Download as pdf
Download as pdf
You are on page 1of 1
SOLAR PV {600-1500)v 2.5MVA aay HT mODULES (400-1000 / SWITCHGEAR PANEL poeee--- = Saw — STAN | sour ONTORNG} uN ——— []] 10 Bess a ‘33RV INTERFACING BAY AT SS 2 SOLAR FY AUX. SYSTEM——{~ aces o\o Lasky UG cane g sess aun evsrem | L ‘APPROX T-5KiM g — 3 Aux rato spare 2 {400-1000V)/433 V L | a BATTERY sti — 2sMva {400-1000)v / 338 Notes: |LTHE BUS BAR, BAY LAYOUT ARRANGEMENT, & SWITCHING SCHEME SHALL BE AS PER PROJECT REQUIREMENT. 2DETALS PROVIDED IN SLD IS INDICATIVE ONLY FOR SHOWING POWER EVACUATION. {LRATING OF SWITCHYARD AND OTHER EQUIPMENTS INCLUDING BAY SHALL BE AS PER THE SYSTEM Pome ang omotam REQUIREMENT AND SAME SHALL BE FINALISED DURING DETAIL ENGINEERING AFTER LOA ‘439KV HT SWITCHGEAR PANEL SHALL HAVE BI DIRECTIONAL TR! VECTOR METER (ABT TOD} 0.25 CLASS aT £5 ABS IN ALL VERTICALS. 2NW (AC SOLAR PY POWER PLANT (2 2HWE DC) 45 MH BATTERY ENERGY STORAGE SYSTEN. '.NUMERICAL AND OTHER PROTECTION RELAYS SHALL BE PROVIDED IN 33KV SWITCHGEAR PANEL AND ENSURE BATTERY WILL CHARGE FROM SOLAR POWER ONLY. PAVAGADA ULTRA MEGA SOLAR PARK OF TUMAKURU DISTRICT 6.BATTERY CHARGING THROUGH BESCOM GRID IS NOT ALLOWED. @ Karnataka Renewable Energy Development Limited a Pe Toft i cg

You might also like