Professional Documents
Culture Documents
RLP-1600-SDT-45522_A03 (PIPE BRIDGE 8)
RLP-1600-SDT-45522_A03 (PIPE BRIDGE 8)
Document No.
1 RLP-1600-SDT-45501 Revision No A02
RLP-1600-SDT-45503
RLP-1600-SDT-45522
RLP-1600-SDT-45524
Review
Approval
Code 02
Title FOUNDATION AND
FRAMING PLAN
Item DEL
DEL Comment Vendor Resolution Remarks
No Response
Piping GA reference to made Noted and added in the
in reference document. reference drawings.
Separate demolition drawing
to be issued, demolition
1 reference to be made in
document if any (typical
comment)
General comment:
1. The calculation note shall 1. Noted. Updated calculation
be submitted and the same
note revision A02 is submitted
along with this drawing
shall be reverified with the
revision.
outputs of the ongoing
2
geotechnical investigation
2. Piping GA references to 2. Noted. Please refer to item
be added - earlier comment no.1
not incorporated
1
Code: 1 – Approved without comments; proceed to next issue purpose (if applicable)
2 – Approved with comments; proceed to next issue purpose after incorporating comments
3 – Rejected; re-submit for same issue purpose after incorporating comments
4 – Information
5 – Reviewed without comments; proceed to next issue purpose (if applicable)
6 – Reviewed with comments; proceed to next issue purpose after incorporating comments
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)
Item DEL
DEL Comment Vendor Resolution Remarks
No Response
Comments on specific Please refer to Pipe Bridge-1
drawings: submission
RLP-1600-SDT-45501
1. The pipe bridge elevation
shall be updated as EL
+108.300 instead of El
+106.800 (typo error) in
elevation A&B to match with
3
elevation 1& 2
2. The top cord member of
the pipe bridge @EL
+110.800 TOS shall be
changed as UB356x40 as
per the STAAD analysis
calculation
RLP-1600-SDT-45524
1. At Grid A - the existing 1. Noted. Retaining wall to be
retaining wall shall be
demolished and reinstated.
considered as demolition and
6
reinstatement
2. The calculation note shall 2. Noted. Updated calculation
be submitted and the same note revision A02 is submitted
shall be reverified with the
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)
Item DEL
DEL Comment Vendor Resolution Remarks
No Response
outputs of the ongoing along with this drawing
geotechnical investigation revision.
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BILL OF MATERIALS
A B C D E
DESCRIPTION QUANTITY
MAIN STEEL (ton) 60.200
11900 19000 10000 9000
LADDER (ton) 0.340
2975 2975 2975 2975 12000 7000 2500 2500 2500 2500 2250 2250 2250 2250
HANDRAIL (ton) 0.575
A 2375 2375 2375 2375 2375 125 2250 2375 2375 A
GRATING (m²) 3.060
PE: 584.100 STAIR THREAD (ton) -
(NOTE 7)
SPLICE
PN: 1441.680 WP
(TYP) ANCHOR BOLTS (nos.) 40-B36
UC254x73/EM UC305x97/EM UC254x73/EM UC254x73/EM
2 (THIS MTO PROVIDED FOR INFORMATION ONLY.
CONTRACTOR SHALL ESTIMATE THE MTO AS PER GIVEN DETAILS.)
NOTES
2150
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SL
UB254x31/SL
UB254x31/SL
UB254x31/SL
UB254x31/SL
1. ALL DIMENSIONS ARE IN MILLIMETERS. ELEVATIONS & COORDINATES ARE IN
4300
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
2. ALL COORDINATES REFER TO PLANT GRID AND METERS.
PLANT RN. 0.00 = QNG N. 458867.09
2150
℄LADDER
350 2375 2375 2375 2375 2375 125 2250 2375 2375 200
9. THIS DRAWING SHOWS INDICATIVE PRELIMINARY INFORMATION. ALL FINAL
HANDRAIL
100
UB254x25/SS REQUIREMENTS SHALL BE FINALIZED DURING DETAILED ENGINEERING PHASE.
(NOTE 7)
SPLICE
C 10. NEW STEEL COLUMN SHALL BE CONNECTED TO THE NEAREST AVAILABLE C
WP UB254x25/SR EARTH GRID AS PER TYPICAL INSTALLATION DETAILS, DOC NO. RL0-0000-ESD-01070.
1200
(*1) UC305x118/EM (TYP) UC305x118/EM UC305x118/EM UC305x118/EM EPC CONTRACTOR TO DEVELOP EARTHING LAYOUT DURING EPC STAGE BY ELECTRICAL.
450
2 UB254x25/EM 11. FOR STANDARD DRAWING FOR GRATING FLOOR, REFER TO STANDARD
DWG NO. DOL-0000-SST-10190.
