Project : South Luzon Mega DC

Location : Brgy. Paciano, Calamba, Laguna


Client : LF Logistics

Subject :OUTGOING DOCUMENT TRACKING MATRIX


Updated as of July 3, 2024

Trade /
Item Transmittal No. Document Title Scope Document Type Date Transmitted Date Responded Remarks

1.0 EPC-PO-RFI-001 Request for copies of Design Reference, Cerificates, responded and Pending RFI's ALL Email August 05, 2022 Done
2.0 EPC-PO-SOR-001 LF Project Optimus SOR ALL Email August 05, 2022 Done
3.0 EPC-PO-SOR-002 Bridgestone SOR ALL Email August 05, 2022 Done
4.0 EPC-PO-TQ-001 Various Queries (Designer's Paint Matrix aligned to LEED; Scope of Wall Cladding) CSA Email October 19, 2022 Awaiting reply from BECA/Solid/Precos
5.0 EPC-PO-TQ-002 Super Flat Slab Query (Discrepancy from URS, ACI 117 and Design Technical Specification) CSA Email December 07, 2022 Awaiting reply from BECA/Solid/Precos
6.0 EPC-PO-TQ-003 Masonry Material (Archi vs Structural Discrepancy in Callouts) CSA Email December 12, 2022 Awaiting reply from BECA/Solid/Precos
EPC-PO-TQ-004 Shop Drawing and Installation Methodology for Precast Wall CSA Email January 09, 2023 February 21, 2023 Responded by Precos
7.0 EPC-PO-QCN-001 Installation of Steel Reinforcement in Flooded Area CSA Email December 02, 2022 Responded by Precos
8.0 EPC-PO-QCN-002 Unprotected delivered reinforcing bar on SCIC Material Staging Area CSA Email December 07, 2022 January 04, 2023 Responded by Precos
9.0 EPC-PO-QCN-003 Insufficient Preparation during Concrete Pouring CSA Email December 02, 2022 January 04, 2023 Responded by Precos
10.0 EPC-PO-QCN-004 Improper Concrete Pouring Methodology CSA Email December 12, 2022 January 04, 2023 Discussed from the meeting on January 4, 2022
11.0 EPC-PO-QCN-005 Installation of Confinement Ties prior to Pouring CSA Email December 18, 2022
12.0 EPC-PO-TQ-005 Request for Concsolidated/combined Services Drawings in MEPF piping utilities MEPF Email March 06, 2023
13.0 EPC-PO-TQ-006 Potable water & sanitary drain line of battery Charging Area wash MEPF Email March 06, 2023 April 26, 2023
14.0 EPC-PO-TQ-007 Hanger Support requirements on fire sprinkler lines MEPF Email March 06, 2023 Closed
15.0 EPC-PO-TQ-008 Fabrication and installation of roofing Sheets CSA Email March 06, 2023 March 09, 2023 responded
16.0 EPC-PO-QCN-006 Fabrication of Roof without approved Drawing CSA Email March 08, 2023 March 09, 2023 responded
17.0 EPC-PO-QCN-007 Incorrect Paint rectification resulted to differrent/color/shade/tone CSA Email March 08, 2023 March 09, 2023 responded

18.0 EPC-PO-QCN-008 Non- submittals of Shop Drawings and Bar cutting Schedules for VAS Mezzanine and inbound Area CSA Email March 08, 2023 Superseded

19.0 EPC-PO-QCN-009 Installation of Roof without Checking Deflection and Incomplete Submission of MS and Shop Drawings CSA Email March 08, 2023 April 27, 2023 responded

