TABLE OF CONTENTS
No.

VICINITY MAP

1 SITE DEVELOPMENT PLAN


SLOPE PROTECTION PLAN

THIS SITE

2 BOX CULVERT DETAILS

0+01
0

5
00
3

0+

0+
WING WALL DETAILS

01
5

0
00
0+
0+
02
0
0+ 4 RETAINING WALL DETAILS
02
5

1 VICINITY MAP SECTION @ STA. 0+000.00


0+ SECTION @ STA. 0+005.00
3 SCALE: NTS 03
0 5 SECTION @ STA. 0+010.00
SECTION @ STA. 0+015.00

SECTION @ STA. 0+020.00


0+035 SECTION @ STA. 0+025.00
6 SECTION @ STA. 0+026.00
SECTION @ STA. 0+028.00
D
A

SECTION @ STA. 0+030.00


0+01
O

0+040
R

SECTION @ STA. 0+035.00


00
0+

0+
G

7
01

SECTION @ STA. 0+040.00


00
0+
IN

0+

SECTION @ STA. 0+045.00


02

L
AL
T

0+ W SECTION @ STA. 0+050.00


IS

NG

0 25
EA
X

NI

0+ AR
I
E

TA

03
G
EA

0
IN

0+045
NR
AR

AD
GABIO
ILL

GR

0+035
BACKF

0+040
0+050
0+045

0+050

3 SLOPE PROTECTION PLAN


3 SCALE: 1:250

2 SITE DEVELOPMENT PLAN


3 SCALE: 1:750

PROJECT TITLE: PREPARED BY: VERIFIED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET No.

_______________________ VICINITY MAP


PROPOSED SLOPE PROTECTION DEXTER D. MARGALLO
ASSIDUOUS CONSTRUCTION CO., LTD.
AND STORM DRAINAGE CIVIL ENGINEER
_______________________ _______________________ _______________________
SITE DEVELOPMENT PLAN S1
PRC NO.: 0172046 PTR NO.: SLOPE PROTECTION PLAN
Room 205, Osmena Annex Bldg.,
Pelaez St., 6000 Cebu City, Philippines
assiduous.construction@yahoo.com LOCATION: PMC Compound, Brgy. Consuelo, DATE : 01-20-2023 DATE :
CONTRACTOR
_______________________ 1 7
0977 253 9261 / 0966 614 7576
Bunawan, Agusan del Sur TIN NO : 480-491-898 PLACE :
t s t s t 200
S/4 S/4
PROVIDE PAVING NOTCH WHERE
APPROACH SLAB IS REQUIRED (TYPICAL) 9 12 mm. Ø @ 250 (TYPICAL) 8 12 mm. Ø @ 200
20 mm. Ø @ 300 3

8 12 mm. Ø @ 200

150
s/2+1
t

3s / 5

250
5 20 mm. Ø @ 300 20 mm. Ø @ 300 5
t + s/4-c t - 2c t - 2c
h/4

250 20 mm. Ø @ 170 6


250 S/5 S/5

100
4a 20 mm. Ø @ 300

t -2 c
12 mm. Ø
3 20 mm. Ø @ 300 12 mm. Ø @ 250 2s + 3t - 2c

h + 2t - 2c

h + 2t - 2c

h + 2t - 2c
9 12 mm. Ø @ 250 9 12 mm. Ø @ 250 12 mm. Ø @ 250 9

5
20 mm. Ø @ 300 1 2 16 mm. Ø @ 200 16 mm. Ø @ 300 7 7 16 mm. Ø @ 300 16 mm. Ø @ 220 2 1 16 mm. Ø @ 200

