WEEKLY REPORT

PROJECT : BALIWOOD II - LIMA 20

WORK : LOT 2
SUB. WORK : RESIDENTIAL
LOCATION : JL. BABADAN, PERERENAN, KEC. MENGWI - BADUNG

LOT 2
NO DESCRIPTION SPECIFICATION UNIT QTY
PROGRES
VOLUME
S
III ARCHITECTURE WORK
A VILLA LOT - 2
1 Wall %
Villa Main Building & Additional
- Waterproofing Under Light Brick Wall SikaTop 107 Seal m' 164,11 164,11 100,00
- Light Brick Wall - 1 Layer m
2 280,29 280,29 100,00
- Light Brick Wall - 2 Layers m
2 131,94 131,94 100,00
- Foam Mounting Top Light Brick Wall PU Sealant Spray m' 164,11 164,11 100,00
- Wall Plaster Lokal m
2 830,18 830,18 100,00
- Wall Smooth Render m
2 783,34 783,34 100,00
- Opening Door & Windows m' 102,89 102,89 100,00
- Wall Corner (Corner Bead-Inner Bead) SCK A1 CW UPVC m' 445,85 445,85 100,00
- Painted Render Wall - Inside Dulux Interior A700 m
2 484,36 0 0,00
- Painted Render Wall - Outside Dulux Weathershield White m' 315,28 0 0,00
- Floor Niro Granite Tile 60 x 120 Cm Murale GML01 - Str m
2 5,30 5,1 96,23
- Floor Niro Granite Tile 60 x 60 Cm Partino PB501 - Matt m
2 14,18 14,18 100,00
- Floor Niro Granite Tile 15 x 60 Cm Roman Granite GT612223R m
2 34,65 34,65 100,00
2
- Railing Steel Hollow + Plate Thk. 4 mm Void Costume m 5,52 0 0,00
2
- Railing Steel Pipe 1,5" + Plate Thk. 4 mm Roof Top Costume m 8,75 0 0,00
Outside Villa Fence
- Waterproofing Under Batako Wall SikaTop 107 Seal m' 45,58 45,58 100,00
- Batako Wall Local m
2 100,25 100,25 100,00
- Wall Plaster m
2 176,48 176,48 100,00
- Wall Smooth Render m
2 176,48 176,48 100,00
- Wall Corner (Corner Bead-Inner Bead) SCK A1 CW UPVC m' 33,00 33,00 100,00
- Wall Texture Painted Dulux Weathershield White m
2 88,24 0 0,00
- Painted Render Wall - Outside Dulux Weathershield White m' 88,24 0 0,00
2 Floor Main Villa & Additional
- Screed; Thk. 30 mm Cement PCC m
2 242,79 242,79 100,00
- Floor Niro Granite Tile 60 x 120 Cm Murale GML01 - Str m
2 97,80 97,80 100,00
- Floor Niro Granite Tile 60 x 60 Cm Partino PB501 - Matt m
2 139,56 139,56 100,00
- Floor Niro Granite Tile 15 x 60 Cm Roman Granite GT612223R m
2 5,43 5,43 100,00
- Skirting Shadow Line 10 mm SCK D10 W UPVC m' 275,76 275,76 100,00
3 Ceiling Main Villa & Additional
- Ceiling Gypsum + Frame Hollow Jaya Board Thk. 9 mm m
2 100,54 100,54 100,00
- Ceiling Gypsum Water Resistant + Frame Hollow Jaya Board Thk. 9 mm m
2 36,41 36,41 100,00
- Aluminium U Profile 10 mm (Inside) Local m' 169,74 169,74 100,00
- Lamber Ceiling + Frame Hollow/Wooden Kamper Wooden 10x90 Cm m
2 18,88 18,88 100,00
- Curtain Cove Gypsum + Frame Hollow Jaya Board Thk. 9 mm m' 16,12 16,12 100,00
- Ceiling Painted Dulux A700 White m
2 306,69 0 0,00
- Lamber Ceiling Painted Natural Lasur Ex. Propan m
2 18,88 0 0,00
- Cladding Wooden Pergola Bengkirai Wooden 3 x 3 Cm m
2 54,00 0 0,00
4 Doors & Windows
- DG 2,300 x 1,200 mm Unit 1,00
0 0,00
Bengkirai Timber Panel Local Wood
- D1 3,000 x 1,150 mm Unit 1,00
Alexindo-Glass Thk. 8 mm 1 100,00
Aluminiun 4" (Swing Door + Accessories)
- D2 2,800 x 1,000 mm Unit 2,00
Alexindo-Glass Thk. 8 mm 1 50,00
Aluminiun 4" (Swing Door + Accessories)
Unit
- DS1 3,000 x 3,700 mm 1,00
Alexindo-Glass Thk. 8 mm 1 100,00
Aluminiun 4" (Door Sliding + Accessories)
- DS2 3,000 x 3,000 mm Unit 1,00
Alexindo-Glass Thk. 8 mm 1 100,00
Aluminiun 4" (Door Sliding + Accessories)
- DS3 3,200 x 4,650 mm Unit 1,00
Alexindo-Glass Thk. 8 mm 1 100,00
Aluminiun 4" (Door Sliding + Accessories)
PROJECT : BALIWOOD II - LIMA 20

