Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Dolphin Energy Management System

Doc. No.: DEMS-UB-TS-DRM-FM-047


External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)

Document No.
1 RLP-1600-SDT-45501 Revision No A02
RLP-1600-SDT-45503
RLP-1600-SDT-45522
RLP-1600-SDT-45524
Review
Approval
Code 02
Title FOUNDATION AND
FRAMING PLAN

Approver SARAVANAN Date of Issue 29/Dec2022


LAKSHMANAN

Contractor/Vendor CHY-QC-TSU-086-TR- DEL Transmittal DEL-QC-TSU-086-TR-0184


Transmittal 00168 Reference
Reference

Item DEL
DEL Comment Vendor Resolution Remarks
No Response
Piping GA reference to made Noted and added in the
in reference document. reference drawings.
Separate demolition drawing
to be issued, demolition
1 reference to be made in
document if any (typical
comment)

General comment:
1. The calculation note shall 1. Noted. Updated calculation
be submitted and the same
note revision A02 is submitted
along with this drawing
shall be reverified with the
revision.
outputs of the ongoing
2
geotechnical investigation
2. Piping GA references to 2. Noted. Please refer to item
be added - earlier comment no.1
not incorporated

1
Code: 1 – Approved without comments; proceed to next issue purpose (if applicable)
2 – Approved with comments; proceed to next issue purpose after incorporating comments
3 – Rejected; re-submit for same issue purpose after incorporating comments
4 – Information
5 – Reviewed without comments; proceed to next issue purpose (if applicable)
6 – Reviewed with comments; proceed to next issue purpose after incorporating comments
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)

Item DEL
DEL Comment Vendor Resolution Remarks
No Response
Comments on specific Please refer to Pipe Bridge-1
drawings: submission
RLP-1600-SDT-45501
1. The pipe bridge elevation
shall be updated as EL
+108.300 instead of El
+106.800 (typo error) in
elevation A&B to match with
3
elevation 1& 2
2. The top cord member of
the pipe bridge @EL
+110.800 TOS shall be
changed as UB356x40 as
per the STAAD analysis
calculation

RLP-1600-SDT-45503 Please refer to Pipe Bridge-1


1. Comment on title block: submission
The drg number shall be
mentioned in COMPANY
Dwg no. and shall match with
4
other drawings
2. UG drawing for the
specific area shall be
included

RLP-1600-SDT-45522 Noted and corrected the


1. The platform elevation platform location in elevation
shall be corrected and
view.
5 moved to EL+108.200 to
match the calculation and
3D-model

RLP-1600-SDT-45524
1. At Grid A - the existing 1. Noted. Retaining wall to be
retaining wall shall be
demolished and reinstated.
considered as demolition and
6
reinstatement
2. The calculation note shall 2. Noted. Updated calculation
be submitted and the same note revision A02 is submitted
shall be reverified with the
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)

Item DEL
DEL Comment Vendor Resolution Remarks
No Response
outputs of the ongoing along with this drawing
geotechnical investigation revision.

Refer to comments and


incorporate.

© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

BILL OF MATERIALS
A B C D E
DESCRIPTION QUANTITY
MAIN STEEL (ton) 60.200
11900 19000 10000 9000
LADDER (ton) 0.340
2975 2975 2975 2975 12000 7000 2500 2500 2500 2500 2250 2250 2250 2250
HANDRAIL (ton) 0.575
A 2375 2375 2375 2375 2375 125 2250 2375 2375 A
GRATING (m²) 3.060
PE: 584.100 STAIR THREAD (ton) -

(NOTE 7)
SPLICE
PN: 1441.680 WP
(TYP) ANCHOR BOLTS (nos.) 40-B36
UC254x73/EM UC305x97/EM UC254x73/EM UC254x73/EM
2 (THIS MTO PROVIDED FOR INFORMATION ONLY.
CONTRACTOR SHALL ESTIMATE THE MTO AS PER GIVEN DETAILS.)
NOTES
2150

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS
UB254x31/SL

UB254x31/SL

UB254x31/SL

UB254x31/SL

UB254x31/SL
1. ALL DIMENSIONS ARE IN MILLIMETERS. ELEVATIONS & COORDINATES ARE IN
4300

METERS, UNLESS NOTED OTHERWISE.


UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS
2. ALL COORDINATES REFER TO PLANT GRID AND METERS.
PLANT RN. 0.00 = QNG N. 458867.09
2150

PLANT RE. 0.00 = QNG E. 231371.27

PLANT NORTH IS 27°57'12" EAST FROM THE TRUE NORTH


1 UC254x73/EM UC305x97/EM UC254x73/EM UC254x73/EM 3. FINISHED GRADE ELEVATIONS:
B 350 200 200 350 350 200 200 200 200 200 200 350 200 200 350 350 200 350 BASE LEVEL= +1900, B
L100/LT (-100mm TOS)
(TYP) QNHD=HIGH POINT OF PAVING (HPP) = EL+100.000 M.
4. FOR GENERAL NOTES OF STEEL STRUCTURE WORKS, REFER TO STANDARD
FRAMING PLAN AT EL+110.700 TOS DWG NO. DOL-0000-SST-10001.
5. FOR STANDARD DRAWING MEMBER LIST, REFER TO STANDARD
DWG NO. DOL-0000-SST-10002.
A B C D E 6. FOR STANDARD CONNECTION DETAILS, REFER TO STANDARD
DWG NOS. DOL-0000-SST-10101, DOL-0000-SST-10105,
DOL-0000-SST-10107, DOL-0000-SST-10112, DOL-0000-SST-10121, A03
DOL-0000-SST-10125, DOL-0000-SST-10131 & DOL-0000-SST-10132.
3000 11900 19000 10000 9000 1000 7. FOR SPLICE CONNECTION DETAIL, REFER TO STANDARD
2975 2975 2975 2975 12000 7000 2500 2500 2500 2500 2250 2250 2250 2250 600 DWG NO. DOL-0000-SST-10136.
8. FOR ELECRTICAL CONTINUITY REFER TO DWG. NO . DOL-0000-SST-00004.

℄LADDER
350 2375 2375 2375 2375 2375 125 2250 2375 2375 200
9. THIS DRAWING SHOWS INDICATIVE PRELIMINARY INFORMATION. ALL FINAL
HANDRAIL

100
UB254x25/SS REQUIREMENTS SHALL BE FINALIZED DURING DETAILED ENGINEERING PHASE.

(NOTE 7)
SPLICE
C 10. NEW STEEL COLUMN SHALL BE CONNECTED TO THE NEAREST AVAILABLE C
WP UB254x25/SR EARTH GRID AS PER TYPICAL INSTALLATION DETAILS, DOC NO. RL0-0000-ESD-01070.

1200
(*1) UC305x118/EM (TYP) UC305x118/EM UC305x118/EM UC305x118/EM EPC CONTRACTOR TO DEVELOP EARTHING LAYOUT DURING EPC STAGE BY ELECTRICAL.

450
2 UB254x25/EM 11. FOR STANDARD DRAWING FOR GRATING FLOOR, REFER TO STANDARD
DWG NO. DOL-0000-SST-10190.
30mm THK GRATING
2150

12. FOR STANDARD DRAWING FOR HANDRAIL, REFER TO STANDARD


UC305x118/SR

UC305x118/SR

UC356x129/SR

UC305x118/SR

UC305x118/SR

UC305x118/SR
DWG NO. DOL-0000-SST-10187, DOL-0000-SST-10188 & DOL-0000-SST-10189.
A03
4300

(*2)

13. FOR STANDARD DRAWING FOR LADDER, REFER TO STANDARD

UB254x31/SR
UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS

UB254x31/SS
DWG NO. DOL-0000-SST-10184, DOL-0000-SST-10185 & DOL-0000-SST-10186.
)
(*3

2 1
2150

A03 LEGEND
1 (*1) UC305x118/EM UC305x118/EM UC305x118/EM UC305x118/EM
4300
200 350 200 200 350 350 200 200 200 200 200 200 350 350 200 200 350 350 200 200 350 2150 2150 TOS : TOP OF STEEL
L100/LT (-100mm TOS)
(TYP) BOS : BOTTOM OF STEEL
D UC : UNIVERSAL COLUMN D
FRAMING PLAN AT EL+108.200 TOS UB : UNIVERSAL BEAM

120
(*1) UB254x31/EM EL+104.500 TOS WP : WORKING POINT
TOS EL+110.700 UB254x31/SL
(*2) UB254x31/SS EL+104.500 TOS
(*3) CT146/LT EL+104.400 TOS
1300 Ø10" PIPE Ø44" PIPE