h/4 + t - c
h

3s / 5

s/4+ t - c
70 mm. Ø WEEP HOLES @ 4550
150 ABOVE NORMAL WATER LEVEL 20 mm. Ø @ 300 5
BAR BENDING DIAGRAM
h/4

3 20 mm. Ø @ 300 20 mm. Ø @ 300 3 CONSTRUCTION JOINT


20 mm. Ø @ 300 5 4a 20 mm. Ø @ 300

250
t

GENERAL NOTES :
SPECIFICATION:
AASHTO STANDARD SPECIFICATION FOR HIGHWAY, BRIDGES, 16TH EDITION 1996.
4- 12 mm. Ø 12 mm. Ø @ 200 8 9 12 mm. Ø @ 250 6 20 mm. Ø @ 170 8 12 mm. Ø @ 200
DESIGN LOAD:
LIVE LOAD MS - 18 (HS 20 - 40 )
SECTION VIEW CONCRETE:
(DOUBLE BARREL) ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSION STRENGTH IN 28 DAYS OF
f ' c = 20.7 MPa (3000psi). ALL EXPOSED CORNERS TO BE CHAMFERED 20 mm. NO
SCALE: NTS. CONSTRUCTION JOINT ARE TO BE MADE EXCEPT WHERE SHOWN. WHEN BOTTOM
SLAB IS SUBJECT TO ABRASION ADD 25mm TO BOTTOM SLAB TO INCREASE
COVERAGE ON STEEL.

SCHEDULE OF BARS FOR DOUBLE BARREL STEEL REINFORCEMENT:


ALL REINFORCING STEEL TO BE INTERMEDIATE ( GRADE 40 ) ASTM A - 615 WITH
DEFORMATIONS CONFORMING TO ASTM A - 305

GENERAL:
IN STATING CULVERT SIZE, GIVE SPAN BY HEIGHT ( SPAN FIRST ). WHEN HEIGHT
OF FILL, H = 0 THE TOP OF SURFACE OF THE UPPER SLAB SHALL FOLLOW THE
CROWN OF THE FINISHED ROADWAY. THE BOX CULVERT SHALL BE CONSTRUCTED
ON A LAYER OF LEAN CONCRETE 50mm MINIMUM THICKNESS.

LIVE LOAD DISTRIBUTION:


WHEN THERE IS LESS THAN 600mm OF FILL ABOVE TOP SLAB OF CULVERT, ADDITIONAL
REINFORCEMENT TRANSVERSE TO THE MAIN REINFORCEMENT IS ADDED TO THE
NOTES: BOTTOM OF THE TOP SLAB IN ACCORDANCE WITH AASHTO 1.3.2.E.
1. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
2. MINIMUM CONCRETE COVER SHALL BE CLEAR. WHEN HEIGHT OF FILL H = 0, INCREASE COVER BY 30. HEIGHT OF FILL:
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT SHOP DRAWING TO SUIT FIELD CONDITION. MAXIMUM HEIGHT OF FILL IS 3000mm ABOVE TOP SLAB, FOR HEIGHT OF FILL GREATER
THAN 3000mm SPECIAL DESIGN OF BOX CULVERT SHOULD BE DONE.

1 BOX CULVERT DETAILS


1 SCALE: NTS

PROJECT TITLE: PREPARED BY: VERIFIED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET No.

_______________________ BOX CULVERT DETAILS


PROPOSED SLOPE PROTECTION DEXTER D. MARGALLO
ASSIDUOUS CONSTRUCTION CO., LTD.
AND STORM DRAINAGE CIVIL ENGINEER
_______________________ _______________________ _______________________
S2
PRC NO.: 0172046 PTR NO.:
Room 205, Osmena Annex Bldg.,
Pelaez St., 6000 Cebu City, Philippines
assiduous.construction@yahoo.com LOCATION: PMC Compound, Brgy. Consuelo, DATE : 01-20-2023 DATE :
CONTRACTOR
_______________________ 2 7
0977 253 9261 / 0966 614 7576
Bunawan, Agusan del Sur TIN NO : 480-491-898 PLACE :
A' 12mm Ø BAR @ 300 E.W. 600

SLO
PE
12 mm. Ø @ 300mm O.C. 150
H
EXTEND BARS INTO BARREL EXCEPT 12mm Ø CONTINUOUS BARS 300 SEE DETAIL "B"
100 200
WHEN EXPANSION JOINT OCCURS 12mm Ø @ 200 O.C. STIRRUPS
1 BOTTOM OF SLAB
BARREL REINFORCEMENT 1
SLO
50mm LEAN CONCRETE
t PE
600
t + 100 1000
12mm Ø BAR @ 300 E.W.

PLACE 10mm EXPANSION FILL h+t


DETAIL "B" 12mm Ø BAR
h JOINT WHEN h + t EXCEEDS 2400
SCALE: 1:30
600
12mm Ø BAR @ 200
ROUND TO APPROXIMATE 150mm RADIUS
(FOR INLET PORTION ONLY) SLOPE = 2.00% (MIN.)

