RLP-1600-SDT-45510_A03 (PIPE BRIDGE 4)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Dolphin Energy Management System

Doc. No.: DEMS-UB-TS-DRM-FM-047


External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)

Document No.
1 RLP-1600-SDT-45510 Revision No A02
RLP-1600-SDT-45512
Review
FRAMING PLAN, Approval
Code 02
FOUNDATION PLAN
Title
ELEVATION, SECTION
AND CONNECTION

Approver Saravanan Lakshmanan Date of Issue 22/Dec2022

Contractor/Vendor CHY-QC-TSU-086-TR- DEL Transmittal DEL-QC-TSU-086-TR-0173


Transmittal 00154 Reference
Reference

Item DEL
DEL Comment Vendor Resolution Remarks
No Response
Calculation report for the pipe bridge Noted and revised
1 shall be submitted for company calculation note is
approval submitted as IFA rev. A02
Provide reference doc number in Noted and revised. Please
structural drawing; STANDARDS refer to added notes in
DRAWING GRATING FLOOR-DOL- each drawing.
0000-SST-10190 &STANDARDS
DRAWING HANDRAIL DOL-0000-
SST-10187,88 & 89 :STANDARDS
DRAWING LADDER-DOL-0000-
SST-10184,85& 86
2
& Reference doc number in
foundation drawing: DOL-0000-SST-
00009-STANDARD FOUNDATIONS
FOR STAIRS AND LADDERS.

DOL-0000-SST-10132-
STANDARDS DRAWING BP
CONNECTION

1
Code: 1 – Approved without comments; proceed to next issue purpose (if applicable)
2 – Approved with comments; proceed to next issue purpose after incorporating comments
3 – Rejected; re-submit for same issue purpose after incorporating comments
4 – Information
5 – Reviewed without comments; proceed to next issue purpose (if applicable)
6 – Reviewed with comments; proceed to next issue purpose after incorporating comments
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

BILL OF MATERIALS

DESCRIPTION QUANTITY
18000 MAIN STEEL (ton) 16.090
LADDER (ton) 0.290
12000 6000
HANDRAIL (ton) 0.040
A A
2250 2250 2250 2250 2250 750 1500 2250 2250 GRATING (m²) 306.000
STAIR THREAD (ton) -

(NOTE 7)
SPLICE
350 200 200 200 200 200 200 350 ANCHOR BOLTS (nos.) 16-B36
UB356x51/EM UB356x51/EM (THIS MTO PROVIDED FOR INFORMATION ONLY.
CONTRACTOR SHALL ESTIMATE THE MTO AS PER GIVEN DETAILS.)
NOTES
L1 L10 ) L10 L10 S) 1. ALL DIMENSIONS ARE IN MILLIMETERS. ELEVATIONS & COORDINATES ARE IN
00 S) 0/L S 0/L S) 0/L TO
/LT TO T( TO T( TO T m METERS, UNLESS NOTED OTHERWISE.
1750

(-1
00 0m
m -10 0 mm -10 0m
m (-1
00 00m 2. ALL COORDINATES REFER TO PLANT GRID AND METERS.
mm (-1
0 0m
m ( -10 0m
m (-1
0 mm (-1
TO 0/L
T TO 0 /LT TO 0 /LT TO 0 /LT PLANT RN. 0.00 = QNG N. 458867.09
S) L10 S) L10 S) L10 S) L 10 PLANT RE. 0.00 = QNG E. 231371.27
3500

PLANT NORTH IS 27°57'12" EAST FROM THE TRUE NORTH


L10 S) L10 S) L10 S) L1
S) 3. FINISHED GRADE ELEVATIONS:
UB254x31/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x31/SS
0/L TO 0/L TO 0/L TO 00
TO T T( T( /LT BASE LEVEL= +1900,
B
mm (-1 0 mm -10 0 mm -10 mm (-1
B

UB254x25/SS

UB254x25/SS

UB254x25/SS

UB254x25/SS
0 00 0 0m 0 0m 00 0 QNHD=HIGH POINT OF PAVING (HPP) = EL+100.000 M.
-10 mm (-1 (-1 (-1 0m
1750

( T m m
T TO /L TO /LT TO /L T m
0/L S) L100 S) L100 S) L100 TO 4. FOR GENERAL NOTES OF STEEL STRUCTURE WORKS, REFER TO STANDARD
L 10 S) DWG NO. DOL-0000-SST-10001.
5. FOR STANDARD DRAWING MEMBER LIST, REFER TO STANDARD
DWG NO. DOL-0000-SST-10002.
UB356x51/EM UB356x51/EM 6. FOR STANDARD CONNECTION DETAILS, REFER TO STANDARD
DWG NOS. DOL-0000-SST-10101, DOL-0000-SST-10105,
PE: 524.879 DOL-0000-SST-10107, DOL-0000-SST-10112, DOL-0000-SST-10121,
PN: 884.150 WP (TYP)
FRAMING PLAN AT EL+109.300 TOS DOL-0000-SST-10125, DOL-0000-SST-10131 & DOL-0000-SST-10132. A03
7. FOR SPLICE CONNECTION DETAIL, REFER TO STANDARD
DWG NO. DOL-0000-SST-10136.
18000 8. FOR ELECTRICAL CONTINUITY REFER TO DWG. NO. DOL-0000-SST-00004.
9. THIS DRAWING SHOWS INDICATIVE PRELIMINARY INFORMATION. ALL FINAL
12000 6000 REQUIREMENTS SHALL BE FINALIZED DURING DETAILED ENGINEERING PHASE.
C 10. STEEL COLUMN SHALL BE CONNECTED TO THE NEAREST AVAILABLE EARTH GRID. C
2250 2250 2250 2250 2250 750 1500 2250 2250 EPC CONTRACTOR TO COORDINATE WITH ELECTRICAL DISCIPLINE FOR THE DETAILS.
11. FOR STANDARD DRAWING FOR GRATING FLOOR, REFER TO STANDARD
A03 DWG NO. DOL-0000-SST-10190.

