Gambar DED Rumah

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 40

A AR REN ANA

PEKERJAAN :
GAMBAR RENCANAAN REHAB RUMAH TINGGAL TYPE 150

DIRENCANAKAN OLEH :

TAHUN ANGGARAN LOKASI

2023 JAKARTA, INDONESIA


KETERANGAN

11.00

2.90 2.00 2.60 2.00 1.50

GUDANG

1.50
FFL ± 0.00
KM/WC
FFL - 0.05

3.00
TERAS TERAS DAPUR
FFL - 0.10 FFL - 0.05 FFL ± 0.00

3.00
KAMAR TIDUR 2
FFL + 0.05
3.00

1.50
PEKERJAAN
R. KELUARGA KM/WC
FFL ± 0.00 FFL - 0.05 GAMBAR RENCANA
12.00

12.00
TAMAN REHAB RUMAH TINGGAL
FFL - 0.15 TYPE 150
1.20

LOKASI

KAMAR TIDUR 1
FFL + 0.05 JAKARTA, INDONESIA

4.00
OWNER:
2.80

TERAS
FFL - 0.05
CARPORT
FFL - 0.10
Mr. SAFRUL MURDHI

GAZEBO
FFL + 0.50
PERENCANA :
2.00

2.00
TAMAN
FFL - 0.15

2.90 3.00 1.60 3.50


11.00
NAMA GAMBAR SKALA

DENAH EXISTING
TERLAMPIR TERLAMPIR
SKALA 1 : 100

DIGAMBAR DIPERIKSA

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023
11.00
KETERANGAN
4.00 3.50 B 3.50 A

1.50 2.50 3.50 2.00 1.50

9
KM/WC
FFL - 0.05

1.50

1.50
KM/WC KM/WC
TAMAN
FFL - 0.05 FFL - 0.05
FFL - 0.15
8

4.50

3.00

3.00
KAMAR TIDUR 1 KAMAR TIDUR 2
FFL + 0.05 FFL + 0.05

7
1.50

1.50
C R. MAKAN
KM/WC
C
FFL ± 0.00
FFL - 0.05
3.00

DAPUR
6 FFL - 0.05

PEKERJAAN
1.50
14.00

14.00
- 0.15 GAMBAR RENCANA
KAMAR TIDUR UTAMA
- 0.30 FFL + 0.05 REHAB RUMAH TINGGAL
5 TYPE 150

4.00
LOKASI
D D
JAKARTA, INDONESIA
3.30

OWNER:
R. TAMU
FFL + 0.45
4

0.80
6.50

3 CARPORT TAMAN Mr. SAFRUL MURDHI


FFL - 0.10 FFL - 0.15
1.50

1.50
TERAS
FFL + 0.40
PERENCANA :

2
TAMAN FFL - 0.30 GAZEBO
FFL - 0.15 FFL + 0.50
1.70

1.70
FFL + 0.15

FFL ± 0.00
1
1.50 2.50 2.30 1.20 1.50 2.00 NAMA GAMBAR SKALA

4.00 3.50 3.50


TERLAMPIR TERLAMPIR
11.00 B A
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH SUPERIMPOSE NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
ARSITEKTUR
11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 3.50 2.00 1.50