20.0 EPC-PO-TQ-009 Waterline to roof deck on main oiffice/inbound/outbound MEPF Email March 10, 2023 April 26, 2023
21.0 EPC-PO-TQ-010 Plumbing Schematic Diagram of rain water and STP Biofeature MEPF Email March 10, 2023 June 14, 2023 Replied by Philconsultant
22.0 EPC-PO-TQ-011 Water Efficiency lalebling Scheme MEPF Email March 10, 2023 Followed up to precos on Sept. 14, 2023
23.0 EPC-PO-TQ-012 Water sensor for plumbing fixtures MEPF Email March 10, 2023 Closed
24.0 EPC-PO-TQ-013 Mechanical Ventilation Schematic Diagram and updated Fan equipment Schedule MEPF Email March 14, 2023 March 17, 2023 No schematic diagram submitted
25.0 EPC-PO-TQ-014 Sequence of operations for fire protection system MEPF Email March 14, 2023 will be submitted on the latter part
26.0 EPC-PO-TQ-015 Query on STP Design MEPF Email March 14, 2023 June 05, 2023 Responded by Edvim
27.0 EPC-PO-TQ-016 Compaction for road subgrade and sub-base CSA Email March 14, 2023 June 02, 2023 Responded by Philconsult/Precos
28.0 EPC-PO-TQ-017 Revised Structural detail plan for underground water tank CSA Email March 14, 2023 March 17, 2023 Responded by Edvim
29.0 EPC-PO-TQ-018 Updated Plan for Guardhouse B CSA Email March 14, 2023 March 17, 2023 Responded by Edvim
30.0 EPC-PO-QCN-008 Rusted reinforcing bars along g.l. A' CSA Email March 14, 2023 March 23, 2023 no Rely but was verified to be rectified during site Walkthrough
31.0 EPC-PO-QCN-009 Footing tie beam and Footing preparation for concrete pouring CSA Email March 23, 2023 Superseded
32.0 EPC-PO-QCN-010 Using Unapproved Materials for Plumbing System MEPF Email March 30, 2023 Cancelled
33.0 EPC-PO-QCN-011 Mis-Aligned concreted Footing and FTB CSA Email April 11, 2023 Closed Replied thru E-mail
34.0 EPC-PO-QCN-012 Roof Leak CSA Email April 13, 2023 Awaiting reply from BECA/Solid/Precos/ until water tightness secured
35.0 RFI 55 Main Truck Entry/Exit Modification CSA Email April 18, 2023 forwarded by EPC; For Final Response by LF
36.0 EPC-PO-QCN-013 Poor Quality of Concreted Retaining Walls and List of Pending TQ and QCN CSA Email April 18, 2023 April 27, 2023 responded
37.0 EPC-PO-TQ-019 Electronics IFC and Technnical Specifications CSA Email April 19, 2023
38.0 EPC-PO-TQ-020 MS and Equipment data for Floor Flatness Measurement CSA Email April 19, 2023 June 30, 2023 Closed
39.0 EPC-PO-QCN-014 No Block Out or Pipe Sleeve on Retaining Wall for Storm Drain Piping CSA Email Cancelled
40.0 EPC-PO-QCN-015 Incorrect Paint rectification resulted to differrent/color/shade/tone CSA Email April 27, 2023 September 02, 2023 Rectified by ASI
41.0 EPC-PO-QCN-016 Recurrence of Poor quality Concreted Surface for the retaining wall CSA Email April 27, 2023 closed rectified concrete pouiring of retaining wall completed
42.0 EPC-PO-TQ-021 Storm Drain Piping Support through Wall Cladding MEPF Email May 04, 2023 July 28, 2023 Noted as Responded
43.0 EPC-PO-TQ-022 Disconnection Switches for Material Handling MEPF Email May 04, 2023 Closed included in the revised drawing

44.0 EPC-PO-TQ-023 Methodology for repair/repaint for damaged paint on Built-up columns, Rafters and Transfer beams. CSA Email May 05, 2023 Closed as inspected at site

45.0 EPC-PO-TQ-024 Methodology for repair/repaint for damaged or dented Side walls and roofing. CSA Email May 05, 2023 Replacemet Methodology was submitted by ASI to Precos
46.0 EPC-PO-TQ-025 Flatness Test result of the 1st concreted area along g.l. F-G/1-5 CSA Email May 05, 2023 June 30, 2023 Closed
47.0 EPC-PO-QCN-017 Dented Sidewalls to be rectified CSA Email May 05, 2023 June 12, 2023 Replaced by ASI last 6/10/2023
48.0 EPC-PO-QCN-018 NonShrink Grout CSA Email May 11, 2023 replied by Sir Ferdie
49.0 EPC-PO-TQ-025 Shop Drawings for Wall mounted CO MEPF Email May 11, 2023 April 05, 2023 Closed
50.0 EPC-PO-TQ-026 Wall Mounted Convenience Outlet on Ambient Warehouse MEPF Email May 11, 2023 April 05, 2023 Closed
51.0 EPC-PO-QCN-019 Manual Leveling after the use Laser Screeder CSA Email May 15, 2023 June 08, 2023 Closed
52.0 VAS CAD Layout - Optimus MEPF Email May 19, 2023
53.0 EPC-PO-TQ-027 Possible Clashing MEPF Email 5/16/2023 replied by Precos
54.0 EPC-PO-TQ-028 Aircon For Guardhouse A & C MEPF Email 5/16/2023 June 08, 2023