DETAIL "A" t
SCALE: 1:30

h+t A' 200

50mm
LEAN CONCRETE
a
x
SEE DETAIL "A"

b 800 PART SECTION ALONG CENTERLINE OF CULVERT


SCALE:
ɵ VARIES ɵ
600 1000

VA
1.00

R
IE
S
12 mm. Ø
c 0.60
150
400 12 mm. Ø @ 150 O.C. 12 mm. Ø @ 200 O.C. REST 12 mm. Ø @ 250 O.C.

L1 or L2
(SEE TABLE)

A
12 mm. Ø @ 200 O.C.
12 mm. Ø @ 150 O.C. REST 12 mm. Ø @ 250 O.C. WINGWALL PLAN
WHERE;
a = 0.300 - b SCALE: 1 : 50
L1 or L2
b = 0.250 Sin Ø
(SEE TABLE) tx = 0.250 _
230 Sin Ø Sin α

A
CHAMFER 20

t
WINGWALL ELEVATION 12 mm. Ø
12 mm. Ø @ 0.30 O.C.
SCALE: 1:40 12 mm. Ø @ 300mm O.C.
BOTHWAYS

s
GENERAL NOTES : 0.20

2s + 3t
BATTER 12mm IN EVERY 300
WHEN h + t IS 2400 OR MORE
SPECIFICATION:

t
OTHERWISE MAKE FACE VERTICAL
AASHTO STANDARD SPECIFICATION FOR HIGHWAY, BRIDGES, 16TH EDITION 1996.

DESIGN LOAD: FAR FACE NEAR FACE


LIVE LOAD MS - 18 (HS 20 - 40 )
h+t

s
CONCRETE: CONSTRUCTION JOINT
ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSION STRENGTH IN 28 DAYS OF 40 (ROUGHEN SURFACE)
f ' c = 20.7 MPa (3000psi). ALL EXPOSED CORNERS TO BE CHAMFERED 20 mm. NO CONCRETE
COVER
CONSTRUCTION JOINT ARE TO BE MADE EXCEPT WHERE SHOWN. WHEN BOTTOM
SLAB IS SUBJECT TO ABRASION ADD 25mm TO BOTTOM SLAB TO INCREASE FOR TOP REINFORCEMENT
SEE WINGWALL PLAN

t
COVERAGE ON STEEL.

STEEL REINFORCEMENT:
12 mm. Ø

0
ALL REINFORCING STEEL TO BE INTERMEDIATE ( GRADE 40 ) ASTM A - 615 WITH

0
DEFORMATIONS CONFORMING TO ASTM A - 305

1.

30
12 mm. Ø @ 300mm E.W.

0.
GENERAL:
IN STATING CULVERT SIZE, GIVE SPAN BY HEIGHT ( SPAN FIRST ). WHEN HEIGHT
OF FILL, H = 0 THE TOP OF SURFACE OF THE UPPER SLAB SHALL FOLLOW THE
CROWN OF THE FINISHED ROADWAY. THE BOX CULVERT SHALL BE CONSTRUCTED
ON A LAYER OF LEAN CONCRETE 50mm MINIMUM THICKNESS.
150 PART PLAN (DOUBLE BARREL)
400 SCALE: 1:100 MTS.
LIVE LOAD DISTRIBUTION:
1
WHEN THERE IS LESS THAN 600mm OF FILL ABOVE TOP SLAB OF CULVERT, ADDITIONAL
1 50mm
REINFORCEMENT TRANSVERSE TO THE MAIN REINFORCEMENT IS ADDED TO THE
BOTTOM OF THE TOP SLAB IN ACCORDANCE WITH AASHTO 1.3.2.E. VARIES BETWEEN
LEAN CONCRETE 2.40 1.00
800 AND 1200
HEIGHT OF FILL: 0.177
MAXIMUM HEIGHT OF FILL IS 3000mm ABOVE TOP SLAB, FOR HEIGHT OF FILL GREATER LEGEND:
THAN 3000mm SPECIAL DESIGN OF BOX CULVERT SHOULD BE DONE. SECTION A - A'
SCALE: 1:40 HORIZONTAL SKEW HORIZONTAL SKEW LENGTH OF BARREL, L W - WIDTH OF ROADWAY FORMATION
LENGTH OF WINGWALLS H - COVER ABOVE THE CULVERT
ANGLE (α*) SPEED α (mm)
Z - [ ( H + t ) - ( B + 200 ) ] tan Ø
60° L1 = 1.414 c , L2 = 1.035 c 60° 1.1547 [ W + 2Z ] B - t2 + (0.51)(t1)(Wc)
S - SPAN OF BARREL
c = 2.0 ( h + t - 600 ); FOR SLOPE 2:1 h - HEIGHT OF CULVERT OPENING
c = 1.5 ( h + t - 600 ); FOR SLOPE 1.5:1 t - THICKNESS OF CULVERT WALL OR SLAB
Ø - SLOPE OF EMBANKMENT
α - ANGLE OF SKEW

1 WING WALL DETAILS


1 SCALE: NTS

PROJECT TITLE: PREPARED BY: VERIFIED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET No.

