Professional Documents
Culture Documents
001 (R5)-1
001 (R5)-1
001 (R5)-1
03 04
02 13.18 8.95 05
13.13
KEY PLAN :
01 12.20 06
PLOT LIMIT LINE
4.45 4.45 4.45 4.45
12.25
4.45 4.45 4.45
4.45
4.45 4.45
4.45 4.45
3.30 4.45 E=507871.315
E=507909.418 I M I T 3.30 L OT
N=2794095.229
4.45
P
L
N=2794152.239
L
OT
IMI T
REFERENCE IFC,SHOP DRAWINGS & RFI No.S
PL
C5 C5
C6
C6
C5 C5
N E I G H B O U R S P L O T
A
10.00
09 ABC/1075/AEC/MEP/SD/BW-004 BUILDERS WORK LAYOUT 00 C*
C2
CW1
-12.55 S.S.LCW1
STAIR -3
8.00
CW2 CW2 CW2 CW2
C4
C4
01
C1
STAIR DETAILS
C1
03 04
ENT 3
ENT 2
8.00
BASEM
GROUND FLOOR SLAB
C4
ENT 3 TO
C1
C1
1:10
FROM BASEM
05
SLOPE
02
FROM BASEM
D
RAMP DOWN
RAMP UP
8.00
70.10
70.10
C4 C4
C1
C1
STAIR -1
13.13
E
C6
STAIR -2
SCHEDULE OF
C6
8.00
00
SB1 CW3
CW4
S-404
SB1 SB1
06
01 06
C5
12.20
005
15
SPANDREL BEAMS
C5 C1
C1
006
22
C2
007
C2
8.00
28
C3
004
A-408 ,408A, 408B 00
C3
08
LIFT DETAILS GROUND FLOOR
C1 C3*
05
TOP OF RAFT
G
006
-11.30 S.S.L
23
1700
12.25
10.00
DMD +12.121
GA LAYOUT C4
C4
4.45
C6
C5
4.00
4.45
C5
E=507845.257
N=2794180.473 E=507820.657
T
N=2794143.688
P
4.45
0.77
I M I
3.58 2.81 3.58 3.58
L O T
3.58
I
4.45
3.55 3.57
3.60 3.58
3.58 3.58
0.77 0.77
R O A D 48.77
L
3.58 L OT
007
P
26
T
I M I
L
4.45 4.45 GROUND FLOOR SLAB CONCRETE 01
03 AESF-1315-S-300
4.45 4.45 LAYOUT
3.30 4.45 E=507871.315 GROUND TO FIRST FLOOR GENERAL NOTES :
E=507909.418 .30 PL
OT 02 S-203 01
L IMIT 3 4.45
N=2794095.229
COLUMN SETTING OUT PLAN
N=2794152.239
L I IT
01 S-303 01
OT
M
PL
250X650
ABC-1075-RFI-MEP-002-R1
ABC-1075-RFI-MEP-002-R1
OPENING LOCATION AS PER LEGENDS
(SB2)
D
MEP REQUIREMENTS
C13 C13
UP STAN
500 CW1
REF.RFI.No.20 X 970 (C13 - 80 500
ESFB4 500 LIFT-7 LIFT-8
ESFB4 5
00 X 970 0x800mm
) - SLAB
LIFT-6 STAIR-3
)
C4500mm) RFI No.003 0x800mm 24
9 70 (C13 - 80
(C4 - 90
0x 00 X 006
ESFB4 5 (SB2) (SB2) (SB2) ESFB4 5 - RC WALL/COLUMN TERMINATES 05
REVISED AS PER /CONSULTANT
COMMENT AT CLOUD AREA 12/11/2019 JOSE SK PK
00 X 970
C4 AT THE LEVEL 04
REVISED AS PER /CONSULTANT
22/10/2019 JOSE SK PK
COMMENT AT CLOUD AREA
(C4 - 90
B 0x500mm
)
- UP STAND BEAM FOR
03
REVISED AS PER /CONSULTANT
COMMENT AT CLOUD AREA
CW2
CW2
CW2
CW2
C13A 09 h
C13A (C13A - 700x60
k.
DMD +23.271 - POURSTRIP 1 METER 00 ISSUE FOR APPROVAL 15/08/2019 JOSE SK PK
m)
00x600m 004
(C13A - 7 0mm)
WIDE (TYPICAL)
CW2 REV. DESCRIPTION DATE DWN CHKD APD
00mm )
(C1 - 580x5
C1 CW-2(GROUND TO ROOF
C1 CLIENT :
0
300X97 - LEVEL DIFFERENCE
ESFB2 DWG NO:- ABC-1075-SD-S-GA-SC3-007&008
S.S.L+ 0.50 (C1 - 580
x5 00mm)
REF.RFI.No.20 F.F.L + 60 06
)
500
(C F.F.L + 60
50 X 820
m)
DMD +23.421 - SLEEVES
RAMP - 01 PROJECT MANAGEMENT :
820)
11
D P.T SLAB 320mm Thk.