WORK : LOT 2
SUB. WORK : RESIDENTIAL
LOCATION : JL. BABADAN, PERERENAN, KEC. MENGWI - BADUNG

LOT 2
NO DESCRIPTION SPECIFICATION UNIT QTY
PROGRES
VOLUME
S
- W1 3,000 x 3,425 mm Unit 1,00
Alexindo-Glass Thk. 8 mm 0 0,00
Aluminiun 4" (Glass Fixed Window)
- W2 2,800 x 3,700 mm Unit 1,00
Alexindo-Glass Thk. 8 mm 1 100,00
Aluminiun 4" (Glass Fixed Window)
- W3 2,800 x 1,450 mm Unit 1,00
Alexindo-Glass Thk. 8 mm 1 100,00
Aluminiun 4" (Glass Fixed Window)
- W4 2,800 x 1,400 mm Steel Frame with Coating Unit 1,00
1 100,00
Aluminiun 4" (Glass Fixed Window) Black - Temp. Glass Thk. 10
- W5 2,800 x 2,600 mm mm Unit 1,00
Alexindo-Glass Thk. 8 mm 1 100,00
Aluminiun 4" (Glass Fixed Window)
- W6 2,000 x 2,000 mm Steel Frame with Coating Unit 1,00
1 100,00
Aluminiun 4" (Glass Fixed Window) Black - Temp. Glass Thk. 10
- W7 2,800 x 800 mm mmGlass Block 20 x 20 Cm 2 2,40
m
- W8 1,700 x 1,700 mm Steel Frame with Coating Unit 1,00
Aluminiun 4" (Glass Fixed Window) Black - Temp. Glass Thk. 10
5 Sanitary (SBO) mm
- Toilet Bathroom AS CHF01000-1CACTDG01 Set 4,00 0 0,00
- Sink Bathroom AS CCASF412-1000410F0 Set 4,00 0 0,00
- Faucet (Black) Bathroom Ateson - AT102BBA2 Set 4,00 0 0,00
- P-Trap for Lavatory Set 4,00 0 0,00
- Stop Valve Set 4,00 0 0,00
- Shower Set Ateson - AT121BBA2 Set 4,00 0 0,00
Ateson - AT122BBA Set 4,00 0 0,00
Ateson - AT123BBA Set 4,00 0 0,00
- Jet Spray Ateson - AT313CBA Set 4,00 0 0,00
- Stop Valve Ateson - AT314ABA Set 4,00 0 0,00
- Faucet Bathtub Ateson - AT104BBA Set 2,00 0 0,00
- Bathtub Bathtub Costum Set 2,00 0 0,00
- Floor Drain Ateson - AT062BA80 Set 3,00 0 0,00
- Floor Drain Ateson - AT061BAM Set 2,00 0 0,00
- Clean Out 4 Inch Paloma - COP1103 Brass Set 4,00 0 0,00
- Wall Tap Faucet Onda - CLS03 1/2 inch Set 2,00 0 0,00
6 Swiming Pool
- Bowplank m' 20,40 20,40 100,00
- Foundation; Beam; Floor; Wall Pool Excavation Soil m
2 41,81 41,81 100,00
- Coral & Stamper; Thk. 100 mm Local m
3 4,46 4,46 100,00
- Screed; Thk. 50 mm Cement PCC m
3 2,35 2,35 100,00
- Formwork Plywood Thk. 9 mm Local m
2 30,98 30,98 100,00
- Formwork Batako Local m
2 41,68 41,68 100,00
- Plastic Geo Membrane Thk. 0,3 mm ACT m
2 27,49 27,49 100,00
Foundation Pilecap
- Rebar D13 mm - Foundation Pilecap SNI Kg 164,74 164,74 100,00
Tie Beam
- Rebar D13 mm - Tie Beam SNI Kg 142,90 142,90 100,00
- Begel Ø10 mm - Tie Beam SNI Kg 83,30 83,30 100,00
Column
- Rebar D13 mm - Column SNI Kg 89,86 89,86 100,00
- Begel Ø10 mm - Column SNI Kg 36,65 36,65 100,00
Wall & Floor Pool
- Rebar Ø10 mm - Wall & Floor Pool SNI Kg 732,32 732,32 100,00
- Water Stop Sika WaterBar V25 m' 19,60 19,60 100,00
- Concrete K-250 m
3 14,36 14,36 100,00
- Waterproofing Pool SikaTop 107 Seal m
2 46,79 46,79 100,00
- Green Stone Sukabumi 100 x 100 mm Local Sukabumi m
2 46,79 46,79 100,00
- Temprede Glass Thk. 12 mm - Double Layers Megi Glass m
2 1,54 1,54 100,00
7 Sunken Pool
- Bowplank m' 12,02 12,02 100,00
- Sunken Pool Excavation Soil m
3 6,60 6,60 100,00
PROJECT : BALIWOOD II - LIMA 20

