Dsgn Calcs-Loadingpltfrm
Dsgn Calcs-Loadingpltfrm
for
LOADING PLATFORM
ABUDHABI
Name Date
By HJ 28-04-24
Checked
Authorized
Customer - ACE Exterior Cladding Works LLC
Rev.
02
Description
System Scaffold Layher, Hunnebeck id -15 ,scaffold tubes and fittings constructed as loading platform for
for container machine in Abudhabi
Scaffold platform decking consists of primary and secondary s150 beams
Ties provided to building around the scaffold provided for stability as shown in the design
The scaffold will be towers, Layher 1.08 m x 1.08 m grid,Hannebeck 1.0 m x 1.0 m with 1.0 metre lift height - Max
Stiffness of the structure is by diagonal bracing.
Design Loads
Container load /Service load (Total) - 30 ton or 9.61 kN/m² uniformly distributed
Rev.
03
SSL +22.210 m
SSL +27.300 m
SSL +28.900 m
6690
5090 1600
2250
H
DDE-CVS-102
J
1 : 75 A1
1 : 150 A3
B3 800x400
RC SLAB
8000
250mm THK.
B7 600x400
K
650
L
PLATFORM
HAND RAIL
RC SLAB
8000
SSL +22.210 m
250mm THK.
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
Section
B7 600x400
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
M
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
650
N
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
200
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
Post Head Jack
1600
container
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
(BEYOND)
Diago Diag
onal
RC COLUMN
nal
End Frame 10
B2 1000x800
Post Head Jack Solid-34mm (L) 1.5"
Frame 133 Frame 133 Frame 133 Frame 133 Frame 133 Frame 100 Frame 133 Frame 133 Frame 133 Frame 133 Frame 133 Frame 100 Frame 133 Frame 133 Frame 133 Frame 133 Frame 133 Frame 133
6000
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
Diago Diag
nal onal
End Frame 10
End Frame 10
RC SLAB
P
250mm THK.
B1 800x400
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
Post Head Jack
1600
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m
200mm THK.
HAND RAIL
PLATFORM
UPSTAND WALL
Elevation
Plan
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
PLATFORM
HAND RAIL
Scaffold views
Calculation Sheet
04
Rev.
Sheet
Primary S 150 beams
Container load /Service load (Total) - 30 ton or 30000/(12.0 x 2.6)= 9.61 kN/m² uniformly distributed
Live load considered on Loading platform- 0.75 kN/m²
Decking load considered on Loading platform- 0.25 kN/m²
Total service load - 10.61 kN/m²
Service Load on Main primary S150 beam = 10.61 kN/m² x 1.09 m = 11.57 kN/ m
Rev.
05
Secndary S 150 beams
Container load /Service load (Total) - 30 ton or 30000/(12.0 x 2.6)= 9.61 kN/m² uniformly distributed
Live load considered on Loading platform- 0.75 kN/m²
Decking load considered on Loading platform- 0.25 kN/m²
Total service load - 10.61 kN/m²
O.K.
Rev.
06
Wind Load REFERENCES
EN 12811
Calculation Sheet
2600
2250
WIND LOADS
B3 800x400
1000 500 1000
RC SLAB
2570 1090 1090
8000
250mm THK.
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
B7 600x400
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
500
Frame 100 Frame 100
600
650
Diagonal Diagonal
2570 1090 1090
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
500
Frame 100 Frame 100
600
Diagonal Diagonal
B6 600x400
2570 1090 1090
24250
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
Frame 100 Frame 100
600
Diagonal Diagonal
RC SLAB
8000
2570 1090 1090
SSL +22.210 m
250mm THK.
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
Section
B7 600x400
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
Frame 100 Frame 100
650
Diagonal Diagonal
2570 1090 600 1090
Frame 100 Frame 100
600
N
Diagonal Diagonal
2570 1090 1090
200
U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
Post Head Jack
1600
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
Post Head Jack Solid-34mm (L) 1.5"
(BEYOND)
600
Diagonal Diagonal Diag Diag
onal onal
RC COLUMN
2570 1090 1090
End Frame 10
B2 1000x800
Post Head Jack Solid-34mm (L) 1.5"
Diagonal Diagonal
2570 1090 1090
Section
Post Head Jack Solid-34mm (L) 1.5"
Frame 133 Frame 133 Frame 133 Frame 133 Frame 133 Frame 100 Frame 133 Frame 133 Frame 133 Frame 133 Frame 133 Frame 100 Frame 133 Frame 133 Frame 133 Frame 133 Frame 133 Frame 133
6000
Diag Diag
onal onal
End Frame 10
End Frame 10
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
Post Head Jack U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
Post Head Jack Solid-34mm (L) 1.5"
1090
1090
1090
1090
1090
RC SLAB
P
Post Head Jack Solid-34mm (L) 1.5"
250mm THK.
