying area of the sit, where all the
• Playing fields & sand pits storm water is natural directed .
• Open • Constructed using Existing Railway embankments ,
3.Lake
Harvest which are now dysfunctional and hence – is an
Adaptive reuse of an existing infrastructure.
• The lake act as a flood control measure, prevents
run offs, and the collected water can be reused at
site for various purpose.
2.ECO PARK
• Lotus garden
• Cleansing Biotope
• Water activity centre
• Kayaking
• Lake deck restaurants &
Cafe
MMTC MMTC
Trunk Service (2 Way)
MMTC MMTC
ABD SITE ABD SITE Trunk Service (1 Way)
Direct Service
ABD SITE ABD SITE
Dense network of Public Proposed Greenways along •City to adopt PBS scheme
160 kms of continuous and 100 kms of Cycle track
Transport connecting every major water bodies to with an coverage area of 5
wide Footpath proposed pan proposed all across the city
nook and corner with a creating NMT corridors sqkm and 1000 cycles
city compliant with IRC with adequate traffic calming
fleet size of 375 buses and public place at the • Cycle stands to be at a
103:2012 measures
same time distance of 300m with a
JUNCTION IMPROVEMENTS
ALBERT EKKA CHOWK
SUJATA CHOWK
Traffic Signal
controller
3
Area Traffic Control System 40
2 Command & Information
Control room PTZ Cameras 40
is send to
Data is analyzed and signal
Red Light Violation Camera 40
Vehicle Incident Detection System 02
Traffic signals are controller 15
time managed &
synchronized
Speed Violation Camera
VMS
20
08 2 3
3.16 IMPLEMENTATION PLAN
3.17 SPV STRUCTURE
SPV Organogram
SPV BOARD of Directors
Director, Chief Engineer, Superintending Engineer, Municipal Commissioner, RMC- Deputy Commissioner, Managing Director representation
SUDA RMC Water board, RMC (Managing Director SPV) Ranchi Director, JVVNL from GOI
Collector, Advisory
Concessionaire / Divisional
Developers/ Consultants
Vendors Commissioner
Supports in
implementing
Supply and Concessionaires/ convergence with
SPV construction Contractors/ SPV JUIDCO various schemes of
Board Members: works Developers/ GOI and supports for
Municipal Commissioner, Chief Vendors human resources
Executive of Urban Development
Authority/ Parasatal
Drinking
Overall PMC Water & Supports in
supervision of Sanitation implementing
Knowledge
Appraisal
Amount in Rs. Name of the Amount in Rs. Amount in Rs. Amount in Rs.
AREA BASED DEVELOPMENT PROPOSALS 2016 2017 2018 2019 2020 Amount in Rs. Cr Amount in Rs. Cr
Cr. Scheme Cr Cr Cr
Open Spaces & Parks (River Park , Eco Park, Lake harvest,
3 49.40 2.47 37.05 9.88 0.00 0.00 5.00 AMRUT 44.40 3.47 34.67
Neighbourhood Park)
4 Water Supply and Reuse of Recycled Water 55.22 2.76 30.37 22.09 0.00 0.00 40.49 AMRUT 14.73 1.66 16.57
5 Waste Water Management -Sewerage & Sanitation 35.93 1.80 19.76 14.37 0.00 0.00 26.34 AMRUT 9.58 1.80 17.96
6 Water Management - Storm Water Drainage 7.76 0.39 4.27 3.11 0.00 0.00 5.69 AMRUT 2.07 0.39 3.88
MNRE/
7 Power Supply, Source & Efficiency 108.12 0.00 27.03 81.09 0.00 0.00 24.00 84.12 6.49 64.87
SOLAR City
8 Safety & Security 21.73 0.00 5.43 16.30 0.00 0.00 21.73 2.61 26.07
9 Transit Hhb/centre 184.10 0.00 55.23 128.87 0.00 0.00 124.10 60.00 8.95 89.50
10 Smart Administrative & Command Centre (SACC) 149.02 14.90 96.86 37.26 0.00 0.00 0.00 61.52 87.50 7.45 74.51
11 Student Resource Centre 88.42 0.00 29.47 58.94 0.00 0.00 0.00 88.42 4.42 44.21
12 Solid waste management system 5.00 0.00 1.25 3.75 0.00 0.00 1.00 SBM 4.00 0.15 1.50
13 EWS 38.84 0.00 31.07 7.77 0.00 0.00 19.13 PMAY 19.72 1.17 11.65