_______________________ WING WALL DETAILS


PROPOSED SLOPE PROTECTION DEXTER D. MARGALLO
ASSIDUOUS CONSTRUCTION CO., LTD.
AND STORM DRAINAGE CIVIL ENGINEER
_______________________ _______________________ _______________________
S3
PRC NO.: 0172046 PTR NO.:
Room 205, Osmena Annex Bldg.,
Pelaez St., 6000 Cebu City, Philippines
assiduous.construction@yahoo.com LOCATION: PMC Compound, Brgy. Consuelo, DATE : 01-20-2023 DATE :
CONTRACTOR
_______________________ 3 7
0977 253 9261 / 0966 614 7576
Bunawan, Agusan del Sur TIN NO : 480-491-898 PLACE :
ROAD BASE LEVEL
FILL AREA

BACK EDGE OF TOP GABION LEVEL

GABION RETAINING WALL


4

CUT AREA 7
200mm THK
GRAVEL FILL
8

TYPICAL GABION
1 RETAINING WALL DETAILS
1 SCALE: NTS

PROJECT TITLE: PREPARED BY: VERIFIED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET No.

_______________________ RETAINING WALL DETAILS


PROPOSED SLOPE PROTECTION DEXTER D. MARGALLO
ASSIDUOUS CONSTRUCTION CO., LTD.
AND STORM DRAINAGE CIVIL ENGINEER
_______________________ _______________________ _______________________
S4
PRC NO.: 0172046 PTR NO.:
Room 205, Osmena Annex Bldg.,
Pelaez St., 6000 Cebu City, Philippines
assiduous.construction@yahoo.com LOCATION: PMC Compound, Brgy. Consuelo, DATE : 01-20-2023 DATE :
CONTRACTOR
_______________________ 4 7
0977 253 9261 / 0966 614 7576
Bunawan, Agusan del Sur TIN NO : 480-491-898 PLACE :
1

3 1

4 2

5 3

6 4

7 5

8 6

1 2

2 3

3 4

4 5

5 6

6 7

7 8

PROJECT TITLE: PREPARED BY: VERIFIED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET No.

_______________________ SECTION @ STA. 0+000.00


PROPOSED SLOPE PROTECTION DEXTER D. MARGALLO
ASSIDUOUS CONSTRUCTION CO., LTD.
AND STORM DRAINAGE CIVIL ENGINEER
_______________________ _______________________ _______________________
SECTION @ STA. 0+005.00
SECTION @ STA. 0+010.00
S5
PRC NO.: 0172046 PTR NO.:
Room 205, Osmena Annex Bldg.,
Pelaez St., 6000 Cebu City, Philippines
assiduous.construction@yahoo.com LOCATION: PMC Compound, Brgy. Consuelo, DATE : 01-20-2023 DATE :
CONTRACTOR
_______________________ SECTION @ STA. 0+015.00 5 7
0977 253 9261 / 0966 614 7576
Bunawan, Agusan del Sur TIN NO : 480-491-898 PLACE :
1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

2 1
3 2 1 4 3
5 4 6 5
6 7
BOX CULVERT 7 BOX CULVERT 8 PC
(See Details) 1550mm RC
PC (See Details) 1550mm RC

PROJECT TITLE: PREPARED BY: VERIFIED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET No.

_______________________ SECTION @ STA. 0+020.00


PROPOSED SLOPE PROTECTION DEXTER D. MARGALLO
ASSIDUOUS CONSTRUCTION CO., LTD.
AND STORM DRAINAGE CIVIL ENGINEER
_______________________ _______________________ _______________________
SECTION @ STA. 0+025.00
SECTION @ STA. 0+026.00
S6
PRC NO.: 0172046 PTR NO.:
Room 205, Osmena Annex Bldg.,
Pelaez St., 6000 Cebu City, Philippines
assiduous.construction@yahoo.com LOCATION: PMC Compound, Brgy. Consuelo, DATE : 01-20-2023 DATE :
CONTRACTOR
_______________________ SECTION @ STA. 0+028.00 6 7
0977 253 9261 / 0966 614 7576
Bunawan, Agusan del Sur TIN NO : 480-491-898 PLACE :
1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

2 1

1
3 2

2
4 3

5 4

PROJECT TITLE: PREPARED BY: VERIFIED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET No.

