Pandian Park_ Structural Drawing
Pandian Park_ Structural Drawing
1'-3"
C1 2' C2
A
F2 2' F2
WELL
7'-7"
2'-9"
B
C2
F1 6'-6"
6'-9"
8'-9"
3"
C
C1 F1 C3
C1 F2
9'-121"
[2.78]
16'-3"
4'
C1 3' 3"
D
C3
3'
C1
F2
5'-11" F3
E
4'-8" 4'
421" C3 421" C1
F 4'
C1 F2 F4 F4
18'-3"
23'
7 7
NOTE:
1. Design :G+ 1 - S.B.C for soil shall not be less than 30T/sq.m
2. # - Indicates dia of high strength deformed bars of
grade Fe:500 conforming to is:1786 - 1985.
3. Use concrete mix - M35 grade and cement - 53 grade
N
4. Curing period for all structural concrete is 28 days.
5. Clear cover to main reinforcement shall be as follows and
8
concrete cover blocks (or) pvc cover blocks are to be used
A) For footings - 75 mm (3") B) For columns - 40 mm (1.5")
6. General lap length to column reinforcement-
50 times the bar diameter
8. Provide a lap length of 60 d for beams and slab
reinfoecements where d is diameter of main bars
W E
7. Reinforcement in the slabs shall be cranked at 0.21l 9. ±0.0 LVL taken as ground floor F.F.L
from support and extra rods shall be for 0.31 length
unless specified otherwise where l is clear span
S
A B C D E F
EXISTING GR. LVL.
GRADE BEAM
L
B
PEDESTAL
L L1
H
L1
B1 B B1
B
L1
d L B1
ISOLATED FOOTING L
SECTION DETAILS B
8# @6"c/c
1'
8# @6"c/c 8# @6"c/c
1'-3"
1'-3"
1'-3"
3-#12 ST + 3-#16 ST +
3-#12 ST 3-#16 ST
1-#12 CURT 1-#12 CURT
3"
3"
3"
3"
NOTE:
1. Design :G+ 1 - S.B.C for soil shall not be less than 30T/sq.m
2. # - Indicates dia of high strength deformed bars of
grade Fe:500 conforming to is:1786 - 1985.
3. Use concrete mix - M35 grade and cement - 53 grade
4. Curing period for all structural concrete is 28 days.
N
5. Clear cover to main reinforcement shall be as follows and
8
concrete cover blocks (or) pvc cover blocks are to be used
A) For footings - 75 mm (3") B) For columns - 40 mm (1.5")
6. General lap length to column reinforcement- 8. Provide a lap length of 60 d for beams and slab
W E
50 times the bar diameter reinfoecements where d is diameter of main bars
9. ±0.0 LVL taken as ground floor F.F.L
7. Reinforcement in the slabs shall be cranked at 0.21l
from support and extra rods shall be for 0.31 length
S
unless specified otherwise where l is clear span
A B C D E F
1'-6" 1'-6" 9"
13'-5" 6'-3"
2'
9"
PB2
21'-11"
13'-221" 13'-221"
PB2
PB2
PB1
1'-6"
17'-2"
14'-9" 16'-3"
PB2 PB1
PB2
PB1
1'-6"
17'-2"
4'-9" 4'-9"
PB2 PB2 PB2
9"
17'-2"
3'-6" 4'-3"
PB1
1'-6"
7 7
NOTE:
1. Design :G+ 1 - S.B.C for soil shall not be less than 30T/sq.m
2. # - Indicates dia of high strength deformed bars of
grade Fe:500 conforming to is:1786 - 1985.
3. Use concrete mix - M35 grade and cement - 53 grade
N
4. Curing period for all structural concrete is 28 days.
5. Clear cover to main reinforcement shall be as follows and
8
concrete cover blocks (or) pvc cover blocks are to be used
A) For footings - 75 mm (3") B) For columns - 40 mm (1.5")
6. General lap length to column reinforcement-
50 times the bar diameter
8. Provide a lap length of 60 d for beams and slab
reinfoecements where d is diameter of main bars
W E
7. Reinforcement in the slabs shall be cranked at 0.21l 9. ±0.0 LVL taken as ground floor F.F.L
from support and extra rods shall be for 0.31 length
unless specified otherwise where l is clear span
S
A B C D E F
1'-6" 1'-6" 9"
13'-5" 6'-3"
FC1
9"
RB3 7'
6'-521"
21'-11"
13'-221" 13'-221"
RB2 CB1 RB3 4Nos-16# +
2Nos -12#
RB1
8# @6"c/c
1'
1'-6"
17'-2"
9"
RB1 FC -1
14'-9" RB2 16'-3"
17'-2" RB2
17'-2"
RB1
1'-6"
4'-9" 17'-2"
SUNKEN
BY 10"
9'-8"
5'
CB1
7 7
NOTE:
1. Design :G+ 1 - S.B.C for soil shall not be less than 30T/sq.m
2. # - Indicates dia of high strength deformed bars of
grade Fe:500 conforming to is:1786 - 1985.