WORK : LOT 2
SUB. WORK : RESIDENTIAL
LOCATION : JL. BABADAN, PERERENAN, KEC. MENGWI - BADUNG

LOT 2
NO DESCRIPTION SPECIFICATION UNIT QTY
PROGRES
VOLUME
S
- Coral & Stamper; Thk. 100 mm Local m
3 0,66 0,66 100,00
- Screed; Thk. 50 mm Cement PCC m
3 0,33 0,33 100,00
- Formwork Plywood Thk. 9 mm Local m
2 6,22 6,22 100,00
- Formwork Batako Local m
2 12,66 12,66 100,00
- Plastic Geo Membrane Thk. 0,3 mm ACT m
2 14,88 14,88 100,00
- Wiremesh M6-150 (2 Layers) SNI m
2 28,96 28,96 100,00
- Concrete K-250 m
3 1,45 1,45 100,00
- Waterproofing Pool SikaTop 107 Seal m
2 14,48 14,48 100,00
- Polish Cement Seater Demix Natural Grey 3,14 0,00 0,00
8 Sunken Living Room
- Sunken Pool Excavation Soil m
3 6,60 6,60 100,00
- Coral & Stamper; Thk. 100 mm Local m
3 0,66 0,66 100,00
- Screed; Thk. 50 mm Cement PCC m
3 0,33 0,33 100,00
- Formwork Plywood Thk. 9 mm Local m
2 6,22 6,22 100,00
- Formwork Batako Local m
2 12,66 12,66 100,00
- Plastic Geo Membrane Thk. 0,3 mm ACT m
2 14,88 14,88 100,00
- Wiremesh M6-150 (2 Layers) SNI m
2 28,96 28,96 100,00
- Concrete K-250 m
3 1,45 1,45 100,00
- Waterproofing Pool SikaTop 107 Seal m
2 14,48 14,48 100,00
- Polish Cement Seater Demix Natural Grey 10,40 0,00 0,00
9 Pump Room
- Bowplank m' 15,40 15,40 100,00
- Pump Room Excavation Soil m
3 26,46 26,46 100,00
- Coral & Stamper; Thk. 100 mm Local m
3 1,47 1,47 100,00
- Screed; Thk. 50 mm Cement PCC m
3 0,74 0,74 100,00
- Formwork Plywood Thk. 9 mm Local m
2 25,38 25,38 100,00
- Formwork Batako Local m
2 26,95 26,95 100,00
- Rebar 4D16 mm SNI Kg 190,89 190,89 100,00
- Begel Ø 10 mm SNI Kg 94,20 94,20 100,00
- Wiremesh M8 - 150 (2 Layers) SNI m
2 103,90 103,90 100,00
- Concrete K-250 m
3 6,52 6,52 100,00
- Waterproofing Floor & Wall Pump Room SikaTop 107 Seal m
2 51,95 51,95 100,00
10 STP Box
- Bowplank m' 4,80
- STP Excavation Soil m
3 1,87
- Sand; Thk. 100 mm Local m
3 0,25
- Rebar 4D16 mm SNI Kg 93,54
- Begel Ø 10 mm SNI Kg 30,39
- Wiremesh M8 - 150 (2 Layers) SNI m
2 2,88
- Wall Batako Local m
2 6,24
- Concrete K-250 m
3 0,55
- Absorption Well w/ Palm Fibers and Stones Unit 1,00
11 Structure Villa Additional
- Bowplank m' 21,90 21,90 100,00
- Foundation Excavation Soil m
3 40,82 40,82 100,00
- Backfill Soil m
3 12,35 12,35 100,00
- Screed; Thk. 50 mm Cement PCC m
3 0,88 0,88 100,00
- Foundation Aastamping Local m
3 3,51 3,51 100,00
- Foundation River Stone Local m
3 12,15 12,15 100,00
- Lime Stone & Compact; Thk. 200 mm Local m
3 4,61 4,61 100,00
- Plastic Geo Membrane Thk. 0,3 mm ACT m
2 25,00 25,00 100,00
Foundation Footplate 1,200 x 1,200 mm
- Rebar D13 mm - Foundation Pilecap SNI Kg 309,50 309,50 100,00
- Formwork Plywood Thk. 9 mm Local m
2 11,52 11,52 100,00
- Concrete K-250 m
3 3,46 3,46 100,00
Pedestal 150 x 400 mm
- Rebar D13 mm - Pedestal SNI Kg 106,08 106,08 100,00
- Begel Ø10 mm - Pedestal SNI Kg 28,38 28,38 100,00
PROJECT : BALIWOOD II - LIMA 20