_______________________ SECTION @ STA. 0+030.00


PROPOSED SLOPE PROTECTION DEXTER D. MARGALLO
ASSIDUOUS CONSTRUCTION CO., LTD.
AND STORM DRAINAGE CIVIL ENGINEER
_______________________ _______________________ _______________________
SECTION @ STA. 0+035.00
SECTION @ STA. 0+040.00
S7
PRC NO.: 0172046 PTR NO.:
Room 205, Osmena Annex Bldg.,
Pelaez St., 6000 Cebu City, Philippines
assiduous.construction@yahoo.com LOCATION: PMC Compound, Brgy. Consuelo, DATE : 01-20-2023 DATE :
CONTRACTOR
_______________________ SECTION @ STA. 0+045.00
SECTION @ STA. 0+050.00
7 7
0977 253 9261 / 0966 614 7576
Bunawan, Agusan del Sur TIN NO : 480-491-898 PLACE :
SHEET
No. TABLE OF CONTENTS REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC
PERSPECTIVE WORKS AND HIGHWAYS
1 SITE DEVELOPMENT PLAN
VICINITY MAP
OFFICE OF THE BUILDING
OFFICIAL
DISTRICT CITY MUNICIPAL

FLOOR PLAN

2 FRONT ELEVATION
REAR ELEVATION
LAND USE AND ZONING

RIGHT SIDE ELEVATION


LEFT SIDE ELEVATION
3 SECTION THRU A - A'
SECTION THRU B - B'
LINE AND GRADE
FOUNDATION PLAN
COLUMN FOOTING DETAIL
4 STIFF. COLMN. FOOTING DET.
WALL FOOTING DETAIL

ROOF BEAM PLAN STRUCTURAL


ROOF BEAM DETAIL (RB - 1)
5 ROOF BEAM DETAIL (RB - 2)
ROOF BEAM DETAIL (RB - 3)

ROOF FRAMING PLAN ARCHITECTURAL


6 TRUSS DETAIL - 1

ELECTRICAL
7 TRUSS DETAIL - 2

PLUMBING LAY-OUT PLAN


ISOMETRIC VIEW
8 SPECIFICATION
LEGEND
SEPTIC VAULT DETAILS MECHANICAL
CATCH BASIN DETAILS
ELECTRICAL LAY-OUT PLAN
LOAD COMPUTATION
9 SPECIFICATION
SCHEDULE OF LOADS
RISER DIAGRAM
LEGEND SANITARY

SCALE 1:250
PREPARED BY: REG. No: 0172046 PROJECT TITLE: APPROVED BY: SHEET No.
DATE: 10 - 21 - 2019

DEXTER D. MARGALLO
PTR No: 0456587 PROPOSED ONE (1) STOREY RESIDENTIAL BUILDING
_________________________________
A-1
CIVIL ENGINEER DATE: 02 - 01 - 2021 OWNER ____
TIN: 480 - 491 - 898 LOCATION: GAYONGA, KABUNTALAN, MAGUINDANAO

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED BY: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED : RECOMMENDED : APPROVED : SET NO.: SHEET NO.:

JELLIAN D. GULLES
UNIT HEAD, ENGINEERING SURVEYS AND
SlOPE PROTECTION WITH BOX CULVERT INVESTIGATION UNIT
S 26
PMC Compound, Brgy. Consuelo, Bunawan, Agusan del Sur REINFORCED CONCRETE PREPARED BY:
JOSE R. POSERIO JR. HAROLD C. CAERMARE RONALD T. GEMPISAO LIBERATO S. TAN, JR.
ASSIDUOUS CONSTRUCTION CO., LTD. Sta. 0+000.00 - Sta 0+049.00 BOX CULVERT DETAILS UNIT HEAD, HIGHWAYS DESIGN UNIT CHIEF, PLANNING AND DESIGN SECTION ASST. DISTRICT ENGINEER DISTRICT ENGINEER
7 10 48
Room 205, Osmena Annex Bldg., Pelaez St., 6000 Cebu City, Philippines JOSETTE SAIRA M. VERDUGUEZ
assiduous.construction@yahoo.com ENGINEER I DATE: DATE: DATE: DATE:
0977 253 9261 / 0966 614 7576