9
KM/WC
FFL - 0.05

1.50

1.50
KM/WC KM/WC
TAMAN
FFL - 0.05 FFL - 0.05
FFL - 0.15
8
R. KELUARGA
4.50 FFL ± 0.00

3.00

3.00
KAMAR TIDUR 1 KAMAR TIDUR 2
FFL + 0.05 FFL + 0.05

7
1.50

1.50
R. MAKAN
KM/WC
FFL ± 0.00
FFL - 0.05
3.00

DAPUR
6 FFL - 0.05
PEKERJAAN
1.50
14.00

14.00
- 0.15 GAMBAR RENCANA
KAMAR TIDUR UTAMA
- 0.30 FFL + 0.05 REHAB RUMAH TINGGAL
5 TYPE 150

4.00
LOKASI

JAKARTA, INDONESIA
3.30

OWNER:
R. TAMU
FFL + 0.45
4

0.80
6.50

3 CARPORT
TAMAN Mr. SAFRUL MURDHI
FFL - 0.10
FFL - 0.15
1.50

1.50
TERAS
FFL + 0.40
PERENCANA :

2
TAMAN FFL - 0.30 GAZEBO
FFL - 0.15 FFL + 0.50
1.70

1.70
FFL + 0.15

FFL ± 0.00
1
1.50 2.50 2.30 1.20 1.50 2.00 NAMA GAMBAR SKALA

4.00 3.50 3.50


TERLAMPIR TERLAMPIR
11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

LAYOUT PLAN NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
11.00

4.00 3.50 3.50


1.50 2.50 3.50 2.00 1.50 KETERANGAN

9
TAMAN

1.50

1.50
FFL - 0.15

4.50

3.00

3.00
7
1.50

1.50
3.00

6
1.50
14.00

14.00
PEKERJAAN
5
GAMBAR RENCANA

4.00
REHAB RUMAH TINGGAL
TYPE 150
LOKASI
3.30

JAKARTA, INDONESIA
4

0.80
OWNER:
6.50

3
TAMAN
FFL - 0.15
1.50

1.50
Mr. SAFRUL MURDHI

2
TAMAN FFL - 0.30 GAZEBO
FFL - 0.15 FFL + 0.50 PERENCANA :
1.70

1.70
FFL + 0.15

FFL ± 0.00
1
FFL - 0.15

FFL - 0.30

1.50 2.50 2.30 1.20 1.50 2.00 NAMA GAMBAR SKALA

4.00 3.50 3.50 TERLAMPIR TERLAMPIR

11.00
DIGAMBAR DIPERIKSA

A B C D E F G MAHBUB HAMIDI, ST

SITE PLAN NO GBR. JLH GBR. TAHUN

SKALA 1 : 100 - - 2023


11.00
KETERANGAN
4.00 3.50 B 3.50 A

1.50 2.50 3.50 2.00 1.50

9
KM/WC
FFL - 0.05 R. KELUARGA

1.50

1.50
FFL ± 0.00
KM/WC KM/WC
TAMAN
FFL - 0.05 FFL - 0.05
FFL - 0.15
8

4.50

3.00

3.00
KAMAR TIDUR 1 KAMAR TIDUR 2
FFL + 0.05 FFL + 0.05

7
1.50

1.50
C R. MAKAN
KM/WC
C
FFL ± 0.00
FFL - 0.05
3.00

DAPUR
6 FFL - 0.05

PEKERJAAN
1.50
14.00

14.00
- 0.15 GAMBAR RENCANA
KAMAR TIDUR UTAMA
- 0.30 FFL + 0.05 REHAB RUMAH TINGGAL
5 TYPE 150

4.00
LOKASI
D D
JAKARTA, INDONESIA
3.30

OWNER:
R. TAMU
FFL + 0.45
4

0.80
6.50

3 CARPORT TAMAN Mr. SAFRUL MURDHI


FFL - 0.10 FFL - 0.15
1.50

1.50
TERAS
FFL + 0.40
PERENCANA :

2
TAMAN FFL - 0.30 GAZEBO
FFL - 0.15 FFL + 0.50
1.70

1.70
FFL + 0.15

FFL ± 0.00
1
1.50 2.50 2.30 1.20 1.50 2.00 NAMA GAMBAR SKALA

4.00 3.50 3.50


TERLAMPIR TERLAMPIR
11.00 B A
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH RENCANA NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
KETERANGAN

+5.15 1.10

+4.05
1.15

+2.90
2.90

±0.00
0.55

-0.55

TAMPAK DEPAN
SKALA 1 : 100
PEKERJAAN

GAMBAR RENCANA
REHAB RUMAH TINGGAL
TYPE 150
LOKASI

+5.15
JAKARTA, INDONESIA
1.10

+4.05 OWNER:

Mr. SAFRUL MURDHI


4.05

PERENCANA :

±0.00
0.55

-0.55
NAMA GAMBAR SKALA

TAMPAK SAMPING KANAN


TERLAMPIR TERLAMPIR
SKALA 1 : 100

DIGAMBAR DIPERIKSA

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023
KETERANGAN

+5.15 1.10

+4.05
4.05

±0.00
0.55

-0.55

TAMPAK SAMPING KIRI


SKALA 1 : 100
PEKERJAAN

GAMBAR RENCANA
REHAB RUMAH TINGGAL
TYPE 150
LOKASI

+5.15
JAKARTA, INDONESIA
1.10

+4.05 OWNER:

Mr. SAFRUL MURDHI


4.05

PERENCANA :

±0.00
0.55

-0.55
NAMA GAMBAR SKALA

TAMPAK BELAKANG
TERLAMPIR TERLAMPIR
SKALA 1 : 100

DIGAMBAR DIPERIKSA

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023
Atap Seng Spandek KETERANGAN
0.50 Reng C.45
0.400.60 0.60 8.90 Rangka Kuda-kuda C.75
+5.15 0.60 0.60 0.60
0.60 0.60 0.60
0.60 0.60 0.60
0.60 0.60 0.60

1.10

0.85 0.50 1.10


ATAP DAK
+4.05 + 4.05
CANOPY ACRILIC
ATAP DAK
+ 3.50
PLAFOND PLAFOND + 3.50

1.35
+ 3.70 PLAFOND + 3.70
+ 3.50

+2.70

5.70
2.70

2.70
GRANIT DINDING GRANIT DINDING
60X60 60X60

KAMAR TIDUR UTAMA KAMAR TIDUR 2


KM/WC KM/WC
±0.00 TAMAN FFL + 0.05
FFL - 0.05
FFL + 0.05
FFL - 0.05
FFL - 0.15
0.55

0.55
-0.55

4.00 4.00 1.50 3.00 1.50

14.00
PEKERJAAN
POTONGAN A-A GAMBAR RENCANA
SKALA 1 : 100 REHAB RUMAH TINGGAL
TYPE 150
LOKASI

0.60 0.60 0.60 9.70


+5.15 0.60 0.60 0.60 JAKARTA, INDONESIA
0. 60 0.60 0.60 0.
60 0.60 0.60 0.
60 0.60 0.60 0.
1.10

0.65 0.50 1.10


60
ATAP DAK OWNER:
+4.05 + 4.05
CANOPY ACRILIC
0.70

ATAP DAK
+ 3.50
PLAFOND PLAFOND + 3.50
+3.35 + 3.70 + 3.70
Mr. SAFRUL MURDHI

5.70
PERENCANA :
3.35

2.90
TERAS RUANG TAMU
FFL + 0.40 FFL + 0.45
+ 0.30 + 0.30 R. MAKAN R. KELUARGA
+ 0.15 + 0.15
±0.00 ± 0.00
FFL ± 0.00 FFL ± 0.00
0.55

