Professional Documents
Culture Documents
Solinas Integrity Pvt
Solinas Integrity Pvt
We thank you for the given inquiry for inspection of the Water supply pipeline network of CMWSSB,
Area-04_Depo-39 through robotic solutions of Solinas Integrity Private Limited, Chennai. We take great
pleasure in submitting our offer for the same. The proposal is for a pilot partnership of a minimum of 15
days which will allow us to understand the challenges and improve our offering as well. Later we can
grow this partnership as per mutual benefits.
We are highlighting some key benefits to the CMWSSB, Area-04_Depo-39 along with the availability
to inspect a pipeline any time there is a need and pinpoint the leak or fault point. This will help
CMWSSB, Area-04_Depo-39 to save money, time and manpower required for maintenance of pipelines
and provide critical data points required for the same.
1. Immediate action on contamination complaints: Using our robot, we can immediately act on
contamination complaints. At the same time, we can do regular inspections in high contamination-prone
areas that will allow us to improve the service and reduce shut-downs.
2. Reduction in the water leakage through early detection of leaks.
3. Reduction in the amount of labour required to manage breakdowns, digging, etc.
4. Condition Assessment of the pipelines laid down by the CMWSSB, Area-04_Depo-39 .
5. GIS mapping of the pipelines as per the need.
6. Integration of the database: Pipeline data & defects data collected from the inspection from the
Swasth dashboard
7. Integrating Report generation: Integration of the data related to downloadable inspection report
from the Swasth dashboard
Note: A month of inspection would tentatively cover ~4-5 KMs of the pipeline, subject to availability of pits and
other facilities
1. Delivery Period: Services will start within 1 month from the release of the work order.
2. Payment Terms: Monthly, with charges of 1st month to be paid in advance.
3. The proposal and this quotation are confidential between Solinas & CMWSSB, Area-04_Depo-
39 . If the quotation is shared with any other third party, then it may stand null and void.
4. Quote is valid to be accepted only till 10th April2023 & is non-binding in nature.
5. Client will be solely responsible for the preparation of access points for robot insertion (i.e.,
excavation of the pipelines)
Thanking you
Sincerely,
GokulVasanth Senthamil,
Senior Business Development Manager,
Solinas Integrity
Mobile: +91 9791589275
Email: vasanthsenthamil@solinas.in
ANNEXURE I
1. Introduction
MJP-Amravati, among several intervention areas, expressed that they would require services inspection
and rectification of ingress and egress of water in their pipeline network along with identification of
defects points in their pipeline network. SOLINAS INTEGRITY PVT. LTD suggested that the
robotic solutions of Solinas Integrity Private Limited, an IIT Madras incubated product would be
available for conducting an inspection of the water pipeline network.
Prospective analysis of the pipelines which are laid down by CMWSSB, Area-04_Depo-39 has evinced
keen interest in conducting a rapid inspection of the water line network using Solinas Integrity Private
Limited. This inspection is expected to check the condition of the water supply pipeline systems.
As a part of the project, Solinas Integrity Private Limited would-be performing condition assessment of
Water supply lines of various sizes to detect critical defects and identify their locations, for
corresponding corrective actions to be taken at specified sections of the pipeline with minimal digging
of the roads.
2. Scope of work
Solinas will have one of the units of Endobot stationed in the city, along with two of our operations
engineers. CMWSSB, Area-04_Depo-39 will also have the option to use any other product from the
Endobot portfolio as per the need of the inspection. Solinas will also have an Operations Lead sending a
detailed report about the progress of the CMWSSB, Area-04_Depo-39 team on a monthly basis.
Objectives:
The inspection will provide the following benefits to the CMWSSB, Area-04_Depo-39 along with the
availability to inspect a pipeline any time there is a need and pinpoint the leak or fault or
contamination point. This will save a lot of digging time, effort, and cost for the operations team.
1. Immediate action on contamination complaints: Using our robot, we can immediately act on
contamination complaints. At the same time, we can do regular inspections in high contamination prone
areas that will allow us to improve the service and reduce shut-downs.
5. Data related to pipeline details which include pipeline diameter, Location, GIS coordinates, age, and
material should be included in the integration process.