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED BY: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED : RECOMMENDED : APPROVED : SET NO.: SHEET NO.:
JELLIAN D. GULLES
SlOPE PROTECTION WITH BOX CULVERT UNIT HEAD, ENGINEERING SURVEYS AND
INVESTIGATION UNIT
PMC Compound, Brgy. Consuelo, Bunawan, Agusan del Sur REINFORCED CONCRETE PREPARED BY:
JOSE R. POSERIO JR. HAROLD C. CAERMARE RONALD T. GEMPISAO LIBERATO S. TAN, JR. S 26
ASSIDUOUS CONSTRUCTION CO., LTD. Sta. 0+000.00 - Sta 0+049.00 BOX CULVERT DETAILS UNIT HEAD, HIGHWAYS DESIGN UNIT CHIEF, PLANNING AND DESIGN SECTION ASST. DISTRICT ENGINEER DISTRICT ENGINEER
7 10 48
Room 205, Osmena Annex Bldg., Pelaez St., 6000 Cebu City, Philippines JOSETTE SAIRA M. VERDUGUEZ
assiduous.construction@yahoo.com ENGINEER I DATE: DATE: DATE: DATE:
0977 253 9261 / 0966 614 7576

3 1

4 2

5 3

6 4

7 5

8 6

1 2

2 3

3 4

4 5

5 6

6 7

7 8

D
A

0+010
O

5
R

0+00
0+0
G

0
0+00
15
0+0
N
L

TI

20
0+02 WAL

IS

ING
5 A

EX

AIN
0+03 ARE

ING
A

RET
1 1

ARE
2 2

GABION

GRAD
3 3

4 4

BACKFILL
5 5

7
6

7
6
0+035
8 8

9 9

0+040

0+045

0+050

2 1
3 2 1 4 3
5 4 6 5
BOX CULVERT 7 6 BOX CULVERT 8 7
(See Details) RCPC (See Details) 1550mm RCPC
1550mm

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

2 1

1
3 2

2
4 3

5 4

ROAD BASE LEVEL


FILL AREA

BACK EDGE OF TOP GABION LEVEL

GABION RETAINING WALL


4

CUT AREA 7
200mm THK
GRAVEL FILL 8

9
D
A

0+010
O

5
R

0+00
0+0
G

0
0+00
15
0+0
N

L
TI

20

0+02 WAL
IS

ING

5 A
EX

AIN

0+03 ARE
ING
A

RET

0
ARE

GABION

GRAD
BACKFILL

0+035
0+0
15

0+040

0+045

0+050
0+010

0+005
0+015

0+000
0+020

0+025

0+030

0+035
0+0
15
0+0

0+040
20

0+045

0+050

t s t s t 200
PROVIDE PAVING NOTCH WHERE
S/4 S/4
APPROACH SLAB IS REQUIRED (TYPICAL) 9 12 mm. Ø @ 250 (TYPICAL) 8 12 mm. Ø @ 200
20 mm. Ø @ 300 3
8 12 mm. Ø @ 200
150

s/2+1
t

3s / 5
250

t + s/4-c t - 2c t - 2c
h/4

5 20 mm. Ø @ 300 20 mm. Ø @ 300 5

250 20 mm. Ø @ 170 6


S/5 S/5
250
100

4a 20 mm. Ø @ 300
t -2 c

12 mm. Ø
h + 2t - 2c

h + 2t - 2c

h + 2t - 2c

3 20 mm. Ø @ 300 12 mm. Ø @ 250 2s + 3t - 2c


9 12 mm. Ø @ 250 9 12 mm. Ø @ 250 12 mm. Ø @ 250 9

5
h/4 + t - c

20 mm. Ø @ 300 1 2 16 mm. Ø @ 200 16 mm. Ø @ 300 7 7 16 mm. Ø @ 300 16 mm. Ø @ 220 2 1 16 mm. Ø @ 200
h

