Boq for Damaged Building

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 10

ITEM DESCRIPTION PAGE NO AMOUNT (UGX)

SUMMARY OF BILL

ELEMENT NO. 1 : SUPERSTRUCTURE 6,286,740

ELEMENT NO. 2 : ROOF STRUCTURE 1,269,320

ELEMENT NO. 3 : DOORS 2,268,800

ELEMENT NO 4 : FLOOR FINISHES 1,530,000

ELEMENT NO 5 : WALL FINISHES 6,767,400

ELEMENT NO 6 : CEILING FINISHES 6,233,240

ELEMENT NO 7 : ROOF FINISHES 7,215,000

LUMPSUM OF 1,000,000 FOR ELECTRICAL WORKS 1,000,000

SUB-TOTAL OF THE BILL 32,570,500

Contigency 5% 1,628,525

SUBTOTAL 2 34,199,025

VAT 18% 6,155,825

GRAND TOTAL 40,354,850


Item Description Unit Qty Rate (UGX) Amount (UGX)

ELEMENT NO 1 : SUPERSTRUCTURE

Hard burnt clay bricks to BS 3921 (3.5N/mm2


compressive strength) bedded and jointed in cement and
sand (1:3) mortar with hoop irons every alternate course

A 230mm Wall SM 94 40,000 3,755,200

Reinforced in-situ concrete class 25/20mm aggregate,


[mix 1:2:4]: in

B Ring beam CM 3 380,000 1,206,120

High yield tensile steel bar reinforcement to BS 4461 as


described including cutting to lengths, bending, hoisting
and fixing including all necessary tying wire and spacing
blocks.

C 12mm Diameter bars KG 178 5,000 888,000

Mild steel bar reinforcement to BS 4461

C 8mm Diameter bars KG 15 5,000 77,420

Sawn formwork: to

D Sides of the ring beam LM 120 3,000 360,000


TOTAL ELEMENT NO.1 SUPERSTRUCTURE CARRIED TO
BILL SUMMARY 6,286,740
Item Description Unit Qty Rate (UGX) Amount (UGX)
ELEMENT NO 2 : ROOF STRUCRURE

Structural timbers:

Pressure impregnated sawn soft wood structural timber


including all nailing, metal traps and connections in 4No.
A Truss: LM 124 5,000 620,000

B Ditto but for 100 x 75mm Wall plate LM 30 5,000 150,000

Roofing Material

C Binding wire Roll 1 82,320 82,320

D Roofing nails Kgs 10 8,000 80,000

E Rubber Washers Box 2 6,000 12,000

F Nails Kgs 65 5,000 325,000


TOTAL ELEMENT NO.2 (ROOF STRUCTURE) CARRIED
TO BILL SUMMARY 1,269,320

Item Description Unit Qty Rate (UGX) Amount (UGX)

ELEMENT NO 3 : DOORS

Purpose made steel door : Door framing and clad


faced/fabricated both sides with 2mm steel plates :
complete with hinges, frame and fixing lugs built into
wall.

50 x 150mm metallic door and frame : In opening of size


2000 x 2400mm high overall : comprising 300mm high steel
louvred vent for full width : door shutter size 2000 x
A 2100mm high NO 4 500,000 2,000,000

Painting

Prepare touch up primer and apply one undercoat and two


finishing coats of gloss oil paint to steel door surfaces.
B SM 34 8,000 268,800
TOTAL ELEMENT NO.3 (DOORS) CARRIED TO BILL
SUMMARY 2,268,800

Item Description Unit Qty Rate (UGX) Amount (UGX)

ELEMENT NO 4 : FLOOR FINISHES

Hack, remove and properly dispose of the existing damaged


A floor finish and ready the floor to receive new finish. Item 1 50,000 50,000

15mm Cement and sand plaster(1:4) steel trowelled hard


B and smooth as new floor finish. SM 105 12,000 1,260,000

C Ditto but to 100 x 25mm square top Skirting. LM 44 5,000 220,000


TOTAL ELEMENT NO.4 (FLOOR FINISHES) CARRIED TO
BILL SUMMARY 1,530,000

Item Description Unit Qty Rate (UGX) Amount (UGX)

ELEMENT NO 5 : WALL FINISHES

External wall finishes

Cement and sand (1:4)

A 12mm thick plaster ready to receive rough cast. SM 298 8,000 2,385,600

B 10mm Roughcast coat. SM 298 5,000 1,491,000

Internal Wall finishes

C 12mm thick plaster ready to receive paint. SM 175 8,000 1,401,600

Prepare surfaces: apply three coats of Silk vinyl


emulsion paint off white: on steel trowelled plaster: to

F Wall surfaces internally SM 175 8,500 1,489,200


TOTAL ELEMENT NO.5 (WALL FINISHES) CARRIED TO
BILL SUMMARY 6,767,400

Item Description Unit Qty Rate (UGX) Amount (UGX)

ELEMENT NO 6 : CEILING FINISHES

Plastered ceiling to include

A 50 x 50mm softwood timber branderings LM 300 5,000 1,500,000

B 75 x 50mm softwood timber joists LM 260 5,000 1,300,000

Expanded metal lathe (Chicken wire mesh to ceiling


C
structure) Bundles 7 46,000 322,000

D 25mm thick screeds to expamet ceiling SM 189 8,000 1,508,480

Painting - Use Sadolin paint

Prepare and apply three coats of sadolin paint to expamet


E ceiling SM 189 8,500 1,602,760
TOTAL ELEMENT NO.6 (CEILING FINISHES) CARRIED TO
BILL SUMMARY 6,233,240

Item Description Unit Qty Rate (UGX) Amount (UGX)

ELEMENT NO 7 : ROOF FINISHES

28 Gauge pre-coated super eco iron roofing sheets fixed:


1 1/2 corrugations side laps: fixed to timber purlins.

28 gauge pre-painted Super eco sheet (colour to be given by


the stake Holders) and fixing accessories from approved
C manufacturer's lapped and fixed on timber purlins
(measured separately) in accordance with manufacturer's
instructions. SM 195 37,000 7,215,000
TOTAL ELEMENT NO.7 (ROOF FINISHES) CARRIED TO
BILL SUMMARY 7,215,000