55.0 EPC-PO-TQ-029 Mis-Aligned RW of Stair 29 CSA Email 5/29/2023 Closed; Acknowledged by PTDC, Precos and SCIC their negligence and it is subjected for
Rectification
56.0 EPC-PO-QCN-020 Mis-Aligned RW of Stair 29 CSA Email 5/29/2023 Closed
57.0 EPC-PO-TQ-030 Electrical Service Entrance to the Main Building CSA Email 5/29/2023 June 22, 2023 Closed
58.0 Response to RFI #61 MEPF Email June 01, 2023
59.0 EPC-PO-QCN-021 Poor Workmanship on concrete structure CSA Email June 01, 2023 Issued to PTDC
60.0 Response to RFI#59, #60 and #61 ALL Email June 05, 2023
61.0 Bi-monthly Report May2023B ALL Email June 05, 2023
Submitted drawing for R& R status of Sept. 18, 2023; Considered close since there is nomore
62.0 EPC-PO-TQ-031 Detailed Drawing for Elevator Pit CSA Email June 07, 2023 November 14, 2023 elevatorpit for the new Proposed elevator. However, a detailed Sd for the new
proposedelevator must be submitted by Precosto LF/EPC
63.0 BECA Design Schematic Plans for Electronics Plans ALL Email June 07, 2023
64.0 EPC-PO-TQ-032 Shop Drawing for Fire Protection Risers on Proposed Additional Walls / Louver MEPF Email June 08, 2023 Closed and awaiting for the copy of approved drawings
65.0 EPC-PO-TQ-033 Possible conflict on fire protection Loop To Exterior Electrical Line MEPF Email June 08, 2023 February 02, 2024 coordinated by precos to SCIC
66.0 EPC-PO-QCN-022 Lower Level of Slab along Square Edge Steel Joint CSA Email June 14, 2023 Issued to PTDC
67.0 EPC-PO-QCN-023 Poor Workmanship on Isolation Joint at Columns of Slab on grade CSA Email June 14, 2023 June 16, 2023 Closed as discussed last June 16, 2023 but still waiting for the formal reply
68.0 EPC-PO-QCN-024 Various Defects on Roofing CSA Email June 14, 2023 Issued to PTDC
69.0 Electrical Grounding Layout MEPF Email June 14, 2023 send by sir Philven
70.0 Dock Leveler Roughing-ins MEPF Email June 14, 2023 send by sir Philven
71.0 MEPF Schedule on Warehouse MEPF Email June 14, 2023 send by sir Philven
72.0 Dock Leveler Pit ALL Email June 15, 2023 send by sir Philven
73.0 EPC-PO-TQ-034 Rain Water Collecting System's Filtration System MEPF Email June 15, 2023 Coordinated by Precos to ESI
74.0 EPC-PO-QCN-025 Observed Roof Leaks on Various Areas CSA Email June 16, 2023
75.0 VAS Mezzanine Layout of Amsteel PEB Structural Design (for Big Ass Fans Supplier reference) MEPF Email June 26, 2023 Sent by Sir Philven to PTDC and Precos
76.0 EPC-PO-QCN-026 Cracks and Chipped off SOG CSA Email July 04, 2023 Issued to PTDC
77.0 EPC-PO-TQ-035 Fire Pro above Interstitial Space MEPF Email July 11, 2023 closed and responded
78.0 EPC-PO-TQ-036 Updates on electrical Sched of load for VAS MEPF Email July 12, 2023 February 02, 2024 Issued to PTDC
79.0 RFI08A Email July 18, 2023 Forwarded to precos
80.0 RFI021 Email July 18, 2023 Forwarded to precos
81.0 RFI014A Email July 18, 2023 Forwarded to precos
82.0 MEPF Plans (Reference for Fitout Design) Email July 18, 2023 Forwarded to GSTS
83.0 Labelling Scheme for Fixtures Email July 20, 2023 Forwarded to precos
84.0 Response to RFI #65 Email July 20, 2023 Forwarded to LF
85.0 PTDC unclosed RFIs Email July 20, 2023 Forwarded to LF and responded by LF
86.0 Signed RFIs (For Closeout) Email July 20, 2023 Forwarded to precos
87.0 Solid LF: Technical Query (TQ)-05_Coordinated Shop Drawings (CSD) for MEPF Services Email July 20, 2023 CC from Precos
88.0 Warehouse Area (Bare) for Layout Reference Email July 26, 2023 Frowarded to GSTS by Sir Philven
89.0 EPC-PO-TQ-037 Air Change Design Queries MEPF Email August 11, 2023 Forwarded to Precos
90.0 EPC-PO-TQ-038 Hoist Beam on Fire Pump House MEPF Email August 11, 2023 January 19, 2024 Noted as Responded
91.0 EPC-PO-TQ-039 MS, Calibration Certificate for SCIC Batching Plant CSA Email August 14, 2023 Being used and aloowed and as per Safety MS and calibration certificate available
92.0 On site Pre Bid Meeting for PAS and VAS Site Assessment for Possible Relay out of Equipment Email August 22, 2023 Forwarded to LF
93.0 Proposed Final Location of Roof Exhauster Email August 22, 2023 Forwarded to LF
95.0 EPC-PO-TQ-040 Roof leak protection for ducting Penetration for Ventilation Equipment MEPF Email August 22, 2023 Forwarded to Precos
96.0 EPC-PO-TQ-041 Various MEPF Testing MEPF Email August 22, 2023 Forwarded to Precos
97.0 EPC-PO-TQ-042 Various Equipment Installation Methodologies and Shop Drawings MEPF Email August 23, 2023 Forwarded to Precos
98.0 EPC-PO-TQ-043 Drawing to cover Gaps and Over lap of Canopies for Water Tightness Email September 04, 2023 November 15, 2023 Complied by ASI thru Precos ' instruction
99.0 EPC-PO-TQ-044 Detailed drawing for Static Grounding System to column Connection MEPF Email September 05, 2023 Forwarded to Precos
100.0 Ceiling manhole Layout for Confirmation Email September 06, 2023 Send to LF
101.0 Roof Ventilator Support Details (for confirmation) Email September 07, 2023 Forwarded to Precos
102.0 EPC-PO-QCN-027 Non Conformance of Material Delivered at site ( Concrete Mix ) CSA Email September 07, 2023 Forwarded to Precos
103.0 EPC-PO-TQ-045 Mis aligned parapet wall on roof deck Email September 08, 2023 Forwarded to Precos
104.0 Monthly Project Update for August 2023 Email September 12, 2023 November 17, 2023 Complied by ASI thru Precos ' instruction
105.0 EPC-PO-TQ-046 Electrical Design Reference ( rough in shop drawings ) MEPF Email September 13, 2023 Forwarded to Precos
106.0 SOLID LF MW PROJECT - SOG Straight Edge Monitoring Email September 20, 2023 Replied to Precos
107.0 EPC-PO-TQ-047 Request for Material Submittal of Brush and Mandrel materials prior to wires and cable laying MEPF Email September 21, 2023 Forwarded to Precos
Request for Shop Drawings for the electronics system conduiting works from Guard house B to
108.0 EPC-PO-TQ-048 Building/Warehouse MEPF Email September 21, 2023 Forwarded to Precos

