Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Dolphin Energy Management System

Doc. No.: DEMS-UB-TS-DRM-FM-047


External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)

Document No.
1 RLP-1600-SDT-45531 Revision No A02
RLP-1600-SDT-45532 A02
RLP-1600-SDT-45533 A02
RLP-1600-SDT-45534 A02
RLP-1600-SDT-45535 A02
RLP-1600-SDT-45536 A02
RLP-1600-SDT-45537 A02
RLP-1600-SDT-45538 A02
RLP-1600-SDT-45539 A02
RLP-1600-SDT-45540 A02
RLP-1600-SDT-45541 A02
RLP-1600-SDT-45542 A02
RLP-1600-SDT-45543 A02
RLP-1600-SDT-45544 A02
RLP-1600-SDT-45545 A02
RLP-1600-SDT-45546 A02
RLP-1600-SDT-45547 A02
RLP-1600-SDT-45547 A02

FRAMING PLAN, Review 02


Title ELEVATION, SECTION Approval
AND CONNECTION
Code
DETAILS PIPE BRIDGE

Approver VIDHYADARAN Date of Issue 05/Jan/2023


SEKARAN

Contractor/Vendor CHY-QC-TSU-086-TR- DEL Transmittal DEL-QC-TSU-086-TR-0225


Transmittal 00191 Reference
Reference

DEL
Item
DEL Comment Vendor Resolution Respo Remarks
No
nse
1 Refer attached comments

General Comments:
1.The calculation note shall be 1. Updated as per outputs of
submitted and the same shall be geotechnical investigation.
reverified with the outputs of the (Attachment -13 Soil Bearing Capacity
ongoing geotechnical investigation. Evaluation.)

1
Code: 1 – Approved without comments; proceed to next issue purpose (if applicable)
2 – Approved with comments; proceed to next issue purpose after incorporating comments
3 – Rejected; re-submit for same issue purpose after incorporating comments
4 – Information
5 – Reviewed without comments; proceed to next issue purpose (if applicable)
6 – Reviewed with comments; proceed to next issue purpose after incorporating comments
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)

DEL
Item
DEL Comment Vendor Resolution Respo Remarks
No
nse
2.Piping GA number shall be 2. Updated in reference drawing list for
included in reference drawing list - Piping GA number.
earlier comment not incorporated.
3.The UG scanning report and 3. Noted for UG scanning report and
drawings to be submitted. drawings.
4.The UNDERGROUND SCANNING 4. Attachment-12 checked based on UG
for many areas is not complete the scan report.
provided sizes shall be checked at
all the locations post completion of
UG scanning activity Chiyoda shall
reverify and revise the drawings
with respect to UG scanning data,
non-compliance of this procedure
is not acceptable.
5. The Demolition drawing submitted
5.The facilities which are required to
separately and mentioned in
be demolished due to the new pipe
reference drawing list.
bridges and its foundation shall be
included in the separate demolition
drawings – Repetitive comment.
6.DEL is only doing PEER review of 6. Noted and checked.
the submitted documents; Chiyoda
shall ensure proper checking
before submission.

Pipe bridge-11a Pipe bridge-11a


RLP-1600-SDT-45531: RLP-1600-SDT-45531:
1. The location shall be reverified 1. Updated as per UG Scanning Report.
with respect to the ongoing UG
scanning.

RLP-1600-SDT-45532: RLP-1600-SDT-45532:
1. The drawing shall be reverified 1. Updated as per outputs of
and re-submitted with respect to geotechnical investigation.
the outputs of the ongoing (Attachment -13 Soil Bearing Capacity
geotechnical investigation. Evaluation.)
2. The location shall be reverified 2. Updated as per UG Scanning Report.
with respect to the ongoing UG
scanning.

© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)

DEL
Item
DEL Comment Vendor Resolution Respo Remarks
No
nse
Pipe bridge-11b Pipe bridge-11b
RLP-1600-SDT-45533: RLP-1600-SDT-45533:
1. The location shall be reverified 1. Updated as per UG Scanning Report.
with respect to the ongoing UG
scanning. 2. The cage ladder orientation as per
2. The cage ladder orientation shall piping requirement and UG condition
be modified to east side with already checked.
respect to the piping requirement
and the member UB254x25
provided is not safe and will fail.

