Professional Documents
Culture Documents
DREWPLEX_AT_AMERZINE_LS
DREWPLEX_AT_AMERZINE_LS
DREWPLEX_AT_AMERZINE_LS
Vessel Name: _____________________________ Co. Name: _______________________________Voyage #: _________________ Boiler: ___________ Flag: __________________
Month: _______Year: _______ Chief Engineer: ________________________________Tested_____________________Exhaust Gas: ‘X’____________Oil Fired: ‘X’______________
DATE: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Over
70
65
60
Daily Control 55
Test
50
Hydrate
45
Alkalinity
in ppm 40
35
30
25
20
Under
DREWPLEX AT Dosage
Over 1000
900
Daily Control 800
Test
700
Neutralized
Conductivity 600
in µS/cm 500
400
300
200
Under
Cont. Blowdown (minutes)
Over
0.10
0.09
0.08
Daily
0.07
Control
Test 0.06
Hydrazine 0.05
in ppm 0.04
0.03
0.02
0.01
Under
AMERZINE Dosage
Phosphate in ppm
Makeup Hardness
Hotwell Temperature
Comments:
Above 65 Decrease
30-65 Satisfactory
Below 30 Increase
NEUTRALIZED CONDUCTIVITY
in µS/cm BLOWDOWN ADJUSTMENT
Normal maintenance blowdown is
Up to 700 Satisfactory sufficient. Regular flash blowdown to
remove suspended solids should be
carried out a minimum of once per week.
*Initial dosage refers to starting up a new system or one that has been down for some reason.