0.55
- 0.15
- 0.30
-0.55 - 0.55
NAMA GAMBAR SKALA

TERLAMPIR TERLAMPIR
1.30 1.70 1.50 3.30 3.00 1.50
3.00
14.00 DIGAMBAR DIPERIKSA

POTONGAN B-B MAHBUB HAMIDI, ST

SKALA 1 : 100 NO GBR. JLH GBR. TAHUN

- - 2023
4.00 5.00 2.00
1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 KETERANGAN

+5.15

1.10
+4.05

1.02
PLAFOND PLAFOND
+ 3.70 + 3.70 PLAFOND
+2.90 + 3.50

3.03 DAPUR R. KELUARGA KM/WC


±0.00 FFL - 0.05 FFL ± 0.00 FFL - 0.05
0.55

-0.55

5.00 2.00
4.00
11.00
PEKERJAAN
POTONGAN C-C GAMBAR RENCANA
SKALA 1 : 100 REHAB RUMAH TINGGAL
TYPE 150
4.00 3.50 3.50 LOKASI

0.82 1.20 1.20 1.20 1.20 1.20


JAKARTA, INDONESIA
+5.15
OWNER:
1.10

+4.05
CANOPY ACRILIC
1.02

+ 3.50 PLAFOND PLAFOND Mr. SAFRUL MURDHI


+ 3.70 + 3.70
+3.03

PERENCANA :
3.03

RUANG TAMU
FFL + 0.45
KAMAR TIDUR UTAMA
CARPORT
±0.00 FFL + 0.05
FFL - 0.05
0.55

NAMA GAMBAR SKALA


-0.55
TERLAMPIR TERLAMPIR

3.50 3.50
4.00 DIGAMBAR DIPERIKSA

11.00
MAHBUB HAMIDI, ST

POTONGAN D-D NO GBR. JLH GBR. TAHUN

SKALA 1 : 100 - - 2023


11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 3.50 2.00 1.50

1.50

1.50
GRANIT GRANIT GRANIT
60X60 UNPOLISH 60X60 UNPOLISH 60X60 UNPOLISH
FFL - 0.05 TAMAN FFL - 0.05 FFL - 0.05
FFL - 0.15
8

4.50
GRANIT
60X60 POLISH
FFL ± 0.00

3.00

3.00
GRANIT GRANIT
60X60 POLISH 60X60 POLISH
FFL + 0.05 FFL + 0.05

7
GRANIT GRANIT
1.50

1.50
60X60 POLISH 60X60 UNPOLISH
FFL ± 0.00 FFL - 0.05
GRANIT
3.00

60X60 POLISH
6 FFL - 0.05

PEKERJAAN
1.50
14.00

14.00
- 0.15 GAMBAR RENCANA
- 0.30 REHAB RUMAH TINGGAL
5 GRANIT
TYPE 150
60X60 POLISH

4.00
FFL + 0.05 LOKASI

GRANIT JAKARTA, INDONESIA


3.30

60X60 POLISH
FFL + 0.45
OWNER:

0.80
6.50

3
GRANIT
60X60 UNPOLISH TAMAN Mr. SAFRUL MURDHI
FFL - 0.10 FFL - 0.15
GRANIT
1.50

1.50
60X60 POLISH
FFL + 0.40
PERENCANA :

2
TAMAN FFL - 0.30 GAZEBO
FFL - 0.15 FFL + 0.50
1.70

1.70
FFL + 0.15

FFL ± 0.00
1
1.50 2.50 2.30 1.20 1.50 2.00 NAMA GAMBAR SKALA

4.00 3.50 3.50


TERLAMPIR TERLAMPIR
11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH POLA LANTAI NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 3.50 2.00 1.50

1.50

1.50
PLAFOND GRC PLAFOND GRC PLAFOND GRC PLAFOND GRC
CH + 3.50 CH + 3.50 CH + 3.50 CH + 3.50
TAMAN
FFL - 0.15
8

4.50

3.00

3.00
PLAFOND PLAFOND PLAFOND
GYPSUM GYPSUM GYPSUM
FFL + 3.70 FFL + 3.70 FFL + 3.70

7
PLAFOND PLAFOND GRC
1.50

1.50
GYPSUM CH + 3.50
FFL + 3.70
PLAFOND
GYPSUM
3.00

6 FFL + 3.70

PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
REHAB RUMAH TINGGAL
5 PLAFOND
TYPE 150
GYPSUM

4.00
FFL + 3.70 LOKASI

JAKARTA, INDONESIA
PLAFOND
3.30

GYPSUM
FFL + 3.70 OWNER:

0.80
6.50

ATAP
3 SKYLIGH RANGKA HOLLOW TAMAN Mr. SAFRUL MURDHI
FFL + 3.50 FFL - 0.15
1.50

1.50
TERAS
FFL + 0.40
PERENCANA :

2
TAMAN FFL - 0.30 GAZEBO
FFL - 0.15 FFL + 0.50
1.70

1.70
FFL + 0.15

FFL ± 0.00
1
1.50 2.50 2.30 1.20 1.50 2.00 NAMA GAMBAR SKALA

4.00 3.50 3.50


TERLAMPIR TERLAMPIR
11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH POLA PLAFOND NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
Rangka Kuda-kuda
Baja Ringan C Truss 100mm KETERANGAN
K3 K3 K3 K3 K2 K2 K2 K1 K1 K1
1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
Gording Baja Ringan C Truss
30x40x40x15mm
9
ATAP ATAP ATAP
DAK BETON DAK BETON DAK BETON

1.50

1.50
FFL + 3.50 FFL + 3.50 FFL + 3.50

4.50

3.00

3.00
7
1.50

1.50
3.00

6
PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
REHAB RUMAH TINGGAL
5 TYPE 150

4.00
LOKASI

JAKARTA, INDONESIA
3.30

OWNER:

0.80
6.50

ATAP
3 SKYLIGH RANGKA HOLLOW Mr. SAFRUL MURDHI
FFL + 3.50
ATAP
1.50

1.50
DAK BETON
FFL + 4.00
PERENCANA :

2
1.70

1.70
1
1.50 2.50 2.30 1.20 1.50 2.00 NAMA GAMBAR SKALA

4.00 3.50 3.50


TERLAMPIR TERLAMPIR
11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH RANGKA ATAP NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 3.50 2.00 1.50

1.50

1.50
J4
P3
8
P3 J2 P3
4.50

3.00

3.00
P2
7
P2
1.50

1.50
P2
3.00

6
P3 PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
REHAB RUMAH TINGGAL
5 TYPE 150

4.00
J2 P1 LOKASI

J3 JAKARTA, INDONESIA
3.30

J3
OWNER:

4 J3

0.80
J5 J5
6.50

3 Mr. SAFRUL MURDHI

J3 PJ1 J3
1.50

1.50
PERENCANA :

2
1.70

1.70
1
1.50 2.50 2.30 1.20 1.50 2.00 NAMA GAMBAR SKALA

4.00 3.50 3.50


TERLAMPIR TERLAMPIR
11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH RENCANA KUSEN NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
0.05 0.05
KETERANGAN

kaca 5 mm kaca 5 mm 0.31 0.40 kaca 5 mm 0.31 0.40

0.04 0.04
0.10 0.10

2.90 2.90
kaca 5 mm

kaca 5 mm

kaca 5 mm
2.30 2.50 2.30 2.50 PEKERJAAN

GAMBAR RENCANA
RUMAH TINGGAL
TYPE 150
LOKASI

JAKARTA, INDONESIA

OWNER:

Mr. SAFRUL MURDHI

PERENCANA :

0.10 0.10

0.04 0.70 0.70 0.04 0.04 0.90 0.04


NAMA GAMBAR SKALA
0.40 0.20 0.100.10 0.20 0.40 0.10 0.20 0.60
TERLAMPIR TERLAMPIR
0.13 0.13
DIGAMBAR TANDA TANGAN
0.05 0.69 0.69 0.05 0.05 0.88 0.05
MAHBUB HAMIDI, ST

DETAIL - PJ1 (1 UNIT) DETAIL - P1 (1 UNIT) NO GBR. JLH GBR. TAHUN


SKALA 1 : 20 SKALA 1 : 20
- - 2023
0.05
KETERANGAN

kaca 5 mm 0.31 0.40

0.04 0.04
0.10 0.10

2.90
kaca 5 mm

2.30 2.50 2.30 2.50 PEKERJAAN

GAMBAR RENCANA
RUMAH TINGGAL
TYPE 150
LOKASI

JAKARTA, INDONESIA

OWNER:

Mr. SAFRUL MURDHI

PERENCANA :

0.10 0.10

0.04 0.80 0.04 0.04 0.70 0.04


NAMA GAMBAR SKALA
0.10 0.20 0.50 0.10 0.50 0.10
TERLAMPIR TERLAMPIR
0.13 0.13
DIGAMBAR TANDA TANGAN
0.05 0.78 0.05 0.05 0.68 0.05
MAHBUB HAMIDI, ST

DETAIL - P2 (3 UNIT) NO GBR. JLH GBR. TAHUN


SKALA 1 : 20 DETAIL - P3 (4 UNIT)
- - 2023
SKALA 1 : 20
KETERANGAN

0.05 0.05

0.31 0.40 kaca 5 mm 0.31 0.40

0.04 0.04
0.07 0.07

2.10

2.40 1.52 1.66


kaca 5 mm kaca 5 mm
PEKERJAAN

1.82 1.96 GAMBAR RENCANA


RUMAH TINGGAL
TYPE 150
LOKASI

JAKARTA, INDONESIA

OWNER:

0.07
0.04 0.04 Mr. SAFRUL MURDHI

0.13
0.07 PERENCANA :
0.04 0.04
0.07 0.36 0.07 0.07 0.36 0.07
0.05 0.05 0.05
0.13 0.50 0.50
DETAIL - J2 (1 UNIT)
0.07 0.26 0.07
SKALA 1 : 20
0.05 0.05 NAMA GAMBAR SKALA