14 Convention Centre 230.00 0.00 126.50 103.50 0.00 0.00 69.00 161.00 6.90 69.00
15 Jharkhand Urban Planning and Management Institute (JUPMI) 95.00 0.00 52.25 42.75 0.00 0.00 28.50 66.50 2.85 28.50
16 Public Facility Centre 37.43 0.00 7.49 29.94 0.00 0.00 37.43 1.12 11.23
17 Health facilites 1.20 0.00 0.24 0.96 0.00 0.00 1.20 0.04 0.36
18 Other Social Infrastructure 20.00 0.00 4.00 16.00 0.00 0.00 20.00 0.60 6.00
Total Cost of Area Based Proposals in Rs. Lakhs 1,397.18 52.87 704.79 639.51 - - 121.65 900.53 315.00 60.00 54.24 542.45
A
1 Intelligent Public Transport System 15.60 1.56 9.14 0.00 0.00 0.00 10.70 4.9 0.80 8.00
2 Corridor Management System (Traffic) 21.09 2.11 18.98 0.00 0.00 0.00 21.09 1.05 10.55
3 Parking Management System 8.00 0.80 7.20 0.00 0.00 0.00 8.00 0.40 4.00
4 IPT Integration 2.70 0.00 2.70 0.00 0.00 0.00 2.70 0.13 1.35
5 Fare mangement system 1.70 0.00 1.70 0.00 0.00 0.00 1.70 0.08 0.84
6 Command & Control Centre (RITTS) 43.00 0.00 43.00 0.00 0.00 0.00 43.00 2.15 21.50
Total Cost of Pan City Proposals in Rs. Lakhs 92.09 4.47 82.72 - - - 0.00 0.00 87.19 0.00 4.90 4.62 46.24
B
Grand Total (A+B) in Rs. Crore 1,489.27 57.34 787.51 639.51 - - 121.65 - 987.72 315.00 64.90 58.87 588.68
Profit & Loss Statement 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31
Holding Tax 10.19 20.38 20.38 20.38 20.38 20.38 21.40 21.40 21.40 21.40 21.40 22.47 22.47
Sewerage Tax 2.05 4.10 4.10 4.10 4.10 4.10 4.31 4.31 4.31 4.31 4.31 4.52 4.52
Smart City Cess 2.05 4.10 4.10 4.10 4.10 4.10 4.31 4.31 4.31 4.31 4.31 4.52 4.52
Water Charges 1.50 3.00 3.00 3.00 3.00 3.00 3.15 3.15 3.15 3.15 3.15 3.31 3.31
Sewage Water Recycling 1.04 2.07 2.17 2.28 2.40 2.52 2.64 2.77 2.91 3.06 3.21 3.37 3.54
SWM 1.37 2.74 2.88 3.02 3.17 3.33 3.50 3.67 3.86 4.05 4.25 4.46 4.69
Operational Revenue
Convention Center 9.63 10.11 10.62 11.15 11.71 12.29 12.91 13.55 14.23 14.94 15.69 16.47
Parking Fees 10.51 17.52 21.90 21.90 26.28 26.28 30.66 30.66 35.04 35.04 39.42 39.42 43.80
Urban Mobility - 0.74 2.33 4.07 5.99 8.98 9.43 9.90 10.40 10.92 11.47 12.04 12.64 13.27 13.94
Advetisement - - 1.44 1.76 2.12 2.50 2.63 2.76 2.89 3.04 3.19 3.35 3.52 3.69 3.88
Rental Income - - 0.84 40.62 51.66 63.07 66.22 69.53 73.01 76.66 80.49 84.52 88.74 93.18 97.84
Park Ticketing 0.26 0.26 0.27 0.27 0.28 0.28 0.30 0.30 0.31 0.31 0.33 0.33 0.34
Total revenue - 226 258 335 204 144 153 158 169 174 184 190 200 208 219
3.19 FINANCIAL PLAN
Assets
Cash & Bank -2 387 1,006 976 1,038 1,020 1,011 1,006 1,011 1,021 1,040 1,063 1,095 1,133 1,180
Total Current Assets -2 387 1,006 976 1,038 1,020 1,011 1,006 1,011 1,021 1,040 1,063 1,095 1,133 1,180
Gross Fixed Assets 392 657 910 910 910 910 910 910 910 910 910 910 910 910 910
Less: Depreciation - - - 15 30 44 59 74 89 104 119 133 148 163 178
Net Fixed Assets 392 657 910 895 880 865 850 836 821 806 791 776 761 747 732
Total Assets 389 1,044 1,916 1,871 1,918 1,886 1,861 1,842 1,832 1,827 1,831 1,839 1,856 1,880 1,912
Liabilities
Current Liabilities
Deposits
Loan - 228 681 481 466 419 373 326 280 233 186 140 93 47 0
Total Liabilities - 228 681 481 466 419 373 326 280 233 186 140 93 47 0
Grant 4 69 122 122 122 122 122 122 122 122 122 122 122 122 122
Share capital 388 588 788 788 788 788 788 788 788 788 788 788 788 788 788
Reserves and Surplus -2 158 325 480 542 557 579 606 643 684 735 790 853 923 1,002
Total Networth 389 815 1,235 1,390 1,452 1,466 1,489 1,516 1,552 1,594 1,644 1,699 1,763 1,833 1,912
Total Liability & Equity 389 1,044 1,916 1,871 1,918 1,886 1,861 1,842 1,832 1,827 1,831 1,839 1,856 1,880 1,912