03 04
02 13.18 8.95 05
13.13

KEY PLAN :
01 12.20 06
PLOT LIMIT LINE
4.45 4.45 4.45 4.45
12.25
4.45 4.45 4.45
4.45
4.45 4.45
4.45 4.45
3.30 4.45 E=507871.315
E=507909.418 I M I T 3.30 L OT
N=2794095.229
4.45

P
L
N=2794152.239

L
OT

IMI T
REFERENCE IFC,SHOP DRAWINGS & RFI No.S

PL
C5 C5
C6
C6

C5 C5

N E I G H B O U R S P L O T
A

GROUND FLOOR SLAB

10.00
09 ABC/1075/AEC/MEP/SD/BW-004 BUILDERS WORK LAYOUT 00 C*
C2
CW1
-12.55 S.S.LCW1
STAIR -3

-11.30 S.S.L CW1


C2
C*

THIS IRRIGATION WATER TANK -12.55 S.S.L

8.00
CW2 CW2 CW2 CW2
C4

C4

01
C1

STAIR DETAILS
C1

TERMINATED BELOW THE 08 S-406 to 416 C


DOMESTIC
WATER TANK
FIRE FIGHTING
WATER TANK

03 04

ENT 3
ENT 2
8.00

SLOPE 1:10 ENT 2 TO BASEM


C4 C4 C4

BASEM
GROUND FLOOR SLAB
C4

ENT 3 TO
C1
C1

1:10

FROM BASEM
05

SLOPE
02

FROM BASEM
D

13.18 8.95 07 S-209 to 212 CORE WALL DETAILS - 1 to 4 00 PUMP ROOM

RAMP DOWN
RAMP UP
8.00
70.10

70.10
C4 C4

C1
C1
STAIR -1

13.13
E
C6

STAIR -2
SCHEDULE OF
C6

8.00
00
SB1 CW3
CW4

S-404
SB1 SB1

06
01 06
C5

12.20

005
15
SPANDREL BEAMS
C5 C1
C1

006
22
C2

007
C2

8.00
28
C3

004
A-408 ,408A, 408B 00
C3

08
LIFT DETAILS GROUND FLOOR
C1 C3*

05
TOP OF RAFT
G

006
-11.30 S.S.L

23
1700

12.25

10.00
DMD +12.121

GA LAYOUT C4
C4

4.45 4.45 4.45 4.45 04 A-104 GROUND FLOOR PLAN 00 H C6 C6


C6

4.45
C6
C5

4.00
4.45
C5
E=507845.257
N=2794180.473 E=507820.657

T
N=2794143.688

P
4.45
0.77

I M I
3.58 2.81 3.58 3.58

L O T
3.58
I

4.45
3.55 3.57
3.60 3.58
3.58 3.58
0.77 0.77
R O A D 48.77

L
3.58 L OT

007

P
26

T
I M I

L
4.45 4.45 GROUND FLOOR SLAB CONCRETE 01
03 AESF-1315-S-300
4.45 4.45 LAYOUT
3.30 4.45 E=507871.315 GROUND TO FIRST FLOOR GENERAL NOTES :
E=507909.418 .30 PL
OT 02 S-203 01
L IMIT 3 4.45
N=2794095.229
COLUMN SETTING OUT PLAN

N=2794152.239

L I IT
01 S-303 01
OT

GROUND FRAMING PLAN

M
PL

S.S.L -0.15 DRAWING NUMBER DESCRIPTION REV.