(NOTE 7)
SPLICE
350 200 200 200 200 200 200 350
12. FOR STANDARD DRAWING FOR HANDRAIL, REFER TO STANDARD
UB356x51/EM UB356x51/EM DWG NO. DOL-0000-SST-10187, DOL-0000-SST-10188 & DOL-0000-SST-10189.
13. FOR STANDARD DRAWING FOR LADDER, REFER TO STANDARD
DWG NO. DOL-0000-SST-10184, DOL-0000-SST-10185 & DOL-0000-SST-10186.
L1 L10 ) L10 L10 S)
00 S) 0/L S 0/L S) 0/L TO
/LT TO TO TO
T( T( T m LEGEND
1750

(-1 m m m
00 00m -10
0 0m -10
00m (-1
00 00m
mm (-1 0m
m (-1 0m
m (-1 mm (-1
TO 0/L
T TO 0 /LT TO 0 /LT TO 0 /LT
S) L10 S) L10 S) L10 S) L 10
TOS : TOP OF STEEL
3500

BOS : BOTTOM OF STEEL


L10 S) L10 ) L10 S) L1
S) S
UB254x25/SS

UB254x25/SS
UC305x97/SL

UC305x97/SL

UC305x97/SL
0/L TO 0/L TO 0/L TO 00 UC : UNIVERSAL COLUMN
D TO T T( T( /LT D
mm (-1 mm -10 mm -10 mm (-1 UB : UNIVERSAL BEAM
℄ LADDER

UB254x25/SR

0 0
UB254x25/SS

UB254x25/SS

UB254x25/SS
0 00 0
-10 mm -10 0m -10 0m -10 0 0m
1750

( m T( m (
T( TO /LT TO 0/L TO /LT m WP : WORKING POINT
0 0/L S) L100 S) L10 S) L100 TO
S) CT : TEE
L1
UB254x25/EM
L10
450

0/L UB356x51/EM UB356x51/EM


UB254x25/SR

UB254x25/SR

T (-1
1200

00m
mT WP (TYP)
OS
) FRAMING PLAN AT EL+106.800 TOS
UB254x25/SS ISSUED FOR APPROVAL
100

600 200
HANDRAIL REFERENCE DRAWINGS
30mm THK GRATING
1000
DRAWING NUMBER TITLE
E E
RLP-1600-SDT-45512 FOUNDATION PLAN AND SECTION - PIPE BRIDGE - 4
A03 RLP-1600-SCA-45504
RLP-0000-LGA-45501
CALCULATION NOTE FOR PIPE BRIDGE - 4
PIPING GA KEY PLAN FOR ABOVE GROUND TCW PIPING NETWORK INSTALLATION IN STREAM-1 AND STREAM-2 PROJECT
3500

1000 12000 6000 1750 1750

2250 2250 2250 2250 2250 750 1500 2250 2250


(NOTE 7)
SPLICE

350 350
120

120
TOS EL+109.300 UB356x51/EM UB356x51/EM TOS EL+109.300 UB254x31/SS

1300 1201 1102 1197


F F
L10

T
L10

L10

L10

Ø36" PIPE
2500

2500
T

T
L100/LT

L100/LT

L100/LT

L100/LT

L100/LT

L100/LT
Ø36" PIPE Ø36" PIPE

0/L
0/L

0/L

0/L
L100/LT
0

0/L

0/L

0/L

1200

L10
L10

L10

L10
/LT

HANDRAIL

TOS EL+106.800 UB254x25/EM TOS EL+106.800 UB254x25/SR UC305x97/SL

THIS DRAWING
UB356x51/EM UB356x51/EM

1200
KEY PLAN

L1
FOR GRID B ONLY

00
WP (TYP)

/
LT

CT1
LT
46/

46/
CT1
3300

LT
G FOR GRID 1 ONLY G
f.
A03 12JAN'22 ISSUED FOR APPROVAL M.Y R.M F.M

A02 19DEC'22 ISSUED FOR APPROVAL (REVIEWED BY DEL-PMT) M.Y R.M F.M

TOS EL+103.500 UB254x31/SS R01 20SEPT'22 ISSUED FOR REVIEW M.Y R.M F.M

200
6600

REV. DATE DESCRIPTION DEL


PREPARED CHECKED APPROVED APPROVAL
This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted
in any form or by any means, or used for any purpose other than that which it is specifically furnished
without the written consent of Dolphin Energy Ltd.

UC356x202/BP

UC356x202/BP
DOLPHIN ENERGY LIMITED CHIYODA

CT1
LT
ONSHORE FACILITIES

46/
GROUP
UC356x202/BP

UC356x202/BP

46/
CT1

LT
DOLPHIN FEED STUDY TCW LONG TERM

3300
ENERGY
SOLUTION PHASE-1 QC-TSU-086/DELT-21051

H WP (TYP) FRAMING PLAN, ELEVATION, SECTION H


AND CONNECTION DETAILS
PIPE BRIDGE - 4

350
BOS EL+100.200 BOS EL+100.200
ORIG. DWG. SIZE : SCALE : CAD FILE : CLASS: REV.
ELEVATION AT GRID A AND B ELEVATION AT GRID 1 AND 2 A1 1:50 RLP-1600-SDT-45510.dwg -

COMPANY DWG. NO.: CONTRACTOR/CONSULTANT DWG. NO.:


RLP-1600-SDT-45510 - A03
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like