WORK : LOT 2
SUB. WORK : RESIDENTIAL
LOCATION : JL. BABADAN, PERERENAN, KEC. MENGWI - BADUNG

LOT 2
NO DESCRIPTION SPECIFICATION UNIT QTY
PROGRES
VOLUME
S
- Formwork Plywood Thk. 9 mm Local m
2 6,60 6,60 100,00
- Concrete K-250 m
3 0,36 0,36 100,00
Tie Beam 150 x 250 mm
- Rebar D13 mm - Tie Beam SNI Kg 59,72 59,72 100,00
- Begel Ø10 mm - Tie Beam SNI Kg 93,29 93,29 100,00
- Formwork Batako Local m
2 4,05 4,05 100,00
- Formwork Plywood Thk. 9 mm Local m
2 6,75 6,75 100,00
- Concrete K-250 m
3 1,01 1,01 100,00
Floor Slab Ground Floor Thk. 100 mm
- Wiremesh M6-150 (2 Layers) SNI m
2 58,32 58,32 100,00
- Concrete K-250 m
3 1,01 1,01 100,00
Column 150 x 400 mm
- Rebar D13 mm - Column SNI Kg 187,20 187,20 100,00
- Begel Ø10 mm - Column SNI Kg 103,66 103,66 100,00
- Formwork Plywood Thk. 9 mm Local m
2 24,75 24,75 100,00
- Concrete K-250 m
3 1,35 1,35 100,00
Beam (B1) 200 x 400 mm
- Rebar D13 mm - Beam B1 SNI Kg 228,80 228,80 100,00
- Begel Ø10 mm - Beam B1 SNI Kg 117,32 117,32 100,00
- Formwork Plywood Thk. 9 mm Local m
2 23,76 23,76 100,00
- Concrete K-250 m
3 2,16 2,16 100,00
Beam (B2) 200 x 350 mm
- Rebar D13 mm - Beam B1 SNI Kg 265,20 265,20 100,00
- Begel Ø10 mm - Beam B1 SNI Kg 98,75 98,75 100,00
- Formwork Plywood Thk. 9 mm Local m
2 16,50 16,50 100,00
- Concrete K-250 m
3 1,75 1,75 100,00
Floor Slab Rooftop Thk. 100 mm
- Wiremesh M8-150 (2 Layers) SNI m
2 58,32 58,32 100,00
- Formwork Plywood Thk. 9 mm Local m
2 29,16 29,16 100,00
- Support Formwork Local m
2 29,16 29,16 100,00
- Concrete K-250 m
3 1,01 1,01 100,00
- Leveling Screed m
3 29,16 29,16 100,00
- Barrier Wall Thk. 100 mm with Rebars m' 27,00 27,00 100,00
- Waterproofing Mapei Plastic m
2 38,19 38,19 100,00
12 Structure Roof Top
I Steel Structure
- Column WF 250 x 125 x 6 x 9 mm SNI Kg 504,10 504,10 100,00
- Baseplate; Thk. 10 mm SNI Kg 63,62 63,62 100,00
- Hilti Dynabolt Trubolt HST-R M16 x 90 mm SNI - HILTI Point 36,00 36,00 100,00
- Beam WF 150 x 75 x 5 x 7 mm SNI Kg 692,38 692,38 100,00
- Beam WF 100 x 50 x 5 x 7 mm SNI Kg 284,86 284,86 100,00
- Baseplate; Thk. 8 mm SNI Kg 359,54 359,54 100,00
- Bolt HTB M16 x 44 mm SNI Kg 142,00 142,00 100,00
- Hollow 40 x 60 x 1,7 mm SNI m' 65,58 0,00 0,00
