Flowing Gradient Survey (FGS)

String:

 ENY MAIN – 6
 Reservoir: III F

Objective:

 To make a well model with VLP and IPR


 Please note that this FGS’s should be carried out with Separator Testing.

Procedure:

 Divert the well into the Well Test separator.


 Stand by for stabilization (Kindly perform FGS only when well get stabilized after connecting well test
separator).
 RIH with EMG.
 Go to bottom most survey depth.
 Park the EMG at the planned survey depths for planned time periods.
 POOH.

Survey Depths:

ENYIE 6_III-F
FGS
Depth MDRKB Duration
(m) (minutes)
2820 60
2780 15
2740 15
2700 15
2300 15
1900 15
1500 15
1100 15
700 15
300 15
6.76 15
DFE 6.76m (Ref: GL)
GLE 14.77m (Ref: MSL)