SOP for Berth 4 & 6
Supply and Injection of grout into the cavities below the cope
7 100
beam from top of capping beam as per Appendix A, Clause 3.3.1
Items mentioned in the BOQ are subject to re-measureable quantity and all other charges, if any, for a
2
inferred from the scope of work deemed to be included in the respective line item of BOQ
BERTH- 4 AND BERTH- 6 AT MIC PORT
NICAL SPECIFICATIONS ALONGWITH ATTACHMENTS (Enclosed)
Rate Amount
Unit
QAR QAR
l/s Quote Quote
l/s Quote Quote
l/s Quote Quote
m2 - -
Quote Quote
Quote Quote
Quote Quote
l/s - -
Quote Quote
Quote Quote
Quote Quote
m3 Quote Quote
m3 Quote Quote
m2 - -
Quote Quote
Quote Quote
Quote Quote
0
including but not limited to, all material, including consumables, equipment, necessary tools, manpower and
equired to complete the WORK as per Appendix A - Scope of Work and relevant attachments.
ty and all other charges, if any, for any services so that they are fit for the purposes set out or reasonably to be