RLP-1600-SDT-45534: RLP-1600-SDT-45534:
1. The drawing shall be reverified 1. Updated as per outputs of
and re-submitted with respect to geotechnical investigation.
the outputs of the ongoing (Attachment -13 Soil Bearing Capacity
geotechnical investigation. Evaluation.)
2. The location shall be reverified 2. Updated as per UG Scanning Report.
with respect to the ongoing UG
scanning.

Pipe bridge-11c Pipe bridge-11c


RLP-1600-SDT-45535: RLP-1600-SDT-45535:
1. The cage ladder orientation shall 1. The cage ladder orientation as per
be modified to east side with piping requirement and UG condition
respect to the piping requirement already checked.
and the member UB254x25
provided is not safe and will fail.

RLP-1600-SDT-45536: RLP-1600-SDT-45536:
1. The items getting demolished to 1. The Demolition drawing submitted
be included in separate drawing. separately and mentioned in
reference drawing list.

Pipe bridge-11d Pipe bridge-11d


RLP-1600-SDT-45538: RLP-1600-SDT-45538:
1. The foundation size shall be 1. Updated as per Calculation.
revised to be in line with the
calculation. 2. The Demolition drawing submitted
2. The items getting demolished to separately and mentioned in
be included in separate drawing. reference drawing list.

© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)

DEL
Item
DEL Comment Vendor Resolution Respo Remarks
No
nse
Pipe bridge-11e Pipe bridge-11e
RLP-1600-SDT-45540: RLP-1600-SDT-45540:
1. The foundation size shall be 1. Updated as per Calculation.
revised to be in line with the
calculation. 2. The Demolition drawing submitted
2. The items getting demolished to separately and mentioned in
be included in separate drawing reference drawing list.

Pipe bridge-11f Pipe bridge-11f


RLP-1600-SDT-45542: RLP-1600-SDT-45542:
1. The items getting demolished to 1. The Demolition drawing submitted
be included in separate drawing. separately and mentioned in
reference drawing list.
Pipe bridge-11g
RLP-1600-SDT-45543: Pipe bridge-11g
1. The member section properties RLP-1600-SDT-45543:
of the section mark for the top 1. Noted and updated.
chord member is missed for a
secondary member at
EL+108.500 (TOS).

RLP-1600-SDT-45544: RLP-1600-SDT-45544:
1. The foundation at grid B shall be 1. Updated for foundation at grid B as
revised to suit the existing per suit the existing underground
Underground pipelines. pipelines.
2. The items getting demolished to 2. The Demolition drawing submitted
be included in separate drawing. separately.

Pipe bridge-11h Pipe bridge-11h


RLP-1600-SDT-45546: RLP-1600-SDT-45546:
1. The foundation at grid C shall be 1. Updated for foundation at grid C as
revised to suit the existing per suit the existing underground
Underground pipelines. pipelines.
2. The items getting demolished to 2. The Demolition drawing submitted
be included in separate drawing separately.

Pipe bridge-11j Pipe bridge-11j


RLP-1600-SDT-45548: RLP-1600-SDT-45548:
1. The items getting demolished to 1. The Demolition drawing submitted
be included in separate drawing separately.

© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

BILL OF MATERIALS

DESCRIPTION QUANTITY
A B C MAIN STEEL (ton) 20.819
A03
LADDER (ton) 0.163
12600 14600
HANDRAIL (ton) 0.140
A A
10000 2600 2600 12000 GRATING (m²) 2.520
STAIR THREAD (ton) -
2100 2100 2100 2100 1600 500 2100 1825 775 1050 1825 1825 1825 1825 1825 1825 ANCHOR BOLTS (nos.) 24-B36

(NOTE 7)