6. Defect data included in the integration process include defect image and GIS location
7. The dashboard should be able to plan the inspections update the current status of various defects
8. The dashboard should also have the provision to download inspection reports of a set of inspections in
one go
Deliverables:
- Availability of an inspection robot in the city from starting of the date of the project and two full-
time dedicated manpower for operation and reporting
- Inspection of pipelines for leak/crack detection, contamination, sewage, or corrosion for any
pipeline above 90 mm
- Live video feed for visual inspection using the high-resolution camera
- Detection and localization of internal features/defects such as –
● Updated diameter, if different from GIS (once the data is shared)
● cracks, fractures, or holes
● contamination zones
● leakage, seepage, or corroded areas
● internal coating damages or wall loss or deformation, if laser profiling is possible
● separated or open pipe joints
● foreign bodies or blockages
- Monthly report of all inspections as per the format discussed.
Note: The responsibility for providing the access point for entry as well as pipeline rehabilitation lies
with the CMWSSB, Area-04_Depo-39
Tool: Solinas Endobot systems (SES) of Solinas Integrity Private Limited is an entire unit that mainly
consists of a remotely-operated robotic vehicle that carries multiple sensors over-board to perform
endoscopy of pipelines, i.e., for internal condition assessment and to identify various kinds of defects. It
consists of the crawler, a camera, a winch, a DVR, and the laser profiling system.
II. An inspection shall be performed once in every line and the client shall be shown the live video
of the same in real-time while performing the inspection. It is the client's responsibility to satisfy
themselves and check the condition of the pipe as per their requirement at that time.
5. Completeness of Work
I. All pipeline inspections shall be executed in the presence of the client's appointed Project- in
charge/Engineer-in-Charge/Representative who shall be viewing the inspection in real time.
They shall have the right to direct Solinas’ operator to show them the condition of the pipeline
to their satisfaction. Once satisfied they have to sign the Site Survey Sheet (SSS) provided by
Solinas, as a record of the completed work. This shall be deemed as the successful completion
of the inline inspection and/or conditional assessment of that section of the pipeline.
II. The inspection system shall be introduced into the pipe section from one side and if the
inspection system cannot move forward due to bend, deformity, obstacle, et cetera, it shall be
taken out and introduced into the pipe from the other end. The inspection system shall then be
moved towards the other end as far as possible without endangering the inspection system. It is
the client's choice to allow the inspection from the other side. In either case, the inspection of
that pipe section shall be considered complete.
6. SOLINAS Responsibility
I. SOLINAS will appoint a "Business Relationship Manager" to oversee the works executed by
Solinas and its subcontractors. It is the responsibility of the Business Relationship Manager to
ensure that the inspection work after desilting (if necessary) has been completed satisfactorily.
Solinas shall perform real-time inspection and conditional assessment of the water pipeline and
the same shall be viewed by the Business Relationship Manager in real-time on-site through the
control panel monitor. The line shall be thoroughly checked and the signature of the Business
Relationship Manager shall be required on the Site Survey Sheet (SSS). The work shall not
proceed to the next site until the signature is acquired on the Site Survey Sheet (SSS) from the
business relationship manager.
7. CMWSSB, Area-04_Depo-39 Responsibility
I. CMWSSB, Area-04_Depo-39 will arrange/ obtain permissions/ approvals/ NOCs for the
execution of work at the site as per local laws. Solinas shall not be responsible for claims of
losses arising out of a lack of such permissions/approvals/NOCs. All local issues shall be in
Client's Scope.
II. CMWSSB, Area-04_Depo-39 shall provide covered space with security free of cost for safe
keeping of the equipment within or near the project area.
III. CMWSSB, Area-04_Depo-39 shall provide a comprehensive list of selected locations along
with a total length of each type of pipe diameter that is to be inspected and an access point to the
pipeline must be provided every 100-150 meters.
IV. CMWSSB, Area-04_Depo-39 is required to perform the initial survey of the concerned project
site including all pre-inspection activities like a topographical survey of the project area
including identification of water pipelines to be inspected, any measurements using a total
station or other survey devices, confirmation of accessibility of the identified water pipelines and
any other asset mapping if required.