ESFB5 (5
004 REFER TO - SLAB OPENINGS
(550 X
ESFB5
% RAMP S
LOPE 8 LOPE 8%
RAMP S
70.10
70.10
07
RAMP - 02 C14 003 E
820) S FB3 (40 F.F.L - FINISHED FLOOR LEVEL
REFER TO x500 mm) (400 X 0X820) CONSULTANT :
0mm)
NOTE -06 ABC-1075- (C 5 - 580 ESFB3 (C14 - 90
0x60 S.S.L+ 0.00 C14 (C14 - 90
C5 DMD +23.421
0x600mm
)
SB - SPANDREL BEAM
SD-S-GA-RA-001 to 004
LOPE 8%
CW3 19
P.T SLAB 320mm Thk. C5 (C5 - 580x50
S.S.L+ 0.50 CW4 0mm) SLEEVES LOCATION ,SIZE OF SLEEVES AND SETTING DIMENSION
STAIR-1 006 STAIR-2
F.F.L + 60 REFER THE MEP GROUND FLOOR BUILDERS WORK
E
RAMP S
CW -3(GROUND TO ROOF CW -4(GROUND TO ROOF
OSED
PROP /30) DWG NO:- C10 ESFB8 (600X500) C10 DWG NO:-
DRAWING NO:- ABC/1075/AEC/MEP/SD/BW-004
0
TC1 (3 TC ABC-1075-SD-S-GA-CW3-005
- 1) TO 015 ABC-1075-SD-S-GA-CW4-005 TO 015
13 ( CW4
TION
005
LOCA
CW3 13 MAIN CONTRACTOR :
(C10 - 650x650mm) (C10 - 650x650mm)
005 THIS DRAWING IS FOR GROUND FLOOR GENERAL ARRANGEMENT ONLY -
007
29
(C5* - 600
x600mm) PC1 ALL OTHER G.A & INDIVIDUAL DETAILS REFER TO RESPECTIVE DRAWINGS.
C5* (PC1 - 600x600mm) (PC1 - 600x600mm) 21
PC1 006 C1*
C1* C5*(C (C1* - 580x
50
A I R OL I N K BUILDING CONTRACTING L.L.C
0mm) PO Box: 42649, Dubai, UAE Tel: +971 4 4473448 Fax: +971 4 4473449
004
5* - 600x6
12
00mm) www.airolinkconstruction.com
x500mm)
NOTE:
1
(C1* - 580
006
EMENT
18
002
04
F SUBCONTRACTOR :
TO BAS
1. GROUND G.A REFER TO DRAWING NO:
(C12 - 850x850mm)
LIFT - 01 ABC-1075-SD-S-GA-GR-001 to 003 - REV 0
OOR
C12 C12
ROUND
UND FL
k. (PC1 - 600x600mm)
00mm Th DROP-7
2. GROUND - 3 to ROOF FLOOR CW1 - G.A REFER TO DRAWING NO:
DROP-7 00
:10
PC1 PC1 mm Thk.
FROM G
SLOPE 1
SUBJE
C12* C12* CT TO ABC-1075-SD-S-GA-CW1-001 to 006
O GRO
(C12 - 850x850mm)
(C3 - 850x60 RFI PROJECT NAME :
C3 00mm)
0mm)
(C12* - 700x7 DROP-500mm Thk.
1) DOWN
ENT 1 T
(C3 - 850x6
00mm) (PC1 - 600x600mm) (C12* - 7 3. GROUND FLOOR to ROOF FLOOR CW2 - G.A REFER TO DRAWING NO: MINISTRY OF HUMAN RESOURCES AND
03 00 x700mm C3 02
)
ABC-1075-SD-S-GA-CW2 - 001 to 004
1:10
002
G 002 EMIRATISATION
003
05
ASEM
(RAMP-0
SLOPE
1200
X 1200 X X 400 INV
US 400
US
ESFB6
(3 PROJECT DESCRIPTION :
40
00X950)
0I
0X
DMD +23.421
40
12
X
-300X10
02) UP
00X1000
00
00
0X
0I
00 INV
)
00
(450X950
NV
(RAMP-
3
X1
US
A BC-1075-SD-S-GA-CW4-001 to 003
ESFB6 -
200 X 4
OPEN 006
TRENCH
US 400 X 1200 X 400 INV
00 INV
X1
C11 005
01 REFER TO DRAWING NO: ABC-1075-SD-S-GA-RA-001 to 004
002
ESFB7 800X500 C11 (C11 - 800x800mm) 7. REFER TO GROUND FLOOR RMU GA (PART PLAN AND SECTIONS AND DETAILS GROUND FLOOR
(C11 - 800x800mm)
SHT-(01-01)BREV-001 GENERAL ARRANGEMENT PLAN
H 00mm)
C8
00mm)
C9
(C9 - 700x700mm)
C9
(C9 - 700x700mm)
C8 500x300 OPENING
16a
005 (Sht 01 of 07)
(C8 - 700x7 (C8 - 700x7
4.00
E=507845.257
FOR SOIL PIE
(C8 - 700x700m
C8
C8 (C8 - 700
E=507820.657
m) x700mm
N=2794180.473 )
04 ID SUB CONTRACTOR TECH.DEPT. PAPER SIZE : A1
N=2794143.688
I M I T
P
CHECKED BY :
25
L
I M I T
L O T SK
006
25