RLP-1600-SDT-45539_A03 (PIPE BRIDGE 11E)
RLP-1600-SDT-45539_A03 (PIPE BRIDGE 11E)
Document No.
1 RLP-1600-SDT-45531 Revision No A02
RLP-1600-SDT-45532 A02
RLP-1600-SDT-45533 A02
RLP-1600-SDT-45534 A02
RLP-1600-SDT-45535 A02
RLP-1600-SDT-45536 A02
RLP-1600-SDT-45537 A02
RLP-1600-SDT-45538 A02
RLP-1600-SDT-45539 A02
RLP-1600-SDT-45540 A02
RLP-1600-SDT-45541 A02
RLP-1600-SDT-45542 A02
RLP-1600-SDT-45543 A02
RLP-1600-SDT-45544 A02
RLP-1600-SDT-45545 A02
RLP-1600-SDT-45546 A02
RLP-1600-SDT-45547 A02
RLP-1600-SDT-45547 A02
DEL
Item
DEL Comment Vendor Resolution Respo Remarks
No
nse
1 Refer attached comments
General Comments:
1.The calculation note shall be 1. Updated as per outputs of
submitted and the same shall be geotechnical investigation.
reverified with the outputs of the (Attachment -13 Soil Bearing Capacity
ongoing geotechnical investigation. Evaluation.)
1
Code: 1 – Approved without comments; proceed to next issue purpose (if applicable)
2 – Approved with comments; proceed to next issue purpose after incorporating comments
3 – Rejected; re-submit for same issue purpose after incorporating comments
4 – Information
5 – Reviewed without comments; proceed to next issue purpose (if applicable)
6 – Reviewed with comments; proceed to next issue purpose after incorporating comments
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)
DEL
Item
DEL Comment Vendor Resolution Respo Remarks
No
nse
2.Piping GA number shall be 2. Updated in reference drawing list for
included in reference drawing list - Piping GA number.
earlier comment not incorporated.
3.The UG scanning report and 3. Noted for UG scanning report and
drawings to be submitted. drawings.
4.The UNDERGROUND SCANNING 4. Attachment-12 checked based on UG
for many areas is not complete the scan report.
provided sizes shall be checked at
all the locations post completion of
UG scanning activity Chiyoda shall
reverify and revise the drawings
with respect to UG scanning data,
non-compliance of this procedure
is not acceptable.
5. The Demolition drawing submitted
5.The facilities which are required to
separately and mentioned in
be demolished due to the new pipe
reference drawing list.
bridges and its foundation shall be
included in the separate demolition
drawings – Repetitive comment.
6.DEL is only doing PEER review of 6. Noted and checked.
the submitted documents; Chiyoda
shall ensure proper checking
before submission.
RLP-1600-SDT-45532: RLP-1600-SDT-45532:
1. The drawing shall be reverified 1. Updated as per outputs of
and re-submitted with respect to geotechnical investigation.
the outputs of the ongoing (Attachment -13 Soil Bearing Capacity
geotechnical investigation. Evaluation.)
2. The location shall be reverified 2. Updated as per UG Scanning Report.
with respect to the ongoing UG
scanning.
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)
DEL
Item
DEL Comment Vendor Resolution Respo Remarks
No
nse
Pipe bridge-11b Pipe bridge-11b
RLP-1600-SDT-45533: RLP-1600-SDT-45533:
1. The location shall be reverified 1. Updated as per UG Scanning Report.
with respect to the ongoing UG
scanning. 2. The cage ladder orientation as per
2. The cage ladder orientation shall piping requirement and UG condition
be modified to east side with already checked.
respect to the piping requirement
and the member UB254x25
provided is not safe and will fail.
RLP-1600-SDT-45534: RLP-1600-SDT-45534:
1. The drawing shall be reverified 1. Updated as per outputs of
and re-submitted with respect to geotechnical investigation.
the outputs of the ongoing (Attachment -13 Soil Bearing Capacity
geotechnical investigation. Evaluation.)
2. The location shall be reverified 2. Updated as per UG Scanning Report.
with respect to the ongoing UG
scanning.
RLP-1600-SDT-45536: RLP-1600-SDT-45536:
1. The items getting demolished to 1. The Demolition drawing submitted
be included in separate drawing. separately and mentioned in
reference drawing list.
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)
DEL
Item
DEL Comment Vendor Resolution Respo Remarks
No
nse
Pipe bridge-11e Pipe bridge-11e
RLP-1600-SDT-45540: RLP-1600-SDT-45540:
1. The foundation size shall be 1. Updated as per Calculation.
revised to be in line with the
calculation. 2. The Demolition drawing submitted
2. The items getting demolished to separately and mentioned in
be included in separate drawing reference drawing list.