109.0 RFI 74 Confirmation on the Reverted GSTS Layouts and Request on The Drywall Partition Works Email September 21, 2023 Send to LF
110.0 GSTS Reflected Ceiling Plan (comments) Email September 25, 2023 Forwarded to Precos
111.0 Bi-monthly Report Sept 2023B Email October 11, 2023 Forwarded to LF
112.0 EPC-PO-QCN-028 Cracks on SOG of Loading Docks CSA Email September 25, 2023 Forwarded to Precos
113.0 SGI-GEN-RFI-LFL-078 Consent on 2.20m High Concrete Partition with No Metal Cladding Above Between MRF and Rejected Goods Email October 17, 2023 October 24, 2023 Replied by LF
114.0 SGI-GEN-RFI-LFL-079 URS Energy Management System MEPF Email October 17, 2023 On-going Discussion
115.0 EPC-PO-TQ-049 CTs and PTs Devices and Metering Devices MEPF Email October 25, 2023 Forwarded to Precos
116.0 EPC-PO-QCN-029 Rusting BI Pipe MEPF Email December 01, 2023 Forwarded to Precos
117.0 EPC-PO-TQ-050 Clarification on URS on FDAS Monitoring Status; 12-1-2023 MEPF Email December 01, 2023 Forwarded to Precos
118.0 EPC-PO-QCN-030 Failed Concrete After 28 days of curing CSA Email December 12, 2023 Forwarded to Precos
119.0 EPC-PO-QCN-031 Sleeve Pipe ( Non Compliance On Material Used ) MEPF Email 12/14/2023 Forwarded to Precos
120.0 EPC-PO-QCN-032 Cut / Damaged Earthing Cable atr Grid line D/1 MEPF Email 12/15/2023 Forwarded to Precos
121.0 EPC-PO-TQ-051 Material for Copper to BI Connection for Chilled Water HVAC System MEPF Email December 19, 2023 Forwarded to Precos
122.0 EPC-PO-QCN-033 Improper pipe penetration on insulated wall Cladding MEPF Email December 22, 2023 Forwarded to Precos
123.0 Transmittal #003 Daily Report Boeing and RN Email January 08, 2024 Forwarded to Precos
124.0 Transmittal #004 Geo Green Email January 09, 2024 Forwarded to Precos
125.0 Transmittal #005 Gen Set Load Requirement Email January 09, 2024 Forwarded to Precos
126.0 Transmittal #006 Dexion Temp. Facility Email January 09, 2024 Forwarded to Precos
127.0 Warehouse Access Point Installation -above ceiling updated layout Email January 09, 2024 Forwarded to Precos
128.0 EPC-PO-QCN-034 Chipped of Portion of Pillow block ALL Email January 11, 2024 Forwarded to Precos
EPC-PO-TQ-051 Material for Copper to BI Connection for Chilled Water HVAC System MEPF Email December 19, 2023 February 02, 2024 Reverted back to Precos for a more reasonable answer to a necessary query
129.0 EPC-PO-TQ-052 Spare ECB of LVSG MEPF Email January 11, 2024 January 23, 2024 Reverted back to Precos for a more reasonable answer to a necessary query
130.0 EPC-PO-TQ-053 BMS Readiness and Electrical Metering System MEPF Email January 23, 2024 February 02, 2024 Forwarded to Precos
131.0 TQ Update As of 25 January, 2024
132.0 EPC-PO-QCN-035 Rough surface on loading dock retaining wall with laitance CSA Email January 26, 2024 Forwarded to Precos
133.0 Transmittal #007 Installation of AP, IDF and Cable RNT Email January 22, 2024 Forwarded to Precos
134.0 Transmittal #008 Installation of AP, IDF and Cable RNT rev 1 Email January 26, 2024 Forwarded to Precos
135.0 Transmittal #009 Dexion Revised Fixation on Racking system Email January 26, 2024 Forwarded to Precos
136.0 EPC-PO-QCN-036 Various Observations on Exterior Works of Fire Protection Lines and Sanitary Lines MEPF Email January 29, 2024 Forwarded to Precos
