Notes

Al-Hafiz Tech integrates technology with a solar grid system that results in a clean, high
quality and cheaper source of energy. It will save 80% of utility Bills expenses.
1. Shadow clearance (summers: 09:00AM - 04:50PM, Winters: 10:00AM - 02:45PM).
2. Orientation: Degree 90 SW.
3. Tilt: 12 – 15 Degrees.
4. System

Al-Hafiz Tech (Pvt Ltd.)


8 K-565,
PVCZafar-Ul-Haq
Fittings andRoad,
Accessories
Committee Chowk, 1
ESTIMATE
Job Including
PVC Piping, PVC Duct, MC4 Connectors, Tape, Cable
Rawalpindi, Punjab, Pakistan #EST- 00509
Ties and other Supporting Items
Estimate Date: 28 JAN 2024
#
9 Item
DC/ AC& Description
Earthing & Grounding Qty
1 Unit
Job Remarks
Including
Bill To
DC Earthing with Material (Earthing cable- Fast Cable Reference#: 00509
1 Mr.Supply,
Advocate
or Installation,
equivalent Mashood Testing
(1C- 4mm Sb & 16mm)
Rwp.
& 1C- Commissioning of Solar 18 Nos Including
Panel Mono-PERC
AC Earthing with Material (Earthing cable- Fast Cable
Make JA, Jinko, Canadian, Longi 575W or higher watt
or equivalent (1C- 6Sqmm & 1C-25)
Solar Panel (Note Since different brands have different
10 prices, so cost
Lightning comparison shall be unfair if we
Protection 1 No Including
mention different choices and
Copper Lightning Arrestor withevery oneCopper
1 Meter shall select
Rod
least cost
and Base item).
Mounting System with 10 years warranty against rust
2
11 Labor and Transportation 1
1 Job Including
Including
and any defect including stability and damage due
routine winds in the area
Total 13,31,800.00
3 Grid Tie inverter, 10KW 1 Nos Including
10KW On-Grid Inverter, Make by Growatt or
Equivalent Three Phase, Wi Fi for online monitoring,
conversion efficiency up to 98.7%, efficiency 99.5%, UL
1741 Certified or equivalent min IP 66 qualified,
compatible with local grid conditions

4 Pads for mounting structure Job 1 Including

AC Cable
5 1 1 Including
4mmsq 1C Cu/PVC/PVC, AC Cable ( To be assessed at
site and charged accordingly) Estimated 15Mtr
DC Cable
4mmsq SC Tin Cu/XLPE/EVA/EVA 1000V,DC Cable (Red)
( To be assessed at site and charged accordingly)
Estimated 90Mtr

6 Earthing Cables DC 90 Mtrs Including


4mmsq SC Cu/PVC 450/750V, DC Flexible Earthing
Cable

AC Breaker 1 No Including
3 Pole 16A, 440VAc, AC Breaker(DC) Schneider/chint
Equivalent with its Cable (DC) Pakistan
cables/Equivalent at Losses less than 1%
DC Breaker
1 Pole 32A, 1000V, DC

7 Distribution Box for Breakers as required" As Required No Including

Mounting Space: Left to DB.

For the mounting of structure, we will drill on the roof and will use hardener for water
treatment

80% payment at the time of booking 20% after completion.