0.40
TERLAMPIR TERLAMPIR

DETAIL - J3 (5 UNIT)
SKALA 1 : 20 DIGAMBAR TANDA TANGAN

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023
0.05
0.05
KETERANGAN

kaca 5 mm kaca 5 mm 0.31 0.40

0.04 kaca 5 mm 0.80 0.90


0.07

0.05
0.10
0.05

kaca 5 mm 0.31 0.40

0.04
0.07
2.90
kaca
kaca 5 mm 2.31 2.45 PEKERJAAN
5 mm
GAMBAR RENCANA
RUMAH TINGGAL
TYPE 150
LOKASI

JAKARTA, INDONESIA
2.40
OWNER:

kaca 5 mm 1.89 1.96


Mr. SAFRUL MURDHI

PERENCANA :

0.07
0.05 0.05

0.13
NAMA GAMBAR SKALA

0.07 0.72 0.07 0.27 0.07 TERLAMPIR TERLAMPIR


0.05 0.07 0.05 0.04 0.04
0.86 0.40 DIGAMBAR TANDA TANGAN

DETAIL - J4 (1 UNIT) MAHBUB HAMIDI, ST

SKALA 1 : 20 DETAIL - J5 (2 UNIT)


NO GBR. JLH GBR. TAHUN
0.07 0.36 0.07 SKALA 1 : 20
0.05 0.50 0.05 - - 2023
STRUKTUR
11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 3.50 2.00 1.50

9
2

1.50

1.50
KM/WC TAMAN KM/WC KM/WC
FFL ± 0.00
FFL - 0.05 FFL - 0.15 FFL - 0.05 FFL - 0.05

8
4.50

3.00

3.00
KAMAR TIDUR 1 R. KELUARGA KAMAR TIDUR 2
FFL + 0.05 FFL ± 0.00 FFL + 0.05

3
7
1.50

1.50
KM/WC
R. MAKAN FFL - 0.05
FFL ± 0.00
3.00

DAPUR
6 FFL - 0.05
PEKERJAAN
1.50
14.00

14.00
1 - 0.15
GAMBAR RENCANA
- 0.30 REHAB RUMAH TINGGAL
5 KAMAR TIDUR UTAMA TYPE 150

4.00
FFL + 0.05 LOKASI

JAKARTA, INDONESIA
3.30

R. TAMU
FFL + 0.45
OWNER:

0.80
6.50

3 CARPORT Mr. SAFRUL MURDHI


FFL - 0.10
1.50

1.50
TERAS
FFL + 0.40 TAMAN
FFL - 0.15 PERENCANA :

2
FFL - 0.30
1.70

1.70
TAMAN
FFL - 0.15 FFL + 0.15

FFL ± 0.00
1
NAMA GAMBAR SKALA
1.50 2.50 2.30 1.20 1.50 2.00
4.00 3.50 3.50 TERLAMPIR TERLAMPIR

11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH PONDASI NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
KETERANGAN

Lantai Granite/ Marmer


0.13 Spesi 1 : 4
0.02 +0.45 Beton Rabat 1:3:5
0.03 Pasir Urug T=10 CM
0.07
Tanah Timbun
0.10

±0.00 0.02
1.00 0.03
0.07 PEKERJAAN

0.78 0.10 GAMBAR RENCANA


15 RUMAH TINGGAL
1.50 20 0.55 TYPE 150
LOKASI
0.33

1.05 JAKARTA, INDONESIA

OWNER:
Angkur Ø10
0.30 0.30
0.50 Pas Batu Gunung 0.50
Mr. SAFRUL MURDHI
0.15 Pas Batu Kosong 0.15
0.05 Pasir Urug 0.05
PERENCANA :
0.15
0.20
0.40
DETAIL PONDASI-1
SKALA 1 : 20
NAMA GAMBAR SKALA

TERLAMPIR TERLAMPIR

DIGAMBAR TANDA TANGAN

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023
KETERANGAN

0.13 Lantai Granite/ Marmer


Spesi 1 : 4
Beton Rabat 1:3:5
Pasir Urug T=10 CM
Tanah Timbun

0.02 ±0.00
0.03 -0.05 0.02
0.07 0.03 PEKERJAAN
0.07 GAMBAR RENCANA
0.10
15 0.10 RUMAH TINGGAL
0.55 20 0.50 TYPE 150
LOKASI
0.33 0.28
1.05 JAKARTA, INDONESIA
1.00
OWNER:
Angkur Ø10
0.30 0.35
0.50 Pas Batu Gunung 0.50
Mr. SAFRUL MURDHI
0.15 Pas Batu Kosong
0.10
0.05 Pasir Urug 0.05
PERENCANA :
0.15
0.20
0.40
DETAIL PONDASI-2
SKALA 1 : 20
NAMA GAMBAR SKALA