30mm THK GRATING
2150
UC305x118/SR
UC356x129/SR
UC305x118/SR
UC305x118/SR
UC305x118/SR
DWG NO. DOL-0000-SST-10187, DOL-0000-SST-10188 & DOL-0000-SST-10189.
A03
4300
(*2)
UB254x31/SR
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
UB254x31/SS
DWG NO. DOL-0000-SST-10184, DOL-0000-SST-10185 & DOL-0000-SST-10186.
)
(*3
2 1
2150
A03 LEGEND
1 (*1) UC305x118/EM UC305x118/EM UC305x118/EM UC305x118/EM
4300
200 350 200 200 350 350 200 200 200 200 200 200 350 350 200 200 350 350 200 200 350 2150 2150 TOS : TOP OF STEEL
L100/LT (-100mm TOS)
(TYP) BOS : BOTTOM OF STEEL
D UC : UNIVERSAL COLUMN D
FRAMING PLAN AT EL+108.200 TOS UB : UNIVERSAL BEAM
120
(*1) UB254x31/EM EL+104.500 TOS WP : WORKING POINT
TOS EL+110.700 UB254x31/SL
(*2) UB254x31/SS EL+104.500 TOS
(*3) CT146/LT EL+104.400 TOS
1300 Ø10" PIPE Ø44" PIPE
2500
HANDRAIL 1200
A03 UB254x25/SR
TOS EL+108.200 UC305x118/SR
1200
L1
ISSUED FOR APPROVAL
00/
2700
CT
Y
LT
/H
1
8
78
200
17
/H
CT
FOR GRID E ONLY
Y
UB254x31/SL REFERENCE DRAWINGS
TOS EL+105.500
DRAWING NUMBER TITLE
E E
RLP-1600-SDT-45524 FOUNDATION PLAN AND SECTION - PIPE BRIDGE 8
CT
Y
A03
8/H
RLP-1600-SCA-45508 CALCULATION NOTE FOR PIPE BRIDGE-08
17
2700
8/H
17
RLP-0000-LGA-45501 PIPING GA KEY PLAN FOR ABOVE GROUND TCW PIPING NETWORK INSTALLATION IN STREAM-1 AND STREAM-2 PROJECT
CT
Y
200
WP
(TYP)
TOS EL+102.800 UB254x31/SL
UC356x202/BP
UC356x202/BP
A03
CT
HY 17
2600
8/ 8/
350
7 H
CT1 Y
BOS EL+100.200
A B C D E
3000 11900 19000 10000 9000
2975 2975 2975 2975 2375 2375 2375 2375 2375 125 2250 2375 2375 2500 2500 2500 2500 2250 2250 2250 2250
350 350 350 350 350 350 350 350
SPLICE (NOTE 7)
THIS DRAWING
120
UC254x73/EM
WP
(TYP) UC305x97/EM UC305x97/EM UC254x73/EM UC254x73/EM TOS EL+110.700
KEY PLAN
Ø44" PIPE
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT146/LT
CT CT
2500
1 T
14 /LT
CT
6/L
T
CT
CT1
T
46
CT
LT
CT
CT
CT
CT
/LT
T
6/L
6/L
6/L
6/L
6/L
6/L
6/L
6
14
14
/LT
6/
14
14
14
14
14
14
14
46
46/
14
T
14
6/L
14
4
6/L
14
14
14
CT
6/
CT
6/L
6/L
6/L
6/L
CT1
1
G G
CT
CT
CT
LT
CT
CT
CT
CT
LT
T
T
T
UB254x25/EM TOS EL+108.200
A03 15JAN'22 ISSUED FOR APPROVAL M.Y R.M F.M
UC305x118/EM UC305x118/EM UC305x118/EM UC305x118/EM UC305x118/EM
FOR GRID A02 20DEC'22 ISSUED FOR APPROVAL M.Y R.M F.M
2700
2 ONLY
CT
CT
CT
LT
LT
LT
1/
1/
17
17
17
17
17
17
1 1 1
1/
1/
1/
CT
CT
CT
DEL
LT
LT
LT
2700
CHIYODA
ONSHORE FACILITIES GROUP
CT
14 DOLPHIN FMP-0000-3014 - FEED STUDY TCW LONG TERM
6/ TOS EL+102.800 ENERGY
LT SOLUTION PHASE-1
1 QC-TSU-086/DELT-21051
1
UC356x202/BP
UC356x202/BP
UC356x202/BP
UC356x202/BP
UC356x202/BP
2600
H FRAMING PLAN, ELEVATION, SECTION H
AND CONNECTION DETAILS
BOS EL+100.200 PIPE BRIDGE - 8
ORIG. DWG. SIZE : A1 SCALE : 1:100 (UNO) CAD FILE : RLP-1600-SDT-45522.dwg CLASS: - REV.
ELEVATION AT GRID 1 AND 2 COMPANY DWG. NO.: CONTRACTOR/CONSULTANT DWG. NO.:
RLP-1600-SDT-45522 - A03
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16