3s / 5

s/4+ t - c
70 mm. Ø WEEP HOLES @ 4550
150 ABOVE NORMAL WATER LEVEL 20 mm. Ø @ 300 5
BAR BENDING DIAGRAM
h/4

3 20 mm. Ø @ 300 20 mm. Ø @ 300 3 CONSTRUCTION JOINT


20 mm. Ø @ 300 5 4a 20 mm. Ø @ 300
250
t

GENERAL NOTES :
SPECIFICATION:
AASHTO STANDARD SPECIFICATION FOR HIGHWAY, BRIDGES, 16TH EDITION 1996.
4- 12 mm. Ø 12 mm. Ø @ 200 8 9 12 mm. Ø @ 250 6 20 mm. Ø @ 170 8 12 mm. Ø @ 200
DESIGN LOAD:
LIVE LOAD MS - 18 (HS 20 - 40 )
SECTION VIEW CONCRETE:
(DOUBLE BARREL) ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSION STRENGTH IN 28 DAYS OF
f ' c = 20.7 MPa (3000psi). ALL EXPOSED CORNERS TO BE CHAMFERED 20 mm. NO
SCALE: NTS. CONSTRUCTION JOINT ARE TO BE MADE EXCEPT WHERE SHOWN. WHEN BOTTOM
SLAB IS SUBJECT TO ABRASION ADD 25mm TO BOTTOM SLAB TO INCREASE
COVERAGE ON STEEL.

SCHEDULE OF BARS FOR DOUBLE BARREL STEEL REINFORCEMENT:


ALL REINFORCING STEEL TO BE INTERMEDIATE ( GRADE 40 ) ASTM A - 615 WITH
DEFORMATIONS CONFORMING TO ASTM A - 305

GENERAL:
IN STATING CULVERT SIZE, GIVE SPAN BY HEIGHT ( SPAN FIRST ). WHEN HEIGHT
OF FILL, H = 0 THE TOP OF SURFACE OF THE UPPER SLAB SHALL FOLLOW THE
CROWN OF THE FINISHED ROADWAY. THE BOX CULVERT SHALL BE CONSTRUCTED
ON A LAYER OF LEAN CONCRETE 50mm MINIMUM THICKNESS.

LIVE LOAD DISTRIBUTION:


WHEN THERE IS LESS THAN 600mm OF FILL ABOVE TOP SLAB OF CULVERT, ADDITIONAL
REINFORCEMENT TRANSVERSE TO THE MAIN REINFORCEMENT IS ADDED TO THE
NOTES: BOTTOM OF THE TOP SLAB IN ACCORDANCE WITH AASHTO 1.3.2.E.
1. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
2. MINIMUM CONCRETE COVER SHALL BE CLEAR. WHEN HEIGHT OF FILL H = 0, INCREASE COVER BY 30. HEIGHT OF FILL:
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT SHOP DRAWING TO SUIT FIELD CONDITION. MAXIMUM HEIGHT OF FILL IS 3000mm ABOVE TOP SLAB, FOR HEIGHT OF FILL GREATER
THAN 3000mm SPECIAL DESIGN OF BOX CULVERT SHOULD BE DONE.

A' 12mm Ø BAR @ 300 E.W.


600

SLOPE
12 mm. Ø @ 300mm O.C. 150

EXTEND BARS INTO BARREL EXCEPT 12mm Ø CONTINUOUS BARS


300
H
SEE DETAIL "B"
WHEN EXPANSION JOINT OCCURS 12mm Ø @ 200 O.C. STIRRUPS
100 200

1 BOTTOM OF SLAB
BARREL REINFORCEMENT 1
t SLOPE
50mm LEAN CONCRETE
600
t + 100 1000
12mm Ø BAR @ 300 E.W.

PLACE 10mm EXPANSION FILL h+t


DETAIL "B" 12mm Ø BAR
h JOINT WHEN h + t EXCEEDS 2400
SCALE: 1:30
600
12mm Ø BAR @ 200
ROUND TO APPROXIMATE 150mm RADIUS
(FOR INLET PORTION ONLY)
SLOPE = 2.00% (MIN.)
DETAIL "A" t
SCALE: 1:30

h+t A'
200

50mm
LEAN CONCRETE
a
x
SEE DETAIL "A"

b 800 PART SECTION ALONG CENTERLINE OF CULVERT


SCALE:

600 ɵ VARIES 1000


ɵ
VARIES

1.00
12 mm. Ø

150 c 0.60
400 12 mm. Ø @ 150 O.C. 12 mm. Ø @ 200 O.C. REST 12 mm. Ø @ 250 O.C.

