Pandian Park_ROOF SLAB
extra at top
L/4
0.3L
10# @6"c/c
Bothways
L/4
L/4
5"tk
0.3L
L/4
Provide 8# @12"c/c
extra at top
L/4
0.3L
0.3L
5"tk
10# @6"c/c
Bothways
L/4
L/4
L/4
L/4
0.3L
5"tk
8# @6"c/c
SUNKEN
BY 10"
8# @7"c/c
10# @6"c/c
L/4
5"tk
10# @6"c/c
5"tk
8# @6"c/c
7 7
NOTE:
1. Design :G+ 1 - S.B.C for soil shall not be less than 30T/sq.m
2. # - Indicates dia of high strength deformed bars of
grade Fe:500 conforming to is:1786 - 1985.
3. Use concrete mix - M35 grade and cement - 53 grade
N
4. Curing period for all structural concrete is 28 days.
5. Clear cover to main reinforcement shall be as follows and
8
concrete cover blocks (or) pvc cover blocks are to be used
A) For footings - 75 mm (3") B) For columns - 40 mm (1.5")
6. General lap length to column reinforcement-
50 times the bar diameter
8. Provide a lap length of 60 d for beams and slab
reinfoecements where d is diameter of main bars
W E
7. Reinforcement in the slabs shall be cranked at 0.21l 9. ±0.0 LVL taken as ground floor F.F.L
from support and extra rods shall be for 0.31 length