PAYMENT TERMS
1. 25% Payment for completed design and commencement of construction
2. 65% payment short term certified works.
3. 10% Retention to be paid after 6 month of use of the facility
EVALUATION CRITERIA
Item Description Score
A Mandatory Requirements
TECHNICAL EVALUATION
1. PRESENTATION EVALUATION
Ksh 10M)
More than Ksh 10M – 5 Points
Between 5- 10M - 2 Point
Not provided - 0 points
b) Have completed a minimum of two Projects of similar nature 10
(acoustic design implementation) and complexity in the last two
years, each of which must have done the Architectural acoustic
design and or acoustic design.( attach copy drawing and contact
of the client) be of a value of at least Kshs. 2 million. (Enclose
certificate of completion / Award letters indicating clients’
contacts) of each Project. (Enclose completion certificates and or
letter of award).
2 projects-10 points
1 project- 5 points
c) Provide information on current / on-going work in a table 5
format for similar work previously performed. All current /
ongoing work should be indicated irrespective of whether it is
of similar nature or not. Indicate time frame of the contract.
(Enclose letters of Awards and proof documents