137.0 Transmittal #010 Geo Green HVLS Lay out at VAS Mezzanine for Electrical Wiring Load MEPF Email January 30, 2024 Forwarded to Precos
138.0 Transmittal #011 Installation of AP, IDF and Cable for inbound and outbound office MEPF Email February 02, 2024 Forwarded to Precos
139.0 Transmittal #012 Installation of Data Ports and IDF Cabinet at Inbound and Outbound Bldg. MEPF Email February 06, 2024 Forwarded to Precos
140.0 EPC-PO-QCN-038 Plumbness / verticality of Loading Dock Wall CSA Email February 08, 2024 Forwarded to Precos
141.0 Transmittal #013 Signed Lighting layout of FTR MEPF Email February 08, 2024 Forwarded to Precos
142.0 Transmittal #014 Location of IDF's at Outbound office, Inbound office, Main office, Warehouse and Guardhouse MEPF Email February 16, 2024 Forwarded to Precos
143.0 Transmittal #015 HVLS Electrical Line and VFD Layout MEPF Email February 17, 2024 Forwarded to Precos
144.0 Transmittal #016 ESSCOR Shop Drawings with CAD File MEPF Email February 22, 2024 Forwarded to Precos
145.0 EPC-PO-TQ-054 Pendant Sprinkler Deflector Distance on Ambient Warehouse MEPF Email March 11, 2024 Forwarded to Precos
146.0 Transmittal #017 RNT Conduit Installations (Warehouse to Outbound and Inbound MEPF Email March 14, 2024 Forwarded to Precos
147.0 Transmittal #018 RNT Conduit Installations (AP Typical Conduit Details) MEPF Email March 18, 2024 Forwarded to Precos
148.0 Transmittal #019 ESSCOR Boom Barrier Roughing Ins Layout MEPF Email March 19, 2024 Forwarded to Precos
149.0 EPC-PO-QCN-039 Non Complying Material for Water Line at Water Meter Assembly MEPF Email March 19, 2024 Forwarded to Precos
150.0 Transmittal #020 Data Chipping Works MEPF Print March 21, 2024 Superseded
151.0 EPC-PO-TQ-055 FDAS Beam ( Sensor ) Detector on Ambient Warehouse MEPF Email March 25, 2024 Forwarded to Precos
152.0 Transmittal #021 Incident report (Damage to embeded wires by RNT) MEPF Print 3/22/2024 Forwarded to Precos
153.0 EPC-PO-QCN-040 No Bonding Jumper MEPF Print 3/22/2024 Forwarded to Precos
154.0 EPC-PO-QCN-041 No Grounding Provision on installed lighting poles MEPF Print 3/22/2024 Forwarded to Precos
155.0 EPC-PO-QCN-042 Installed Electrical & Auxiliary Manholes without Grounding rod MEPF Print 3/22/2024 Forwarded to Precos
156.0 EPC-PO-QCN-043 Missing Manhole Accessories on the electrical Auxiliary Manholes MEPF Print 3/22/2024 Forwarded to Precos
157.0 EPC-PO-QCN-044 No Proper Sleeving on piping installation installed on slab and wall penetrations MEPF Print 3/22/2024 Forwarded to Precos
158.0 EPC-PO-QCN-045 Non Mandrel Test prior to Cable Pulling MEPF Print April 03, 2024 Forwarded to Precos
159.0 Transmittal #022 FTR Adjustment of HBL at Center Aisle (Along Gridline D) MEPF Print April 04, 2024 Forwarded to Precos
160.0 Transmittal #023 ESSCOR Turnstile & Supplement Drawings for Access Control System Roughing Ins Layout MEPF Print April 13, 2024 Forwarded to Precos
161.0 Transmittal #024 RNT Incident report MEPF Print April 13, 2024 Forwarded to Precos
162.0 Transmittal #025 ESSCOR Electrical Panel Connection MEPF Print April 18, 2024 Forwarded to Precos
163.0 Transmittal #026 ESSCOR CAT6 & Fiber Optic Cables MEPF Print April 22, 2024 Forwarded to Precos