- Painting (Zincromate & Finish) Kansai Kg 1.970,08 1.970,08 100,00
- Ceiling & Lisplank Wooden Pergola Bengkirai Wooden 3 x 3 Cm m
2 67,52 0,00 0,00
- Frame Hollow 100 x 50 w/ 50 x 50 mm Hollow Steel m
2 56,82 56,82 100,00
- Spandex Roof m
2 56,82 0,00 0,00
II Concrete Sturcture
Column
- Rebar D13 mm - Column SNI Kg 46,59 46,59 100,00
- Begel Ø10 mm - Column SNI Kg 37,33 37,33 100,00
- Formwork Plywood Thk. 9 mm Local m
2 6,72 6,72 100,00
- Concrete K-250 m
3 0,25 0,25 100,00
Beam (B1) 200 x 400 mm
- Rebar D13 mm - Beam B1 SNI Kg 97,34 97,34 100,00
- Begel Ø10 mm - Beam B1 SNI Kg 41,65 41,65 100,00
- Formwork Plywood Thk. 9 mm Local m
2 8,96 8,96 100,00
PROJECT : BALIWOOD II - LIMA 20

WORK : LOT 2
SUB. WORK : RESIDENTIAL
LOCATION : JL. BABADAN, PERERENAN, KEC. MENGWI - BADUNG

LOT 2
NO DESCRIPTION SPECIFICATION UNIT QTY
PROGRES
VOLUME
S
- Concrete K-250 m
3 0,67 0,67 100,00
Beam (B2) 200 x 350 mm
- Rebar D13 mm - Beam B1 SNI Kg 14,35 14,35 100,00
- Begel Ø10 mm - Beam B1 SNI Kg 6,91 6,91 100,00
- Formwork Plywood Thk. 9 mm Local m
2 1,38 1,38 100,00
- Concrete K-250 m
3 0,09 0,09 100,00
Floor Slab Rooftop Thk. 100 mm
- Wiremesh M8-150 (2 Layers) SNI m
2 10,12 10,12 100,00
- Formwork Plywood Thk. 9 mm Local m
2 5,06 5,06 100,00
- Support Formwork Local m
2 5,06 5,06 100,00
- Concrete K-250 m
3 0,61 0,61 100,00
- Leveling Screed m
3 5,06 5,06 100,00
- Barrier Wall Thk. 100 mm with Rebars m' 9,00 9,00 100,00
- Waterproofing Mapei Plastic m
2 89,46 89,46 100,00
III Planter Box
- Wiremesh M6-150 (2 Layers) SNI m
2 58,32 58,32 100,00
- Formwork Plywood Thk. 9 mm Local m
2 5,06 5,06 100,00
- Concrete K-250 m
3 0,61 0,61 100,00
- Waterproofing SikaTop 107 Seal m
2 46,79 46,79 100,00
IV Jacuzzi
- Wiremesh M6-150 (2 Layers) SNI m
2 15,80 15,80 100,00
- Formwork Plywood Thk. 9 mm Local m
2 15,80 15,80 100,00
- Concrete K-250 m
3 1,19 1,19 100,00
- Batako Stair Ls 1,00 1,00 100,00
- Waterproofing Mapei Plastic m
2 17,00 17,00 100,00
- Green Stone Sukabumi 100 x 100 mm Local Sukabumi m
2 9,50 9,50 100,00
- Temprede Glass Thk. 12 mm - Tripel Layers Asahimas m
2 2,81 0,00 0,00
V Seater 100,00
4,84 4,84
- Light Brick Wall - 1 Layer m
2

