Professional Documents
Culture Documents
HSE BN PD 35 Management-Of-Change-Standard
HSE BN PD 35 Management-Of-Change-Standard
Contents
Contents
Contents 3
1 Purpose.......................................................................................................................4
2 Application..................................................................................................................4
3 Definition....................................................................................................................4
4 Potential Hazards........................................................................................................4
5 Principle......................................................................................................................4
Appendix B - Management of Change for Personnel & Organization Change Procedure......................12
HSE_BN_PD_35 REV 01
1 Purpose
To provide all employees clear direction with regard to Management of Change (MOC)
requirements for all BNITC Operations.
2 Application
All BNITC Construction, Technology, Engineering Change, and Personal Change.
3 Definition
Qualified means one who, by possession of a recognized degree, certificate, or professional
standing, or who by extensive knowledge, training, and experience, has successfully
demonstrated his ability to solve or resolve problems relating to the subject matter, the work, or
the project.
4 Potential Hazards
Injury and or damage to personnel or equipment due to incorrect risk mitigations &
management of design changes to existing equipment
5 Principle
4.1 Purpose
Corporate and Regulatory compliance
BNITC requirement compliance
To protect BNITC people & asset
To assure that any changes which have the potential to impact the safety, health, and
environment are recognized, evaluated and properly authorized prior to any physical
change occurring, and documented.
4.2 Objectives and specific requirements for BNITC MOC
4.2.1 General Requirements
All MOC processes at any BNITC operation asset facilities for Technology and
Engineering Change are to be addressed in the following methods:
The technical basis for the change proposed,
The impact of change proposed on Asset facilities safety and health,
Technical Review and Risk Assessment by the related qualified personnel
The modification to operating procedures,
Duration,
Authorizations required;
Informing and training employees affected by the change
Updating process safety information and operating procedures or practices.
HSE_BN_PD_35 REV 01
4.4 Training
The appropriate level and type of training for all changes will be identified during
M O C review process and implemented prior to the affected personnel operating the
equipment or process affected by the change. Training due to the MOC process is an
independent training requirement, in addition to BNITC standard training requirement.
4.5 Reporting requirements
BNITC will use a standardized metrics system to implement the monitoring,
measurement, analysis, and improvement MOC process.
Reduce MOC turnaround time 22. Average time require for each of the step
from initiation to . for the MOC process.
implementation
33. Number of MOC request vs. number of
Ensure that all changes to
. MOC close
existing facility manage
4. No Facility Change found at site without
through management of
4 any MOC Documentation.
change process
.
HSE_BN_PD_35 REV 01
Installation
Warranties
HSE_BN_PD_35 REV 01
Based on the technical review and assessment the discipline review team
shall provide the initiating supervisor with those actions which will be
required to ensure the change does not result in exceeding the risk
acceptance criteria for the asset or against regulation.
The review team will retain the final responsibility for verifying and
signing off that the required MOC actions have occurred prior to placing
the change into service. Any change to the scope of work that occurred
during the execution of work area is subject to this MOC standard.
4.6.4 Pre-start Up Safety Review
The intent of the PSSR is to ensure that prior to placing the change into
effect, that the change has been made per design and that all actions
identified during the MOC review process have been implemented as
required.
Minimum requirements include that the pre-startup safety review
confirm the following:
Construction and equipment is in accordance with design specifications
Required risk assessments have been performed and
recommendations implemented
Modified facilities meet the requirements
Training affected employee involved in the process has been
completed or will be completed prior to them being required to
operate the change.
4.6.5 Change Closure
The closure of the change indicates the following:
HSE_BN_PD_35 REV 01
PSSR has been carried out and the required certification have been
obtained.
All related drawing(s) and documentation, including Operating
procedures, have been updated, approved “As Built” and issued.
All necessary environmental and regulatory requirements have
been completed and revised (applicable)
The personnel affected by the change have been inform and trained
The closure change has been verified with the Project Manager.
HSE_BN_PD_35 REV 01