164.0 Transmittal #027 Fit-out IFC from CSA Email April 22, 2024 Forwarded to Precos; Suupplementary drawingsadded thtough email last April 29, 2024

165.0 EPC-PO-TQ-056 IT room Back UP AC and FM 200 Extraction MEPF Print April 23, 2024 Forwarded to Precos
166.0 Transmittal #028 FTR Electrical Works for L'Oreal MEPF Print April 24, 2024 Forwarded to Precos
167.0 Transmittal #029 RNT FOC Required Conduit from Admin to Guardhouse B MEPF Print April 29, 2024 Forwarded to Precos
168.0 Transmittal #030 Door Finish color by GSTS for SCIC fire rated doors on offices CSA Print April 30, 2024 Forwarded to Precos
169.0 EPC-PO-QCN-057 Electrical Shrinkable Tube and Tagging MEPF Email May 2, 2024 Forwarded to Precos
170.0 EPC-PO-QCN-058 CB 2 Grating CSA Email May 2, 2024 Forwarded to Precos
171.0 Transmittal #031 ESSCOR Supplement Drawings MEPF Print May 2, 2024 Forwarded to Precos
190.0 EPC-PO-QCN-046 FCU Machine Connection to Chilled Water Pipes without Chemical Flushing MEPF Print May 6, 2024 Forwarded to Precos
191.0 Transmittal #32 ESSCOR Supplement Details MEPF Print May 13, 2024 Forwarded to Precos
192.0 EPC-PO-QCN-047 No Fuel Bund/Containment Wall on Gen Set Day Tanks MEPF Print May 21, 2024 Forwarded to Precos
193.0 EPC-PO-QCN-048 Cable Color Code MEPF Print May 21, 2024 Forwarded to Precos
194.0 Transmittal #33 GSTS MSDS CSA Email May 22, 2024 Forwarded to Precos
195.0 EPC-PO-QCN-049 Concrete cover at Finger Docks CSA Email May 22, 2024 Forwarded to Precos
196.0 EPC-PO-QCN-050 Clashing / Protrusion of electrical Manhole to the curbs. CSA Email May 28, 2024 Forwarded to Precos
197.0 Transmittal #34 COC of FTR lightings L'oreal Area MEPF Print June 14, 2024 Forwarded to Precos
198.0 Transmittal #35 COC of LP2, LP3 and LP5 MEPF Print July 3, 2024 Forwarded to Precos
Prepared By:

GUIAN NIKO R. CUENO


Project : South Luzon Mega DC
Location : Brgy. Paciano, Calamba, Laguna

Client : LF Logistics

Subject : INCOMING DOCUMENT TRACKING MATRIX


Updated as of July 3, 2024

Item Transmittal No. Document Title Trade / Scope Document Type No. of Date Received Date Responded Status Remarks
Sheets

1.0 No. Transmittal; copy sent Through Email IFC rev 1 CSA OTHERS December 01, 2022 APPROVED For Implementation
2.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-001 Material Submittal for Reinforcing bars(Steel Asia) CSA FA December 12, 2022 RESPONDED
3.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-002 Material Submittal for Ready Mix Coincrete Readycon CSA FA December 12, 2022 RESPONDED
4.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-003 Material Submittal for Independent Laboratory Testing(PGA) CSA FA December 12, 2022 RESPONDED
5.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-004 Material Submittal for Independent Laboratory Testing(xwell) CSA FA December 12, 2022 RESPONDED
6.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-007 Material Submittal for Reinforcing bars (Capitol Steel) CSA FA December 12, 2022 RESPONDED
7.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-MW-ASI-MT-004 Material Submittal for Painting material for Steel (Jotun) CSA FA December 12, 2022 RESPONDED
8.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-MW-ASI-DWG-IB-001 to 10 Drawing inbound 1 to 10 CSA FA December 12, 2022 RESPONDED
9.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-AR-002 Temporary Site Facility Layout Plan CSA FA December 12, 2022 RESPONDED
10.0 No. Transmittal; copy sent Through Email Material Testing result 11.11.2022 (ASI) CSA FA December 12, 2022 RESPONDED
11.0 No. Transmittal; copy sent Through Email Material Testing result 11.18.2022 (ASI) CSA FA December 12, 2022 RESPONDED

12.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-001 Method Statement for the Construction of SOLID LF Warehouse Project CSA December 07, 2022