- Coral; Thk. 200 mm Local m


3 3,67 3,67 100,00
- Wiremesh M6-150 (1 Layer) SNI m
2 19,34 19,34 100,00
- Concrete K-250 m
3 1,93 1,93 100,00
- Screed; Thk. 20 mm Cement PCC m
2 51,01 51,01 100,00
- Polish Cement Seater Demix Natural Grey 51,01 0,00 0,00
13 Steel Structure - Stair
I Stair - Ground Floor
- Black Steel Pipe - 4 Inch; Thk. 4 mm SNI m' 8,38 8,38 100,00
- Column WF 200 x 100 x 5,5 x 8 mm SNI Kg 145,64 145,64 100,00
- Baseplate; Thk. 10 mm SNI Kg 19,75 19,75 100,00
- Baseplate; Thk. 8 mm 29,22 29,22 100,00
- Hilti Dynabolt Trubolt HST-R M16 x 90 mm SNI - HILTI Point 20,00 20,00 100,00
- Bolt HTB M12 x 40 mm SNI Kg 24,00 24,00 100,00
- Steel Elbow 50 x 50 x 5 mm SNI Kg 190,85 171,13 89,67
- Painting (Zincromate & Finish) Kansai Kg 496,50 496,50 100,00
- Railing Steel Hollow + Plate Thk. 4 mm Costume m' 7,25 0,00 0,00
II Stair - Second Floor
- Black Steel Pipe - 4 Inch; Thk. 4 mm SNI m' 8,38 0,00 0,00
- Column WF 200 x 100 x 5,5 x 8 mm SNI Kg 145,64 0,00 0,00
- Baseplate; Thk. 10 mm SNI Kg 19,75 0,00 0,00
- Baseplate; Thk. 8 mm 29,22 0,00 0,00
- Hilti Dynabolt Trubolt HST-R M16 x 90 mm SNI - HILTI Point 20,00 0,00 0,00
- Bolt HTB M12 x 40 mm SNI Kg 24,00 0,00 0,00
- Steel Elbow 50 x 50 x 5 mm SNI Kg 190,85 0,00 0,00
- Painting (Zincromate & Finish) Kansai Kg 496,50 0,00 0,00
- Railing Steel Hollow + Plate Thk. 4 mm Costume m' 7,25 0,00 0,00
III Stair - Roof Top
- Black Steel Pipe - 4 Inch; Thk. 4 mm SNI m' 2,73 0,00 0,00
- Baseplate; Thk. 10 mm SNI Kg 8,56 0,00 0,00
PROJECT : BALIWOOD II - LIMA 20

WORK : LOT 2
SUB. WORK : RESIDENTIAL
LOCATION : JL. BABADAN, PERERENAN, KEC. MENGWI - BADUNG

LOT 2
NO DESCRIPTION SPECIFICATION UNIT QTY
PROGRES
VOLUME
S
- Hilti Dynabolt Trubolt HST-R M16 x 90 mm SNI - HILTI Point 8,00 0,00
- Steel Elbow 50 x 50 x 5 mm SNI Kg 72,58 0,00
- Painting (Zincromate & Finish) Kansai Kg 156,18 0,00
- Railing Steel Pipe Bent Pipe Dia. 1,5 Inch m' 2,98 0,00
14 Back Gutter
- Gutter Excavation Soil m
3 6,87 6,87 100,00
- Coral & Stamper; Thk. 100 mm Local m
3 0,72 0,72 100,00
- Screed; Thk. 50 mm Cement PCC m
3 0,36 0,00 0,00
- U-Ditch Dia. 600 x 700 mm K-300 m' 9,04 9,04 100,00
- Close U-Ditch K-300 m' 9,04 9,04 100,00