RLP-1600-SDT-45528_A04 (PIPE BRIDGE 10)
RLP-1600-SDT-45528_A04 (PIPE BRIDGE 10)
RLP-1600-SDT-45528_A04 (PIPE BRIDGE 10)
Document No.
1 RLP-1600-SDT-45528 Revision No A03
RLP-1600-SDT-45530 A03
RLP-1600-SDT-45501 A03
RLP-1600-SDT-45503 A03
RLP-1600-SDT-45510 A03
RLP-1600-SDT-45512 A03
RLP-1600-SDT-45552 A03
RLP-1600-SDT-45551 A03
RLP-1600-SDT-45550 A03
RLP-1600-SDT-45549 A03
1
Code: 1 – Approved without comments; proceed to next issue purpose (if applicable)
2 – Approved with comments; proceed to next issue purpose after incorporating comments
3 – Rejected; re-submit for same issue purpose after incorporating comments
4 – Information
5 – Reviewed without comments; proceed to next issue purpose (if applicable)
6 – Reviewed with comments; proceed to next issue purpose after incorporating comments
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
Dolphin Energy Management System
Doc. No.: DEMS-UB-TS-DRM-FM-047
External Comment Resolution
Rev.: 0, 29-April-2021
Sheet (CRS)
RLP-1600-SDT-45530: No comments
RLP-1600-SDT-45549: No comments
RLP-1600-SDT-45550: No comments
RLP-1600-SDT-45551: No comments
RLP-1600-SDT-45552: No comments
© Dolphin Energy. This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BILL OF MATERIALS
A B DESCRIPTION
MAIN STEEL (ton)
QUANTITY
23.340
15100 LADDER (ton) 0.320
HANDRAIL (ton) 0.370
A 3100 12000 A
GRATING (m²) 3.120
2500 2500 2550 2550 2500 2500 STAIR THREAD (ton) -
ANCHOR BOLTS (nos.) 16-B36
(NOTE 7)
SPLICE
350 200 200 200 200 350 (THIS MTO PROVIDED FOR INFORMATION ONLY.
CONTRACTOR SHALL ESTIMATE THE MTO AS PER GIVEN DETAILS.)
UB356x51/EM UB356x51/EM NOTES
2 1. ALL DIMENSIONS ARE IN MILLIMETERS. ELEVATIONS & COORDINATES ARE IN
S) METERS, UNLESS NOTED OTHERWISE.
L10 ) L10 m TO L10
OS 0 0m 0/L S) 2. ALL COORDINATES REFER TO PLANT GRID AND METERS.
0/L mT /LT 0 T (- TO
1750
1
T(
-10 00m (-1 T (- 100 mm
PLANT RN. 0.00 = QNG N. 458867.09
0m T (-
1 00m 0/L mm 00 PLANT RE. 0.00 = QNG E. 231371.27
m 0 /L mT L10 TO T (-1
TO L10 OS S) 0/L
UB254x25/SS
UB254x25/SS
UB254x25/SS
)
UB254x25/SS
S) L10 PLANT NORTH IS 27°57'12" EAST FROM THE TRUE NORTH
3500
UB254x25/SS
UB254x25/SS
UB254x25/SS
mm (-1 T (- 10 m 4. FOR GENERAL NOTES OF STEEL STRUCTURE WORKS, REFER TO STANDARD
T (-
1750
T
00/L T OS 0 /LT 100
0/L
TO
S) DWG NO. DOL-0000-SST-10001.
L 1 ) L10 m mT L10
OS 5. FOR STANDARD DRAWING MEMBER LIST, REFER TO STANDARD
) DWG NO. DOL-0000-SST-10002.
1 UB356x51/EM UB356x51/EM
6. FOR STANDARD CONNECTION DETAILS, REFER TO STANDARD
DWG NOS. DOL-0000-SST-10101, DOL-0000-SST-10105,
DOL-0000-SST-10107, DOL-0000-SST-10112, DOL-0000-SST-10121,
PE: 584.000 DOL-0000-SST-10125, DOL-0000-SST-10131 & DOL-0000-SST-10132.