13.0 No. Transmittal; copy sent Through Email DRS-SGI-PEB-ASI-CALC-004-REV 0 Calculation - Inbound Building - Base Plate and Anchor Rod CSA December 07, 2022
14.0 No. Transmittal; copy sent Through Email IFC rev 2 CSA December 14, 2022
15.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-TS-113-0 DVIR 015 Dimension and Visual Inspection Report 15 CSA OTHERS December 28, 2022
16.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DVIR-0019 Dimension and Visual Inspection Report 19 CSA OTHERS December 28, 2022
17.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-PLN-002 Project Quality Plan (PQP) CSA OTHERS December 28, 2022
18.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-035 Suspension of Works at Gridline 13 due to Design Change CSA OTHERS December 28, 2022

19.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-040 Response to RFI-003 CF21 LOCATION AND FOOTING TIE BEAM CSA December 28, 2022

20.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-041 MOM JOINT SITE CONTRACTORS COORDINATION No.6 CSA OTHERS December 28, 2022
21.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MN-001 Construction Environment Safety and Health (CESH) Program CSA OTHERS December 28, 2022
22.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-PLN-002 SCIC Contruction Quality Management Plan (PQP) CSA December 28, 2022

23.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-009 Material Submittal for Concrete Curing Compund (Goldcure WB) CSA December 28, 2022

24.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-007 SD - Layout of Pedestal @ SF3, SF4 & SF5 CSA December 28, 2022
25.0 No. Transmittal; copy sent Through Email Weekly Report by SCIC, ASI and Precos CSA December 28, 2022
26.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-069 MS Const.of Under Water Con. Tank Review CSA January 24, 2023
27.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-068 SD - Con. Det. of Ret. Wall at P2, Ft. F4 & F1 along GL1 CSA January 24, 2023
28.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-068 SD Con. Det. of Ret. Wall at P2, Ft. F4 & F1 along GL1 CSA January 24, 2023
29.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-066 MW Contractor Procurement Planning. Schedule CSA January 24, 2023

30.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-058 SD - Layout of Underground Rain Water Tank, Fire & Reserved Water & Fuel Tank CSA January 24, 2023

31.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-057 Project Quality Plan (PQP) Rev.1 eview CSA January 24, 2023
32.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-056 ITP Civil and Concreting Works Review CSA January 24, 2023
33.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-052 MOM JOINT SITE CONTRACTORS COORDINATION No.8 CSA January 24, 2023
34.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-042 Lot Plan (PCS-04-005096) & Consolidation-Subd. Plan CSA January 24, 2023
35.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-039 SD-Layout of Pedestal @ SF3, SF4 & SF5 CSA January 24, 2023
36.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-038 MT Concrete Curing Compund (Goldcure WB) CSA January 24, 2023
37.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-037 Typical Connection of Retaining Wall at Footings R1 CSA January 24, 2023

38.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-005 TYPICAL CONNECTION OF RETAINING WALL AT FOOTING F1 AND F4 ALONG GRID CSA January 24, 2023
LINE 1 - REV1
39.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-036 Detail Con. of Retaining Wall @ Strip Footing R1 CSA January 24, 2023

40.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-002 DETAIL CONNECTION OF RETAINING WALL @ STRIP FOOTING SF-1 - REV1 CSA January 24, 2023

41.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-033 MOM JOINT SITE CONTRACTORS COORDINATION No.5 CSA January 24, 2023
42.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-074 SD - Layout UG Tanks Rev.1 CSA January 24, 2023
43.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-008 rev.1_ 23.13.16-ACV comments CSA January 24, 2023

44.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-073 Adjustment Size of Pedestal P1 Along Grid line A' A' & G',G CSA January 24, 2023

45.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-014 CSA January 24, 2023

46.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-070 MS Soil Poisoning Review CSA January 24, 2023

47.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-007- ESI Comments(FA) CSA January 24, 2023

48.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-071 MOM JOINT SITE CONTRACTORS COORDINATION No.10 CSA January 24, 2023
49.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-087 MT for Grout (SIKA Grout 212) Review CSA January 24, 2023
50.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-MT-007-0 MATERIAL SUBMITTAL FOR GROUT CSA January 24, 2023
51.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-083 Project Quality Plan (PQP) Rev.2 Review CSA January 24, 2023
52.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-076 Con. Det. of Ret. Wall at P2, Ft. F4 & F1 along GL1 CSA January 24, 2023
53.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-081 MS for the Construction of SOLID LF WAREHOUSE R1 CSA February 01, 2023
54.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-082 MOM JOINT SITE CONTRACTORS COORDINATION No.11 CSA February 01, 2023
55.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-076 Con. Det. of Ret. Wall at P2, Ft. F4 & F1 along GL1 CSA February 01, 2023
56.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-079 Traffic Management Plan Review CSA February 01, 2023
57.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-076 Con. Det. of Ret. Wall at P2, Ft. F4 & F1 along GL1 CSA February 01, 2023
58.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-074_SD Layout UG Tanks Rev.1 CSA February 01, 2023
59.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-008_rev.1_ 23.13.16 ACV comments CSA February 01, 2023
60.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-073 Adjustment Size of Pedestal P1 Along Grid line A' A' & G',G CSA February 01, 2023
61.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-014 CSA February 01, 2023
62.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-070 MS Soil Poisoning Review CSA February 01, 2023
63.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-007 ESI Comments(FA CSA February 01, 2023
64.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-075 Material Submittal for Independent Lab. R1 Review CSA February 01, 2023
65.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-077 Non-Conformance Report (NCR) 001 CSA February 01, 2023