00mm Thk. 14 F.F.L + 0.45
S.No:
DROP-5 C6 DMD +23.271
C10* C6 005 (C10* - 650x
650mm) 1000MM WIDE CONCRETE GRADES:
POUR STRIP
(C6 - 600x600mm) UP STAND 250X650
x600mm) UP STAND 250X650
(C7* - 600 (C10* - 650x650mm)
C7*
C7* 0X650 DROP-500mm Thk. C10* S.S.L- 0.15
CONCRETE
GGBS
UP STAND 25 ELEMENTS GRADE CUBIC CEMENT (%)
DROP-500mm Thk. (C6 - 600x600mm)
DROP-5 TYPE
00mm Th F.F.L ±0.00 (C7* - 60
0x600mm (N/mm²)
k. )
S.S.L -0.15 DMD +23.271
Thk. DROP-5
A 27
DROP-70
0mm F.F.L + 0.45
DMD +23.271
S.S.L - 0.15
F.F.L +0.60
00mm Th
k . RAFT FOUNDATIONS fcu 50 OPC 55%
1000MM WIDE
007 COLUMNS & WALLS fcu 70 OPC 55%
CW -1(GROUND TO ROOF DMD +23.271 UP STAN
POUR STRIP

DWG NO:-ABC-1075-SD-S-GA D 250X6


50 WATER TANK fcu 50 OPC 55%
CW1-001 TO 005 REF.RFI.No.20 RETAINING WALLS fcu 50 OPC 55%
F.F.L+ 0.95
10.00

250X650
ABC-1075-RFI-MEP-002-R1
ABC-1075-RFI-MEP-002-R1
OPENING LOCATION AS PER LEGENDS
(SB2)

D
MEP REQUIREMENTS
C13 C13

UP STAN
500 CW1
REF.RFI.No.20 X 970 (C13 - 80 500
ESFB4 500 LIFT-7 LIFT-8
ESFB4 5
00 X 970 0x800mm
) - SLAB
LIFT-6 STAIR-3
)
C4500mm) RFI No.003 0x800mm 24
9 70 (C13 - 80
(C4 - 90
0x 00 X 006
ESFB4 5 (SB2) (SB2) (SB2) ESFB4 5 - RC WALL/COLUMN TERMINATES 05
REVISED AS PER /CONSULTANT
COMMENT AT CLOUD AREA 12/11/2019 JOSE SK PK
00 X 970
C4 AT THE LEVEL 04
REVISED AS PER /CONSULTANT
22/10/2019 JOSE SK PK
COMMENT AT CLOUD AREA
(C4 - 90
B 0x500mm
)
- UP STAND BEAM FOR
03
REVISED AS PER /CONSULTANT
COMMENT AT CLOUD AREA

REVISED AS PER /CONSULTANT


16/09/2019 JOSE SK PK

LANDSCAPING 02 COMMENT AT CLOUD AREA 09/09/2019 JOSE SK PK


(SB2) (SB2) (SB2) (SB2)
S.S.L -0.15 REVISED ASPER IFC/CONSULTANT
0mm Th k. DROP-5 F.F.L + 0.45
01 COMMENT 28/08/2019 JOSE SK PK
DROP-50 00mm T

CW2

CW2

CW2

CW2
C13A 09 h
C13A (C13A - 700x60
k.
DMD +23.271 - POURSTRIP 1 METER 00 ISSUE FOR APPROVAL 15/08/2019 JOSE SK PK
m)
00x600m 004
(C13A - 7 0mm)
WIDE (TYPICAL)
CW2 REV. DESCRIPTION DATE DWN CHKD APD
00mm )
(C1 - 580x5
C1 CW-2(GROUND TO ROOF
C1 CLIENT :
0
300X97 - LEVEL DIFFERENCE
ESFB2 DWG NO:- ABC-1075-SD-S-GA-SC3-007&008
S.S.L+ 0.50 (C1 - 580
x5 00mm)
REF.RFI.No.20 F.F.L + 60 06

C DMD +23.921 003 - COLUMNS/WALLS


1000MM WIDE P.T SLAB 320mm Thk.
RFI No.004
150
POUR STRIP ABC-1075-RFI-MEP-004 R1
- WALL TYPE TAG
(C7 - 70
0x600mm
ESFB2
300X97
0
- END USER :
ESFB1 (600 X 820) (C7 - 700x600mm) ESFB1 (600 X 820) (C7 - 700x600mm) ESFB1 (600 X 820) C7 )
x60 0mm) - GRATING CHANNEL
(C7 - 700
C7 C7 10
C7 500 500
004
)C2 S.S.L+ 0.00 C2 - FLOOR DRAP (FD)
x500mm (C2 - 58
2 - 580 0x500m