TERLAMPIR TERLAMPIR

DIGAMBAR TANDA TANGAN

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023
KETERANGAN

Lantai Granite/ Marmer


Spesi 1 : 4
0.13
Beton Rabat 1:3:5
Pasir Urug T=10 CM
Tanah Timbun

+0.05 0.02
0.02 -0.05 0.03
0.07
0.03 0.10
PEKERJAAN
0.07 GAMBAR RENCANA
0.10 15 RUMAH TINGGAL
0.60
0.50 20 TYPE 150
0.38 LOKASI
0.28
1.10 JAKARTA, INDONESIA
1.00
OWNER:
Angkur Ø10
0.30 0.35
0.50 Pas Batu Gunung 0.50
Mr. SAFRUL MURDHI
0.15 Pas Batu Kosong
0.10
0.05 Pasir Urug 0.05
PERENCANA :
0.15
0.20
0.40
DETAIL PONDASI-3
SKALA 1 : 20
NAMA GAMBAR SKALA

TERLAMPIR TERLAMPIR

DIGAMBAR TANDA TANGAN

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023
11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 3.50 2.00 1.50

KP KP KP KP KP KP
9

1.50

1.50
KP KP KP KP KP KP
8

4.50

3.00

3.00
KP KP KP KP KP
7
1.50

1.50
KP KP KP
3.00

6 KP
PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
KP KP KP REHAB RUMAH TINGGAL
5 TYPE 150

4.00
LOKASI

JAKARTA, INDONESIA
3.30

OWNER:

KP KP KP
4

0.80
KP
KP KP KP
6.50

3 Mr. SAFRUL MURDHI


1.50

1.50
PERENCANA :
KPKPKPKP KP
2
1.70

1.70
K1 K1 K1 K1 K1
1
NAMA GAMBAR SKALA
1.50 2.50 2.30 1.20 1.50 2.00
4.00 3.50 3.50 TERLAMPIR TERLAMPIR

11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH KOLOM NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 3.50 2.00 1.50

9
SL 15/20 SL 15/20 SL 15/20 SL 15/20 SL 15/20

SL 15/20

SL 15/20

SL 15/20
SL 15/20

SL 15/20

SL 15/20
1.50

1.50
8
SL 15/20 SL 15/20 SL 15/20 SL 15/20 SL 15/20

4.50

SL 15/20

SL 15/20

SL 15/20

SL 15/20
3.00

3.00
7
SL 15/20 SL 15/20 SL 15/20

SL 15/20

SL 15/20
1.50

1.50
SL 15/20
3.00

6
SL 15/20 SL 15/20

SL 15/20

SL 15/20
PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
REHAB RUMAH TINGGAL
5

SL 15/20
SL 15/20 SL 15/20 TYPE 150

4.00
LOKASI

SL 15/20
JAKARTA, INDONESIA
SL 15/20

SL 15/20
3.30

OWNER:

4
SL 15/20 SL 15/20

0.80
6.50

3 Mr. SAFRUL MURDHI


SL 15/20
SL 15/20

SL 15/20

SL 15/20
1.50

1.50
SL 15/20
PERENCANA :

2
SL 15/20
SL 15/20
SL 15/20
1.70

1.70
SL 15/20 SL 15/20 SL 15/20
1
NAMA GAMBAR SKALA
1.50 2.50 2.30 1.20 1.50 2.00
4.00 3.50 3.50 TERLAMPIR TERLAMPIR

11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH SLOOF NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 0.00 2.00 2.00 1.50

BL 13/13

BL 13/13

BL 13/13

BL 13/13
1.50

1.50
8
BL 13/13 BL 13/13 BL 13/13 BL 13/13

4.50

BL 13/13

BL 13/13
3.00

3.00
7
BL 13/13

BL 13/13
1.50

1.50
3.00

6
BL 13/13 BL 13/13
PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
REHAB RUMAH TINGGAL
5 TYPE 150
BL 13/13

4.00
LOKASI

BL 13/13
JAKARTA, INDONESIA
3.30

OWNER:

4
BL 13/13

0.80
6.50

3 Mr. SAFRUL MURDHI


BL 13/13
1.50

1.50
PERENCANA :

2
1.70

1.70
1
NAMA GAMBAR SKALA
1.50 2.50 2.30 1.20 1.50 2.00
4.00 3.50 3.50 TERLAMPIR TERLAMPIR

11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH BALOK LATEI NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 3.50 2.00 1.50

9
RB 13/13 RB 13/13 RB 13/13 RB 13/13 RB 13/13

1.50

1.50
ATAP ATAP ATAP

15/20
15/20
DAK BETON DAK BETON DAK BETON
FFL + 3.50 FFL + 3.50 FFL + 3.50

8
RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20

4.50

RB 15/20

RB 15/20

RB 15/20

RB 15/20
3.00

3.00
7
RB 15/20 RB 15/20 RB 15/20

RB 15/20

RB 15/20
1.50

1.50
RB 15/20
3.00

6
RB 15/20 RB 15/20

RB 15/20

RB 15/20
PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
REHAB RUMAH TINGGAL
5

RB 15/20
RB 15/20 RB 15/20 TYPE 150

4.00
LOKASI

RB 15/20
JAKARTA, INDONESIA
RB 15/20
3.30

OWNER:

4
RB 15/20 RB 15/20

0.80
ATAP
6.50

3 SKYLIGH RANGKA HOLLOW Mr. SAFRUL MURDHI


FFL + 3.50
RB 15/20
RB 15/20

RB 15/20
1.50

1.50
PERENCANA :

2
RB 15/20
1.70

1.70
1
NAMA GAMBAR SKALA
1.50 2.50 2.30 1.20 1.50 2.00
4.00 3.50 3.50 TERLAMPIR TERLAMPIR

11.00
DIGAMBAR DIPERIKSA
A B C D E F G H
MAHBUB HAMIDI, ST

DENAH RING BALOK ELV. +4.05 NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 3.50 2.00 1.50

