SUMMARY OF BILL
Contigency 5% 1,628,525
SUBTOTAL 2 34,199,025
ELEMENT NO 1 : SUPERSTRUCTURE
Sawn formwork: to
Structural timbers:
Roofing Material
ELEMENT NO 3 : DOORS
Painting
A 12mm thick plaster ready to receive rough cast. SM 298 8,000 2,385,600