)
500

(C F.F.L + 60

50 X 820
m)
DMD +23.421 - SLEEVES
RAMP - 01 PROJECT MANAGEMENT :
820)

11
D P.T SLAB 320mm Thk.

ESFB5 (5
004 REFER TO - SLAB OPENINGS
(550 X

NOTE -06 ABC-1075-


SD-S-GA-RA-001 to 004 ABBREVIATIONS
20
006

ESFB5

% RAMP S
LOPE 8 LOPE 8%
RAMP S
70.10

ABC-1075-RFI-MEP-004 R1 S.S.L - STRUCTURAL SLAB LEVEL

70.10
07
RAMP - 02 C14 003 E
820) S FB3 (40 F.F.L - FINISHED FLOOR LEVEL
REFER TO x500 mm) (400 X 0X820) CONSULTANT :
0mm)
NOTE -06 ABC-1075- (C 5 - 580 ESFB3 (C14 - 90
0x60 S.S.L+ 0.00 C14 (C14 - 90
C5 DMD +23.421
0x600mm
)
SB - SPANDREL BEAM
SD-S-GA-RA-001 to 004

LOPE 8%
CW3 19
P.T SLAB 320mm Thk. C5 (C5 - 580x50
S.S.L+ 0.50 CW4 0mm) SLEEVES LOCATION ,SIZE OF SLEEVES AND SETTING DIMENSION
STAIR-1 006 STAIR-2
F.F.L + 60 REFER THE MEP GROUND FLOOR BUILDERS WORK
E

RAMP S
CW -3(GROUND TO ROOF CW -4(GROUND TO ROOF
OSED
PROP /30) DWG NO:- C10 ESFB8 (600X500) C10 DWG NO:-
DRAWING NO:- ABC/1075/AEC/MEP/SD/BW-004
0
TC1 (3 TC ABC-1075-SD-S-GA-CW3-005
- 1) TO 015 ABC-1075-SD-S-GA-CW4-005 TO 015
13 ( CW4
TION
005
LOCA
CW3 13 MAIN CONTRACTOR :
(C10 - 650x650mm) (C10 - 650x650mm)
005 THIS DRAWING IS FOR GROUND FLOOR GENERAL ARRANGEMENT ONLY -

007
29
(C5* - 600
x600mm) PC1 ALL OTHER G.A & INDIVIDUAL DETAILS REFER TO RESPECTIVE DRAWINGS.
C5* (PC1 - 600x600mm) (PC1 - 600x600mm) 21
PC1 006 C1*
C1* C5*(C (C1* - 580x
50
A I R OL I N K BUILDING CONTRACTING L.L.C
0mm) PO Box: 42649, Dubai, UAE Tel: +971 4 4473448 Fax: +971 4 4473449

004
5* - 600x6

12
00mm) www.airolinkconstruction.com
x500mm)
NOTE:

1
(C1* - 580
006

EMENT
18
002
04

F SUBCONTRACTOR :

TO BAS
1. GROUND G.A REFER TO DRAWING NO:
(C12 - 850x850mm)
LIFT - 01 ABC-1075-SD-S-GA-GR-001 to 003 - REV 0
OOR

C12 C12

ROUND
UND FL

k. (PC1 - 600x600mm)
00mm Th DROP-7
2. GROUND - 3 to ROOF FLOOR CW1 - G.A REFER TO DRAWING NO:
DROP-7 00

:10
PC1 PC1 mm Thk.