9
RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20

1.50

1.50
15/20

15/20

15/20

15/20

15/20
15/20
8
RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20

4.50

3.00

3.00
7
1.50

1.50
3.00

6
PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
REHAB RUMAH TINGGAL
5 TYPE 150

4.00
LOKASI

JAKARTA, INDONESIA
RB 15/20
3.30

OWNER:

0.80
ATAP
6.50

3 SKYLIGH RANGKA HOLLOW Mr. SAFRUL MURDHI


FFL + 3.50
1.50

1.50
RB 15/20

RB 15/20
PERENCANA :

2
1.70

1.70
1
NAMA GAMBAR SKALA
1.50 2.50 2.30 1.20 1.50 2.00
4.00 3.50 3.50 TERLAMPIR TERLAMPIR

11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH RING BALOK ELV. +3.50 NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
11.00
KETERANGAN
4.00 3.50 3.50
1.50 0.30 1.91 0.30 3.50 2.00 1.50

0.30 1.20
ATAP ATAP ATAP

1.50

1.50
DAK BETON DAK BETON DAK BETON
FFL + 3.50 FFL + 3.50 FFL + 3.50

4.50

3.00

3.00
7
1.50

1.50
3.00

6
PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
REHAB RUMAH TINGGAL
5 TYPE 150

4.00
LOKASI

JAKARTA, INDONESIA
3.30

OWNER:

4 ATAP

0.80
DAK BETON
FFL + 5.15
6.50

ATAP
3 SKYLIGH RANGKA HOLLOW Mr. SAFRUL MURDHI
FFL + 3.50
ATAP
1.50

1.50
DAK BETON
FFL + 4.00
PERENCANA :

2
1.70

1.70
1
NAMA GAMBAR SKALA
1.50 2.50 2.30 1.20 1.50 2.00
4.00 3.50 3.50 TERLAMPIR TERLAMPIR

11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH PLAT DAK BETON NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
11.00
KETERANGAN
4.00 3.50 3.50
1.50 0.30 1.90 0.30 3.50 2.00 1.50

0.30 1.20
ATAP ATAP ATAP

1.50

1.50
DAK BETON DAK BETON DAK BETON
FFL + 3.50 FFL + 3.50 FFL + 3.50

8
RB 13/13 RB 13/13 RB 13/13 RB 13/13 RB 13/13 RB 13/13

4.50

RB 13/13

RB 13/13
3.00

3.00
7

RB 13/13
1.50

1.50
RB 13/13
3.00

6
PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
RB 13/13 REHAB RUMAH TINGGAL
5

RB 13/13
TYPE 150

4.00
LOKASI

RB 13/13
JAKARTA, INDONESIA
3.30

OWNER:
RB 13/13
4

0.80
ATAP DAK BETON
FFL + 5.15
ATAP RB 13/13
6.50

3 SKYLIGH RANGKA HOLLOW Mr. SAFRUL MURDHI


FFL + 3.50
ATAP
1.50

1.50
DAK BETON
FFL + 4.00
PERENCANA :

2
1.70

1.70
1
NAMA GAMBAR SKALA
1.50 2.50 2.30 1.20 1.50 2.00
4.00 3.50 3.50 TERLAMPIR TERLAMPIR

11.00
DIGAMBAR DIPERIKSA
A B C D E F G
MAHBUB HAMIDI, ST

DENAH RING BALOK ELV. +5.15 NO GBR. JLH GBR. TAHUN


SKALA 1 : 100
- - 2023
KETERANGAN

2 Ø 12

2 Ø 12

2 Ø 12 2 Ø 10
3 Ø 12
40
Ø 8-150 13 Ø 6-150
Ø 8-150
20
2 Ø 12 2 Ø 12 2 Ø 10
13
DETAIL KOLOM 13/13 (PRAKTIS)
3 Ø 12 2 Ø 12 SKALA 1 : 10

20 15

DETAIL KOLOM K1 20/20 DETAIL KOLOM K2 15/40


SKALA 1 : 10 SKALA 1 : 10

PEKERJAAN

GAMBAR RENCANA
REHAB RUMAH TINGGAL
TYPE 150
LOKASI
2 Ø 12 2 Ø 12 2 Ø 10 2 Ø 10 2 Ø 12 2 Ø 12

2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 JAKARTA, INDONESIA
13 Ø 7-150 13 Ø 7-200
20 20 20 20
OWNER:
Ø 8-100 Ø 8-150 2 Ø 10 2 Ø 10 Ø 8-100 Ø 8-150
13 13
2 Ø 12 2 Ø 12 TUMPUAN LAPANGAN 2 Ø 12 2 Ø 12
15 15 15 15 Mr. SAFRUL MURDHI
DETAIL BALOK LATEI (PINGGANG) 13/13
SKALA 1 : 10
TUMPUAN LAPANGAN TUMPUAN LAPANGAN
DETAIL SLOOF 15/20 DETAIL RING BALOK 15/20
SKALA 1 : 10 SKALA 1 : 10