Frame 100 Frame 100
600
Diagonal Diagonal
B1 800x400
2570 1090 1090
Post Head Jack U-Head Jack Solid-34mm, W=18 Cm , 2" ,6mm
1600
Post Head Jack Solid-34mm (L) 1.5"
Q
2570 1090 1090
200
LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m
LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m LADDER 2.50 m
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
Frame 100 Frame 100
600
Diagonal Diagonal
200mm THK.
2570 1090 1090
HAND RAIL
PLATFORM
UPSTAND WALL
12000
Frame 100 Frame 100
600
S150 ALUMINIUM BEAM
Diagonal Diagonal
2570 1090 1090
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
Frame 100 Frame 100
Diagonal Diagonal
2570 1090 600 1090
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
1000
Diagonal
Diagonal
Diagonal
Diagonal
Frame 133
Frame 133
Frame 133
Frame 133
1090
1090
1090
1090
1090
Frame 100 Frame 100
600
Diagonal Diagonal
2570 1090 1090
41.48 kN
33.9 kN
Calculation Sheet
Effective frontal area
= .0483 m {( 64 m ) + ( 148 m )}
= 10.2 m²
Calculation Sheet
Container Area
Extra Horizontal force considered due to vertical load = 2.5 perc of 30 ton = 7.5 kN
Net Horizontal force on Container area = Windforce (Container)+ Horizontal loads -extra
Net Horizontal force on Container area = 33.98 kN+ 7.5 kN = 41.48 kN
Calculation Sheet
< 12.2 kN @ Slip capacity - 2 Double/Swivel coupler in tube ties
O.K.
Tube ties must be provided from the Loading platform structure to permanent structure at
4.0,8.0,16.0,20.0,24.0 28.0,29.0,30.0,32.0 m
During Erection/Didsmantling -Supported scaffolds with a height to base width ratio of more
than four to one (4:1) need to tie to the building structure vertically and horizontally. The
first bottom tie to place no higher than four (4) times the minimum base width. And also,
vertical ties to be at intervals not greater than 4 m
Calculation Sheet
LEG LOAD(LEG - A)
Container load /Service load (Total) - 30 ton or 9.61 kN/m² uniformly distributed
Live load considered on Main platform- 0.75 kN/m²
Service Load on leg A = 10.61 kN/m² x 1.09 m x 0.8 m = 9.2 kN
O.K.
1000 1000 1000
Frame 100
Frame 100
Frame 100
800
Diagonal
Diagonal
Diagonal
Diagonal
Frame 100
Frame 100
Frame 100
Diagonal
Diagonal
Diagonal
Diagonal
1090
1090
Diagonal
1090
Diagonal
1090
Diagonal
1090
1090
1090
1090
600
600
600
1090
1090
Rev.
11
Hunnebeck if frame tower loading capacity
Calculation Sheet
Layher baseplate Loading Capacity
Calculation Sheet
CUPLOCK BACKPROPPING
Frame 133
Frame 133
1600
1600
650
End Frame 10 End Frame 10
RC COLUMN
(BEYOND)
Tributary area of worst case leg A = 1.88 m wide Section x full height
Rev.
14
Top
jack
extension
Top lift
Top lift
0.5m 55 kN
1.0m 44 kN
1.5m 32 kN
2.0m 22 kN
2.5m 15 kN
3.0m 11 kN
Base lift
3.5m 8 kN
Base
jack
extension System Scaffold
and Decking
Technical Information
Sheet
Plywood
90
SPACING MODULE
80
FOR 2438mm x
1219mm.(8'-0"x4'-0")
PLYWOOD:
70
271mm
305mm
60
348mm
406mm
488mm
PRESSURE (kN/m )
2
50
610mm
40
30
20
18mm Thick
Plywood
10
12mm Thick
Plywood
NOMINAL SPAN ( mm ) The above spacings and plywood chart are for guidance only.
Plywood quality and strength must be checked by site.
Deflection limited to 1/270th of the Span Plywood quality and strength is the responsibility of site.
Technical Information
Sheet
Scaffold Tube
Scaffold tube 48.3 mm dia(4 mm tube)
Bending Moment capacity = 1.12 kN-m
Scaffold Tube
Steel Grade - S235GT
Scaffold Tube
Technical Information
Sheet
Fittings
Fittings
Technical Information
Sheet