FROM G

SLOPE 1
SUBJE
C12* C12* CT TO ABC-1075-SD-S-GA-CW1-001 to 006
O GRO

(C12 - 850x850mm)
(C3 - 850x60 RFI PROJECT NAME :
C3 00mm)
0mm)
(C12* - 700x7 DROP-500mm Thk.
1) DOWN
ENT 1 T

(C3 - 850x6
00mm) (PC1 - 600x600mm) (C12* - 7 3. GROUND FLOOR to ROOF FLOOR CW2 - G.A REFER TO DRAWING NO: MINISTRY OF HUMAN RESOURCES AND
03 00 x700mm C3 02
)
ABC-1075-SD-S-GA-CW2 - 001 to 004
1:10

002
G 002 EMIRATISATION
003
05
ASEM

(RAMP-0
SLOPE

TRENCH AS PER DEWA


US 400 X REQUIREMENT.
400 INV 4. GROUND FLOOR to ROOF FLOOR CW3 - G.A REFER TO DRAWING NO: C
FROM B

1200
X 1200 X X 400 INV
US 400
US
ESFB6

S.S.L+ 0.00 TRENCH ABC-1075-SD-S-GA-CW3-001 to 004


NV

(3 PROJECT DESCRIPTION :
40

00X950)
0I
0X

DMD +23.421
40
12

X
-300X10
02) UP

00X1000
00

3B+G+4 OFFICE BUILDING


US 400

00

P.T SLAB 320mm Thk.


12
X

5. GROUND FLOOR to ROOF CW4 - G.A REFER TO DRAWING NO:


40

0X
0I

00 INV

AT PLOT NO. 2640993,


40

)
00

(450X950
NV
(RAMP-

3
X1

US

A BC-1075-SD-S-GA-CW4-001 to 003
ESFB6 -
200 X 4

17 OPEN MUHAISANAH SECOND, DUBAI.


200 X 4
US 400 X 1200 X 400 INV

OPEN 006
TRENCH
US 400 X 1200 X 400 INV
00 INV

X1

16 6. BASEMENT - 3 to GROUND FLOOR RAMP 01 & 02 - G.A DRAWING TITLE :


US 400

C11 005
01 REFER TO DRAWING NO: ABC-1075-SD-S-GA-RA-001 to 004
002
ESFB7 800X500 C11 (C11 - 800x800mm) 7. REFER TO GROUND FLOOR RMU GA (PART PLAN AND SECTIONS AND DETAILS GROUND FLOOR
(C11 - 800x800mm)
SHT-(01-01)BREV-001 GENERAL ARRANGEMENT PLAN
H 00mm)
C8
00mm)
C9
(C9 - 700x700mm)
C9
(C9 - 700x700mm)
C8 500x300 OPENING
16a
005 (Sht 01 of 07)
(C8 - 700x7 (C8 - 700x7
4.00

E=507845.257
FOR SOIL PIE
(C8 - 700x700m
C8
C8 (C8 - 700
E=507820.657
m) x700mm
N=2794180.473 )
04 ID SUB CONTRACTOR TECH.DEPT. PAPER SIZE : A1
N=2794143.688
I M I T
P

S.S.L+ 0.50 3.58 2.81


0.77 3.58
3.58 3.58
L O T

SUB CONTRACTOR TECH.DEPT.


I S.S.L -0.150
F.F.L + 60
3.58
3.60
3.55
DMD = +23.421 m
3.57
3.58
3.58
03

02 ABC MEP COORDINATOR MEP.DEPT.


DRAWN BY : JOSE
7
0.77 0.7 3.58 P
R O A D 48.77
L
006

CHECKED BY :
25

L
I M I T
L O T SK
006
25

01 ABC TECHNICAL COORDINATOR TECH.DEPT.


RMU ROOM GA AT GROUND FLOOR
DWG NO:-ABC-1075-SD-A-RMU-GF-001(REV-01)
S.NO. REVIEWED BY DEPT. SIGN DATE DRAWING NUMBER : SCALE : REVISION:
ABC-1075-SD-S-GA-GR-001 1:150 05