3. Use concrete mix - M35 grade and cement - 53 grade
N
4. Curing period for all structural concrete is 28 days.
5. Clear cover to main reinforcement shall be as follows and
8
concrete cover blocks (or) pvc cover blocks are to be used
A) For footings - 75 mm (3") B) For columns - 40 mm (1.5")
6. General lap length to column reinforcement-
50 times the bar diameter
8. Provide a lap length of 60 d for beams and slab
reinfoecements where d is diameter of main bars
W E
7. Reinforcement in the slabs shall be cranked at 0.21l 9. ±0.0 LVL taken as ground floor F.F.L
from support and extra rods shall be for 0.31 length
unless specified otherwise where l is clear span
S
A B C D E F
ROOF BEAM SECTION DETAILS
Beam No Mid section End section Cantilever beam
1No. 16# Notes:
3Nos-16# extra at 0.3L 1) Use concrete mix 1:121:3
2Nos-16# 2) Provide clear cover 1" for Beam
1'-3"
1'-3"
3 for Slab reinforcement.
RB 1 8# @6"c/c 2Nos-16#ckd. 4
3) Provide lap length 50D for Beam
(9"x15") 8# @6"c/c
2Nos-16#ckd. 4) Crank at L/4of clear span
5) Extra rod at top to a length of 0.3L
of clear span from support
2Nos-16# st. 3Nos-16# st.
9" 9" 6) ST - indicates Straight rod.
7) CKD- indicates Cranked rod .
8) # - Indicates TOR Steel
1No. 12#
3Nos-16# extra at 0.3L
2Nos-16#
1'-6"
1'-6"
RB 2 8# @7"c/c 2Nos-16#ckd.
(9"x18") 8# @5"c/c
2Nos-16#ckd.
1'-6"
1'-6"
1'-6"
RB 3
(9"x18") 8# @5"c/c 8# @5"c/c 8# @5"c/c
3Nos-12# 3Nos-12#
5"
5"
CB 1
8# @6"c/c 8# @6"c/c
(9"x5")
3Nos-12# 3Nos-12#
9" 9"
7 7
NOTE:
1. Design :G+ 1 - S.B.C for soil shall not be less than 30T/sq.m
2. # - Indicates dia of high strength deformed bars of
grade Fe:500 conforming to is:1786 - 1985.
3. Use concrete mix - M35 grade and cement - 53 grade
N
4. Curing period for all structural concrete is 28 days.
5. Clear cover to main reinforcement shall be as follows and
8
concrete cover blocks (or) pvc cover blocks are to be used
A) For footings - 75 mm (3") B) For columns - 40 mm (1.5")
6. General lap length to column reinforcement-
50 times the bar diameter
8. Provide a lap length of 60 d for beams and slab
reinfoecements where d is diameter of main bars
W E
7. Reinforcement in the slabs shall be cranked at 0.21l 9. ±0.0 LVL taken as ground floor F.F.L
from support and extra rods shall be for 0.31 length
unless specified otherwise where l is clear span
S
A B C D E F
Provide 8# @12"c/c 2'
extra at top
L/4
0.3L
10# @6"c/c
Bothways
L/4
L/4
5"tk
0.3L
L/4
Provide 8# @12"c/c
extra at top
L/4
0.3L
0.3L
5"tk
10# @6"c/c
Bothways
L/4
L/4
L/4
L/4
0.3L
5"tk
8# @6"c/c
SUNKEN
BY 10"
8# @7"c/c
10# @6"c/c
L/4
5"tk
10# @6"c/c
5"tk
8# @6"c/c
7 7
NOTE:
1. Design :G+ 1 - S.B.C for soil shall not be less than 30T/sq.m
2. # - Indicates dia of high strength deformed bars of
grade Fe:500 conforming to is:1786 - 1985.
3. Use concrete mix - M35 grade and cement - 53 grade
N
4. Curing period for all structural concrete is 28 days.
5. Clear cover to main reinforcement shall be as follows and
8
concrete cover blocks (or) pvc cover blocks are to be used
A) For footings - 75 mm (3") B) For columns - 40 mm (1.5")
6. General lap length to column reinforcement-
50 times the bar diameter
8. Provide a lap length of 60 d for beams and slab
reinfoecements where d is diameter of main bars
W E
7. Reinforcement in the slabs shall be cranked at 0.21l 9. ±0.0 LVL taken as ground floor F.F.L
from support and extra rods shall be for 0.31 length
unless specified otherwise where l is clear span
S
A B C D E F