RLP-1600-SDT-45544: RLP-1600-SDT-45544:
1. The foundation at grid B shall be 1. Updated for foundation at grid B as
revised to suit the existing per suit the existing underground
Underground pipelines. pipelines.
2. The items getting demolished to 2. The Demolition drawing submitted
be included in separate drawing. separately.
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BILL OF MATERIALS
DESCRIPTION QUANTITY
A B C MAIN STEEL (ton) 20.819
A03
LADDER (ton) 0.163
12600 14600
HANDRAIL (ton) 0.140
A A
10000 2600 2600 12000 GRATING (m²) 2.520
STAIR THREAD (ton) -
2100 2100 2100 2100 1600 500 2100 1825 775 1050 1825 1825 1825 1825 1825 1825 ANCHOR BOLTS (nos.) 24-B36
(NOTE 7)
(NOTE 7)
(THIS MTO PROVIDED FOR INFORMATION ONLY.
A03 A03
SPLICE
SPLICE
350 350 350 350 350 350 350 350 350 350 350 350 350 350 CONTRACTOR SHALL ESTIMATE THE MTO AS PER GIVEN DETAILS.)
A03
UB406x67/EM UB406x67/EM UB406x67/EM UB406x67/EM
A03 NOTES
2 1. ALL DIMENSIONS ARE IN MILLIMETERS. ELEVATIONS & COORDINATES ARE IN
METERS, UNLESS NOTED OTHERWISE.
1000
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x31/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x31/SS
PLANT RE. 0.00 = QNG E. 231371.27
2000
HANDRAIL 200 13. FOR STANDARD DRAWING FOR LADDER, REFER TO STANDARD
DWG NO. DOL-0000-SST-10184, DOL-0000-SST-10185 & DOL-0000-SST-10186.
(NOTE 7)
UB254x25/SS 30mm THK GRATING
SPLICE
100
LEGEND
UB254x25/SR
UB254x25/SR
(NOTE 7)
A03 A03
1200
SPLICE
350 350 350 350 350 350 350 350 350 350 350 350 350
A03 A03 TOS : TOP OF STEEL
450
UB : UNIVERSAL BEAM
UB254x25/SR
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UB254x25/SS
UC254x73/SS
UC254x73/SS
UC254x73/SS
UC254x73/SS
UC254x73/SS
UC254x73/SS
WP : WORKING POINT
2000
1000
A B C 1 2
12600 14600 2000
1000 2100 2100 2100 2100 2100 500 1825 775 1050 1825 1825 1825 1825 1825 1825 700 500 800
(NOTE 7)
SPLICE
(NOTE 7)
SPLICE
120
A03 A03 A03 A03
UB406x67/EM UB406x67/EM UB406x67/EM UB406x67/EM TOS EL+107.300 UB254x31/SS
F F
1300
L1 L1
L10
/LT /LT
T
0 00 1200
L10
0/L
0/L
2000
0/L
00 0
L10
L10
L10
/LT
T
0/L
10
0/L
0/L
0/L
0/L
L100/LT
T
L100/LT
L100/LT
L100/LT
L100/LT
L100/LT
L100/LT
L100/LT
L100/LT
L100/LT
L100/LT
L10
L1
L10
L
0/L
0/L
0/L
T
L10
L10
L10
T
HANDRAIL
T
LT
0 0/
CT
L1
WP (TYP) 17 1
CT
/LT
1/
14
A03 A03 A03
71
LT 1
6/L
1
2550
CT
T
1 1
G 1 1 G
UC356x202/BP
REV. DATE DESCRIPTION PREPARED CHECKED APPROVED APPROVAL
200
This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted
in any form or by any means, or used for any purpose other than that which it is specifically furnished
UC356x202/BP
UC356x202/BP
UC356x202/BP
without the written consent of Dolphin Energy Ltd.
T
6/L
DOLPHIN ENERGY LIMITED
2550
14
CHIYODA
CT
UC356x202/BP
ONSHORE FACILITIES GROUP
WP (TYP) DOLPHIN FMP-0000-3014 - FEED STUDY TCW LONG TERM
ENERGY
SOLUTION PHASE-1 QC-TSU-086/DELT-21051
350
BOS EL+100.200
H FRAMING PLAN, ELEVATION, SECTION H
AND CONNECTION DETAILS
PIPE BRIDGE - 11e
ELEVATION AT GRID 1 AND 2 ELEVATION AT GRID A,B AND C
ORIG. DWG. SIZE : A1 SCALE : 1:50 CAD FILE : RLP-1600-SDT-45539.dwg CLASS: - REV.
COMPANY DWG. NO.: CONTRACTOR/CONSULTANT DWG. NO.:
RLP-1600-SDT-45539 - A03
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16