L1 or L2
(SEE TABLE)

A
12 mm. Ø @ 200 O.C.
12 mm. Ø @ 150 O.C. REST 12 mm. Ø @ 250 O.C. WINGWALL PLAN
WHERE;
L1 or L2 a = 0.300 - b SCALE: 1 : 50
b = 0.250 Sin Ø
(SEE TABLE) tx = 0.250 _
230 Sin Ø Sin α

A
CHAMFER 20
t

WINGWALL ELEVATION 12 mm. Ø


12 mm. Ø @ 0.30 O.C.
SCALE: 1:40 12 mm. Ø @ 300mm O.C. BOTHWAYS
s

GENERAL NOTES : 0.20


2s + 3t

BATTER 12mm IN EVERY 300


SPECIFICATION: WHEN h + t IS 2400 OR MORE
OTHERWISE MAKE FACE VERTICAL
t

AASHTO STANDARD SPECIFICATION FOR HIGHWAY, BRIDGES, 16TH EDITION 1996.


DESIGN LOAD: FAR FACE NEAR FACE
LIVE LOAD MS - 18 (HS 20 - 40 ) h+t
s

CONCRETE: CONSTRUCTION JOINT


ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSION STRENGTH IN 28 DAYS OF 40 (ROUGHEN SURFACE)
f ' c = 20.7 MPa (3000psi). ALL EXPOSED CORNERS TO BE CHAMFERED 20 mm. NO CONCRETE
CONSTRUCTION JOINT ARE TO BE MADE EXCEPT WHERE SHOWN. WHEN BOTTOM COVER
SLAB IS SUBJECT TO ABRASION ADD 25mm TO BOTTOM SLAB TO INCREASE FOR TOP REINFORCEMENT
SEE WINGWALL PLAN
t

COVERAGE ON STEEL.
STEEL REINFORCEMENT:
12 mm. Ø
1.00

ALL REINFORCING STEEL TO BE INTERMEDIATE ( GRADE 40 ) ASTM A - 615 WITH


DEFORMATIONS CONFORMING TO ASTM A - 305
0.30

12 mm. Ø @ 300mm E.W.


GENERAL:
IN STATING CULVERT SIZE, GIVE SPAN BY HEIGHT ( SPAN FIRST ). WHEN HEIGHT
OF FILL, H = 0 THE TOP OF SURFACE OF THE UPPER SLAB SHALL FOLLOW THE
CROWN OF THE FINISHED ROADWAY. THE BOX CULVERT SHALL BE CONSTRUCTED
ON A LAYER OF LEAN CONCRETE 50mm MINIMUM THICKNESS. 150 PART PLAN (DOUBLE BARREL)
400 SCALE: 1:100 MTS.
LIVE LOAD DISTRIBUTION: 1
WHEN THERE IS LESS THAN 600mm OF FILL ABOVE TOP SLAB OF CULVERT, ADDITIONAL
REINFORCEMENT TRANSVERSE TO THE MAIN REINFORCEMENT IS ADDED TO THE 1 50mm
BOTTOM OF THE TOP SLAB IN ACCORDANCE WITH AASHTO 1.3.2.E. VARIES BETWEEN
LEAN CONCRETE 2.40 1.00
800 AND 1200
HEIGHT OF FILL: 0.177
MAXIMUM HEIGHT OF FILL IS 3000mm ABOVE TOP SLAB, FOR HEIGHT OF FILL GREATER LEGEND:
THAN 3000mm SPECIAL DESIGN OF BOX CULVERT SHOULD BE DONE. SECTION A - A' W - WIDTH OF ROADWAY FORMATION
SCALE: 1:40 HORIZONTAL SKEW HORIZONTAL SKEWLENGTH OF BARREL, L
LENGTH OF WINGWALLS H - COVER ABOVE THE CULVERT
ANGLE (α*) SPEED α (mm)
Z - [ ( H + t ) - ( B + 200 ) ] tan Ø
60° L1 = 1.414 c , L2 = 1.035 c 60° 1.1547 [ W + 2Z ] B - t2 + (0.51)(t1)(Wc)
S - SPAN OF BARREL
c = 2.0 ( h + t - 600 ); FOR SLOPE 2:1 h - HEIGHT OF CULVERT OPENING
c = 1.5 ( h + t - 600 ); FOR SLOPE 1.5:1 t - THICKNESS OF CULVERT WALL OR SLAB
Ø - SLOPE OF EMBANKMENT
α - ANGLE OF SKEW