2500
HANDRAIL 1200
A03 UB254x25/SR
TOS EL+108.200 UC305x118/SR

1200
L1
ISSUED FOR APPROVAL

00/
2700

CT
Y
LT

/H

1
8

78
200

17

/H
CT
FOR GRID E ONLY

Y
UB254x31/SL REFERENCE DRAWINGS
TOS EL+105.500
DRAWING NUMBER TITLE
E E
RLP-1600-SDT-45524 FOUNDATION PLAN AND SECTION - PIPE BRIDGE 8

CT
Y
A03

8/H
RLP-1600-SCA-45508 CALCULATION NOTE FOR PIPE BRIDGE-08

17
2700

8/H
17
RLP-0000-LGA-45501 PIPING GA KEY PLAN FOR ABOVE GROUND TCW PIPING NETWORK INSTALLATION IN STREAM-1 AND STREAM-2 PROJECT

CT

Y
200
WP
(TYP)
TOS EL+102.800 UB254x31/SL

UC356x202/BP

UC356x202/BP
A03
CT
HY 17

2600
8/ 8/

350
7 H
CT1 Y
BOS EL+100.200

ELEVATION AT GRID A TO GRID E


F F

A B C D E
3000 11900 19000 10000 9000
2975 2975 2975 2975 2375 2375 2375 2375 2375 125 2250 2375 2375 2500 2500 2500 2500 2250 2250 2250 2250
350 350 350 350 350 350 350 350
SPLICE (NOTE 7)

THIS DRAWING

120
UC254x73/EM
WP
(TYP) UC305x97/EM UC305x97/EM UC254x73/EM UC254x73/EM TOS EL+110.700
KEY PLAN
Ø44" PIPE
CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT

CT146/LT
CT CT

2500
1 T
14 /LT
CT

6/L
T
CT

CT1

T
46
CT

LT

CT
CT

CT

CT

/LT
T

6/L
6/L

6/L
6/L
6/L

6/L

6/L

6
14
14

/LT
6/

14
14

14
14

14

14

14

46
46/
14

T
14

6/L

14

4
6/L

14

14

14

CT
6/

CT
6/L

6/L

6/L

6/L

CT1
1
G G
CT
CT

CT
LT
CT

CT

CT

CT
LT
T
T

T
UB254x25/EM TOS EL+108.200
A03 15JAN'22 ISSUED FOR APPROVAL M.Y R.M F.M
UC305x118/EM UC305x118/EM UC305x118/EM UC305x118/EM UC305x118/EM
FOR GRID A02 20DEC'22 ISSUED FOR APPROVAL M.Y R.M F.M

2700
2 ONLY
CT

CT

CT
LT

LT

LT

R01 25OCT'22 ISSUED FOR REVIEW M.Y R.M F.M


1/

1/

1/
17

17
17
17

17

17

1 1 1
1/

1/
1/
CT

CT

CT

DEL
LT

LT
LT

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED APPROVAL


1 1 1
TOS EL+105.500 This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted
in any form or by any means, or used for any purpose other than that which it is specifically furnished
1000

without the written consent of Dolphin Energy Ltd.

UB254x31/EM TOS EL+104.500


DOLPHIN ENERGY LIMITED

2700
CHIYODA
ONSHORE FACILITIES GROUP
CT
14 DOLPHIN FMP-0000-3014 - FEED STUDY TCW LONG TERM
6/ TOS EL+102.800 ENERGY
LT SOLUTION PHASE-1
1 QC-TSU-086/DELT-21051
1
UC356x202/BP

UC356x202/BP

UC356x202/BP

UC356x202/BP

UC356x202/BP

2600
H FRAMING PLAN, ELEVATION, SECTION H
AND CONNECTION DETAILS
BOS EL+100.200 PIPE BRIDGE - 8

ORIG. DWG. SIZE : A1 SCALE : 1:100 (UNO) CAD FILE : RLP-1600-SDT-45522.dwg CLASS: - REV.
ELEVATION AT GRID 1 AND 2 COMPANY DWG. NO.: CONTRACTOR/CONSULTANT DWG. NO.:
RLP-1600-SDT-45522 - A03
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like