V. CMWSSB, Area-04_Depo-39 shall provide obstruction-free access to facilitate safe access for
the equipment into the water pipeline.
VI. 1-2 people should be provided as labour will vary as per the current condition of the inspection
site and the pipeline, which may include inspection site preparation and getting the entry point
for the robot, Getting the jet rodding done, and support in the handling of the bulky inspection
equipment during the inspection at site and moving from one site to another. CMWSSB, Area-
04_Depo-39 is also responsible for the safety of the Labour provided by them for this activity.
VII. CMWSSB, Area-04_Depo-39 is required to ensure that the water pipeline where the inspection
work has to be executed, is prepped properly in advance. Requisite excavation of the pipelines,
availability of the labour preparation at the pits, clearing of the blockages, and stoppage of flow
as required should be completed before the arrival of the inspection team.
VIII. Power supply in a single phase for the smooth running of the inspection equipment. Prior to the
inspection, a pipe layout may be provided.
8. Deliverables
Note: Since, the report is essentially an expert interpretation of the observations made through the
robotic inspection, CMWSSB, Area-04_Depo-39 approval of the report is not envisaged. The report
also contains the verbatim copy of the condition of the pipeline for post-mortem analysis. CMWSSB,
Area-04_Depo-39 is free to make its own deductions from the analysis of the same.
9. Timelines
I. Advance: 1st-month advance needs to be done along with the release final work order.
II. Execution time: Starting the work within 4-6 weeks of the work order. This projection is only for
planning purposes. This estimate is being given on a best-effort basis since the normal time of
completion is as per the timelines mutually agreed upon and hence cannot be held liable for any
penalty or deductions whatsoever.
III. Submission of report: A report of the completed works shall be submitted on a monthly basis
based on measurement.
11. Non-Disclosure
The agency shall not, except as authorized or required by the agency’s duties, here under reveal or
divulge to any person or entity any information concerning the survey, design, data, methodology,
drawing, and documents which shall come to the agency knowledge during the continuance of this
work order. The agency shall keep and maintain complete secrecy of all the confidential information
entrusted to the agency and shall not use or attempt to use any such information in any manner which
shall injure or cause loss either directly or indirectly to the client -CMWSSB, Area-04_Depo-39
interests. Similarly, the client shall also keep and maintain complete secrecy of survey methodology,
robotic equipment/technology details, pricing structure/quotation, and any such information in any
manner that might conflict with the service provider - Solinas’ interests.
ANNEXURE II
Solinas Integrity has performed operations in various cities of Tamil Nadu and Orissa.
Clients in water and urban infrastructure industries have approached Solinas Integrity for identifying
various types of problems hindering the day-to-day pipeline operations, that is thereby decreasing the
efficiency of operations and compromising the quality of water being supplied in the pipelines.
These three case studies are presented below demonstrating the on-field inspection works carried out,
the successful identification of certain causes of the issues, and the impact created after the inspection
performed in each of these cities.
Solinas Integrity’s team performed the inline visual inspection of the pipeline, identified severe
contamination, detected the leakage and its location, and submitted a detailed condition assessment
report to the client suggesting further actions to be taken by the client.
The residents of many colonies have been receiving sewage-contaminated water due to the presence of
leakages or no water at all due to the accumulation of blockages in the water pipelines. Fifteen most
affected areas have been shortlisted for repair and restoration.
Solinas Integrity has performed an inspection at these fifteen sites and found sewage contamination in
thirteen sites and blockages at several sites. The locations of these places have been marked above the
ground and a detailed report with all the findings is submitted for further maintenance actions. A few
pictures of the observations are shown below.
Solinas Integrity has performed the inspection on the suspected water line of over 300 m and identified
25+ leakages which are developed due to improper joining of house service connections. The locations
of these leaks are marked on the ground along the pipeline network. After the inspection is performed
the leakages are attended and the overall leakage is reduced by more than 70%. The repair work is
presently ongoing and the overall leakage is expected to reduce by 90% thus saving almost 7 Lakh
Litres per Day. A few pictures of the observations are shown below.