PN: 1610.965 FRAMING PLAN AT EL+108.800 TOS 7. FOR SPLICE CONNECTION DETAIL, REFER TO STANDARD
DWG NO. DOL-0000-SST-10136.
8. FOR ELECRTICAL CONTINUITY REFER TO DWG. NO . DOL-0000-SST-00004.
B C 9. THIS DRAWING SHOWS INDICATIVE PRELIMINARY INFORMATION. ALL FINAL
REQUIREMENTS SHALL BE FINALIZED DURING DETAILED ENGINEERING PHASE.
C
15100 C
10. STEEL COLUMN SHALL BE CONNECTED TO THE NEAREST AVAILABLE EARTH GRID.
EPC CONTRACTOR TO COORDINATE WITH ELECTRICAL DISCIPLINE FOR THE DETAILS.
600 3100 12000
11. FOR STANDARD DRAWING FOR GRATING FLOOR, REFER TO STANDARD
DWG NO. DOL-0000-SST-10190.
2500 2500 2550 2550 2500 2500 12. FOR STANDARD DRAWING FOR HANDRAIL, REFER TO STANDARD
DWG NO. DOL-0000-SST-10187, DOL-0000-SST-10188 & DOL-0000-SST-10189.
(NOTE 7)
SPLICE
350 200 200 A04 200 200 350 13. FOR STANDARD DRAWING FOR LADDER, REFER TO STANDARD
DWG NO. DOL-0000-SST-10184, DOL-0000-SST-10185 & DOL-0000-SST-10186.
UB406x67/EM
2 LEGEND
S)
L10 ) L10 m TO L10
OS 0 00m 0/L S)
0/L mT /LT T (- TO
1750
UC254x73/DS
UB254x25/SS
UB254x25/SS
S) L 1 0
D D
UB : UNIVERSAL BEAM
3500
0m
UB254x25/SS
UB254x25/SS
-10 100
℄ LADDER
( -1 T (-
mm ( (- m
1750
T T
0 0/L T OS 0/L 100 /LT TO
S)
L1 ) L10 m mT L100
OS
)
UB254x25/EM
1 L10
450
UB406x67/EM
UB254x25/SR
0/L
UB254x25/SR
T (-
100
1200
mm
TOS
)
A04
FRAMING PLAN AT EL+106.300 TOS ISSUED FOR APPROVAL
100
REFERENCE DRAWINGS
UB254x25/SS 200 HANDRAIL
E
30mm THK GRATING DRAWING NUMBER TITLE
E
RLP-1600-SDT-45530 FOUNDATION PLAN AND SECTION PIPE BRIDGE - 10
RLP-1600-SCA-45510 CALCULATION NOTE FOR PIPE BRIDGE - 10
A B 1 2 RLP-0000-LGA-45501 PIPING GA KEY PLAN FOR ABOVE GROUND TCW PIPING NETWORK INSTALLATION IN STREAM-1 AND STREAM-2 PROJECT
15100 3500
350 350
120
120
TOS EL+108.800 UB356x51/EM UB356x51/EM TOS EL+108.800 UB254x25/SS
F 1935 1565 F
2500
L100/LT
L100/LT
L100/LT
L100/LT
L100/LT
L10
T
L1
/LT
L1
/LT
0/L
HANDRAIL
00
00
1200
0/L
00
00
L10
/
/LT
LT
L1
L1
T
KEY PLAN
UB406x67/EM UB406x67/EM
1200
L1
00
/LT
CT1
LT
78/
78/
CT1
3050
3050
LT
G f. G
A04 19JAN'23 ISSUED FOR APPROVAL D.D R.M F.M
200
This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted
in any form or by any means, or used for any purpose other than that which it is specifically furnished
without the written consent of Dolphin Energy Ltd.
UC356x202/BP
UC356x202/BP
CT1
LT
78/
78/
DOLPHIN FMP-0000-3014 - FEED STUDY TCW LONG TERM
CT1
ENERGY
LT
3050
3050
UC356x202/BP
UC356x202/BP