PERENCANA :

2 Ø 10 2 Ø 10

13 Ø 7-150 13 Ø 7-200 NAMA GAMBAR SKALA

TERLAMPIR TERLAMPIR
2 Ø 10 2 Ø 10
13 13
DIGAMBAR DIPERIKSA
TUMPUAN LAPANGAN
MAHBUB HAMIDI, ST
DETAIL RING BALOK 13/13
SKALA 1 : 10
NO GBR. JLH GBR. TAHUN

- - 2023
MEKANIKAL
& ELEKTRIKAL
11.00
KETERANGAN
4.00 3.50 3.50
1.50 2.50 3.50 2.00 1.50

9
1.50

1.50
8
4.50

3.00

3.00
7
1.50

1.50
3.00

6
PEKERJAAN
1.50
14.00

14.00
GAMBAR RENCANA
REHAB RUMAH TINGGAL
5 TYPE 150

4.00
LOKASI

JAKARTA, INDONESIA
3.30

OWNER:

0.80
6.50

3 Mr. SAFRUL MURDHI


1.50

1.50
PERENCANA :

2 Ampere Meter 1 Set

Lampu Downlight LED 40 Watt 12 Buah


1.70

1.70

Lampu Downlight LED 18 Watt 14 Buah


1
Lampu Downlight LED 8 Watt 17 Buah
1.50 2.50 2.30 1.20 1.50 2.00 NAMA GAMBAR SKALA
Saklar Single 4 Buah
4.00 3.50 3.50
TERLAMPIR TERLAMPIR
11.00 Saklar Ganda / Double 6 Buah
DIGAMBAR DIPERIKSA
Stop Kontak 10 Buah
A B C D E F G
MAHBUB HAMIDI, ST

DENAH ELEKTRIKAL Kabel Instalasi Listrik


NO GBR. JLH GBR. TAHUN
SKALA 1 : 100
- - 2023
KETERANGAN

FD KR KR
CL
FD CL
TAMAN CL
KM/WC FFL - 0.15 KM/WC KM/WC
KR FFL - 0.05 FFL - 0.05
FFL - 0.05 FD
FD

R. KELUARGA
KAMAR TIDUR 1 FFL ± 0.00 KAMAR TIDUR 2
FFL + 0.05 FFL + 0.05

KR

CL
KM/WC
FDFFL - 0.05
DAPUR
FFL - 0.05
R. MAKAN PEKERJAAN
FFL ± 0.00
- 0.15 GAMBAR RENCANA
KAMAR TIDUR UTAMA
- 0.30 FFL + 0.05 REHAB RUMAH TINGGAL
TYPE 150
LOKASI

R. TAMU
JAKARTA, INDONESIA
FFL + 0.45
OWNER:

CARPORT
Mr. SAFRUL MURDHI
FFL - 0.10

TERAS SEPTICTANK
FFL + 0.40 EXSITING
PERENCANA :

TAMAN
TAMAN FFL - 0.30 FFL - 0.15
FFL - 0.15

FFL + 0.15

FFL ± 0.00 KR

KR KRAN AIR 5 Buah


NAMA GAMBAR SKALA
DENAH SANITASI CL CLOSET DUDUK 4 Buah
SKALA 1 : 100 TERLAMPIR TERLAMPIR

FD FLOOR DRAIN 4 Buah


DIGAMBAR DIPERIKSA
WS-1 WASTAFEL KERAMIK 1 Buah
MAHBUB HAMIDI, ST

WS-2 ZINK WASTAFEL 1 Buah


NO GBR. JLH GBR. TAHUN

- - 2023
VIEW 3 D
KETERANGAN

PEKERJAAN

GAMBAR RENCANA
REHAB RUMAH TINGGAL
TYPE 150
LOKASI

JAKARTA, INDONESIA

OWNER:

Mr. SAFRUL MURDHI

PERENCANA :

NAMA GAMBAR SKALA

TERLAMPIR TERLAMPIR

DIGAMBAR DIPERIKSA

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023
KETERANGAN

PEKERJAAN

GAMBAR RENCANA
REHAB RUMAH TINGGAL
TYPE 150
LOKASI

JAKARTA, INDONESIA

OWNER:

Mr. SAFRUL MURDHI

PERENCANA :

NAMA GAMBAR SKALA

TERLAMPIR TERLAMPIR

DIGAMBAR DIPERIKSA

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023
KETERANGAN

PEKERJAAN

GAMBAR RENCANA
REHAB RUMAH TINGGAL
TYPE 150
LOKASI

JAKARTA, INDONESIA

OWNER:

Mr. SAFRUL MURDHI

PERENCANA :

NAMA GAMBAR SKALA

TERLAMPIR TERLAMPIR

DIGAMBAR DIPERIKSA

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023
KETERANGAN

PEKERJAAN

GAMBAR RENCANA
REHAB RUMAH TINGGAL
TYPE 150
LOKASI

JAKARTA, INDONESIA

OWNER:

Mr. SAFRUL MURDHI

PERENCANA :

NAMA GAMBAR SKALA

TERLAMPIR TERLAMPIR

DIGAMBAR DIPERIKSA

MAHBUB HAMIDI, ST

NO GBR. JLH GBR. TAHUN

- - 2023

You might also like