(NOTE 7)
(THIS MTO PROVIDED FOR INFORMATION ONLY.
A03 A03

SPLICE

SPLICE
350 350 350 350 350 350 350 350 350 350 350 350 350 350 CONTRACTOR SHALL ESTIMATE THE MTO AS PER GIVEN DETAILS.)
A03
UB406x67/EM UB406x67/EM UB406x67/EM UB406x67/EM
A03 NOTES
2 1. ALL DIMENSIONS ARE IN MILLIMETERS. ELEVATIONS & COORDINATES ARE IN
METERS, UNLESS NOTED OTHERWISE.
1000

2. ALL COORDINATES REFER TO PLANT GRID AND METERS.


PLANT RN. 0.00 = QNG N. 458867.09
UB254x31/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x31/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x31/SS
PLANT RE. 0.00 = QNG E. 231371.27
2000

PLANT NORTH IS 27°57'12" EAST FROM THE TRUE NORTH


1000

3. FINISHED GRADE ELEVATIONS:


B BASE LEVEL= +1900, B
1 UB406x67/EM UB406x67/EM UB406x67/EM UB406x67/EM
QNHD=HIGH POINT OF PAVING (HPP) = EL+100.000 M.
4. FOR GENERAL NOTES OF STEEL STRUCTURE WORKS, REFER TO STANDARD
L100/LT (-100mm TOS) (TYP) WP (TYP) DWG NO. DOL-0000-SST-10001.
PE: 488.800
PN: 838.300 5. FOR STANDARD DRAWING MEMBER LIST, REFER TO STANDARD
A03 A03 A03 A03 DWG NO. DOL-0000-SST-10002.
6. FOR STANDARD CONNECTION DETAILS, REFER TO STANDARD
FRAMING PLAN AT EL+107.300 TOS DWG NOS. DOL-0000-SST-10101, DOL-0000-SST-10105,
DOL-0000-SST-10107, DOL-0000-SST-10112, DOL-0000-SST-10121, A03
DOL-0000-SST-10125, DOL-0000-SST-10131 & DOL-0000-SST-10132.
7. FOR SPLICE CONNECTION DETAIL, REFER TO STANDARD
DWG NO. DOL-0000-SST-10136.
8. FOR ELECRTICAL CONTINUITY REFER TO DWG. NO . DOL-0000-SST-00004.

A B C 9. THIS DRAWING SHOWS INDICATIVE PRELIMINARY INFORMATION. ALL FINAL


REQUIREMENTS SHALL BE FINALIZED DURING DETAILED ENGINEERING PHASE.
C 10. STEEL COLUMN SHALL BE CONNECTED TO THE NEAREST AVAILABLE EARTH GRID. C
12600 14600
EPC CONTRACTOR TO COORDINATE WITH ELECTRICAL DISCIPLINE FOR THE DETAILS.
A03 11. FOR STANDARD DRAWING FOR GRATING FLOOR, REFER TO STANDARD
600 11000 1600 2600 12000 DWG NO. DOL-0000-SST-10190.
12. FOR STANDARD DRAWING FOR HANDRAIL, REFER TO STANDARD
2100 2100 2100 2100 2600 500 1825 775 1050 1825 1825 1825 1825 1825 1825 DWG NO. DOL-0000-SST-10187, DOL-0000-SST-10188 & DOL-0000-SST-10189.
℄ LADDER

HANDRAIL 200 13. FOR STANDARD DRAWING FOR LADDER, REFER TO STANDARD
DWG NO. DOL-0000-SST-10184, DOL-0000-SST-10185 & DOL-0000-SST-10186.

(NOTE 7)
UB254x25/SS 30mm THK GRATING

SPLICE
100

LEGEND
UB254x25/SR
UB254x25/SR

(NOTE 7)
A03 A03
1200

SPLICE
350 350 350 350 350 350 350 350 350 350 350 350 350
A03 A03 TOS : TOP OF STEEL
450

UB406x67/EM UB406x67/EM UB406x67/EM UB406x67/EM


BOS : BOTTOM OF STEEL
2 UB254x25/EM UC : UNIVERSAL COLUMN
D D
1000

UB : UNIVERSAL BEAM
UB254x25/SR

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS
UC254x73/SS

UC254x73/SS

UC254x73/SS

UC254x73/SS

UC254x73/SS

UC254x73/SS
WP : WORKING POINT
2000

1000

1 UB406x67/EM UB406x67/EM UB406x67/EM UB406x67/EM


350
L100/LT (-100mm TOS) (TYP) WP (TYP)
L100/LT (-100mm TOS) (TYP) A03 A03 A03 A03 ISSUED FOR APPROVAL
FRAMING PLAN AT EL+105.300 TOS REFERENCE DRAWINGS
DRAWING NUMBER TITLE
E E
RLP-1600-SDT-45540 FOUNDATION PLAN AND SECTION - PIPE BRIDGE 11e
A03 RLP-1600-SCA-45511 CALCULATION NOTE FOR PIPE BRIDGE - 11
RLP-0000-LGA-45501 PIPING GA KEY PLAN FOR ABOVE GROUND TCW PIPING NETWORK INSTALLATION IN STREAM-1 AND STREAM-2 PROJECT

A B C 1 2
12600 14600 2000

11000 1600 2600 12000

1000 2100 2100 2100 2100 2100 500 1825 775 1050 1825 1825 1825 1825 1825 1825 700 500 800
(NOTE 7)
SPLICE

(NOTE 7)
SPLICE

350 350 350 350

120
A03 A03 A03 A03
UB406x67/EM UB406x67/EM UB406x67/EM UB406x67/EM TOS EL+107.300 UB254x31/SS
F F

1300
L1 L1
L10

/LT /LT

T
0 00 1200
L10

0/L
0/L

2000
0/L

00 0
L10

L10

L10

/LT

T
0/L

10

0/L

0/L

0/L
0/L

L100/LT

T
L100/LT

L100/LT

L100/LT

L100/LT

L100/LT

L100/LT

L100/LT

L100/LT

L100/LT

L100/LT

L10
L1
L10

L
0/L

0/L

0/L
T

L10

L10

L10
T

HANDRAIL
T

Ø14" PIPE Ø14" PIPE

UB254x25/EM TOS EL+105.300 UB254x25/SR THIS DRAWING

FOR GRID 2 ONLY


UB406x67/EM UB406x67/EM UB406x67/EM UB406x67/EM UC254x73/SS KEY PLAN

LT
0 0/
CT

L1
WP (TYP) 17 1

CT
/LT

1/

14
A03 A03 A03
71

LT 1

6/L
1

2550
CT

T
1 1
G 1 1 G

A03 A03 FOR GRID A ONLY


A03 23JAN'23 ISSUED FOR APPROVAL W.A R.M F.M

UB254x31/SS A02 28DEC'22 ISSUED FOR APPROVAL W.A R.M F.M


TOS EL+102.750
R01 23OCT'22 ISSUED FOR REVIEW W.A R.M F.M
DEL

UC356x202/BP
REV. DATE DESCRIPTION PREPARED CHECKED APPROVED APPROVAL

200
This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted
in any form or by any means, or used for any purpose other than that which it is specifically furnished
UC356x202/BP

UC356x202/BP

UC356x202/BP
without the written consent of Dolphin Energy Ltd.

T
6/L
DOLPHIN ENERGY LIMITED

2550

14
CHIYODA

CT

UC356x202/BP
ONSHORE FACILITIES GROUP
WP (TYP) DOLPHIN FMP-0000-3014 - FEED STUDY TCW LONG TERM
ENERGY
SOLUTION PHASE-1 QC-TSU-086/DELT-21051

350
BOS EL+100.200
H FRAMING PLAN, ELEVATION, SECTION H
AND CONNECTION DETAILS
PIPE BRIDGE - 11e
ELEVATION AT GRID 1 AND 2 ELEVATION AT GRID A,B AND C
ORIG. DWG. SIZE : A1 SCALE : 1:50 CAD FILE : RLP-1600-SDT-45539.dwg CLASS: - REV.
COMPANY DWG. NO.: CONTRACTOR/CONSULTANT DWG. NO.:
RLP-1600-SDT-45539 - A03
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like