66.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-078 Legal and Statutory Compliance CSA February 01, 2023

67.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-080 Ready Mix Concrete Supplier (Readycon 6000 psi CSA February 01, 2023

68.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-093 MOM-PEB CONTRACTOR COORDINATION No. 25_24Jan23 CSA February 01, 2023

69.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-088 LEED Implementation Plan Rev.2 Review CSA February 21, 2023

70.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-084 Excavation Works at VAS Area CSA February 21, 2023
71.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-094 PRQ- Blaster - Blasting and Painting Subcontractor CSA February 21, 2023

72.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-099 Project Quality Plan (PQP) Rev.2 review CSA February 21, 2023

73.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-111 SD - For Pillow Block Detail Review CSA February 21, 2023

74.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-018 PILLOW BLOCK DETAILS FOR PRECAST WALL comments CSA February 21, 2023

75.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-111 SD - For Pillow Block Detail Review CSA February 21, 2023

76.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-109 Testing Laboratory(EB&Geomatrix) CSA February 21, 2023

77.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-108 Proposed Project Schedules Rev.2 Review CSA February 21, 2023

78.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SCH-001_rev.2 CSA February 21, 2023
79.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-102_ MS Soil Poisoning R1 Review CSA February 21, 2023

80.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-007_rev.1 Commented ESI-FA CSA February 21, 2023

81.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-107 SD -Con.of Retaining Wall RW02 Dock Slab CSA February 21, 2023

82.0 No. Transmittal; copy sent Through Email 2790300-BE-8106 MISCELLANEOUS DETAILS - SHEET 6-BE-8106 CSA February 21, 2023

83.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-106_ RFI.7 Electrical IFC Drawings CSA February 21, 2023

84.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RFI-007 Commented FA CSA February 21, 2023

85.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-105_ RFI.5 No Foundation Det. Passenger Elev CSA February 21, 2023

86.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RFI-005 with FF comments CSA February 21, 2023

87.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-104 LEED Implementation Plan Rev.3 Review CSA February 21, 2023

88.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-PLN-002_rev.3 Commented ESI-FA CSA February 21, 2023

89.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-090_ MEPF Procurement Technical Data for Evaluation CSA February 21, 2023

90.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-101 Requested Dwg for Structural Details Revised Pedestal CSA February 21, 2023

91.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-11 Non-Conformance Report (NCR) 002 CSA February 21, 2023

92.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-065 Report for Plate Load Test of Proposed CSA February 23, 2023
93.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-002 CSA February 23, 2023
94.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-095 _ MS Const.of UWCon. Tank R1 Review CSA February 27, 2023
95.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-092_ ITP Civil and Concreting Works R1 Review CSA February 27, 2023
96.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-100_ Material Submittal for Structured Wall Pipes (krah) CSA February 27, 2023
97.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-116_ Request for 3 Weeks Lookahead.pdf CSA February 27, 2023
98.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SCH-001_rev.2 CSA February 27, 2023
99.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SCH-002.pdf CSA February 27, 2023
100.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-115 UNDERGROUND Watertank Plan and Details CSA February 27, 2023
101.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-119 SD - UG Water Tank & Pedestal Drawing Review CSA February 27, 2023
102.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-120_ SD - Layout of Pedestal @ SF3, SF4 & SF5 Review CSA February 27, 2023
103.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-007_rev. CSA February 27, 2023
104.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-094_SD - Topographic Survey Plan R1 Review CSA February 27, 2023
105.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-108 Proposed Project Schedules Rev.2 Review CSA February 27, 2023
106.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-114 Rebar Cutting CSA February 27, 2023
107.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-115 UNDERGROUND Watertank Plan and Details CSA February 27, 2023
108.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-117 SD -Various Architectural Drawings Review CSA February 27, 2023
109.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-118 SD - Various Structural Drawing Approval CSA February 27, 2023
110.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-100 MOM-PEB CONTRACTOR COORDINATION No. 27_08Feb23 CSA February 27, 2023
111.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-101 Proposed Project Schedule Rev.5 Review CSA February 27, 2023
112.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-128 Inspection Test Plan for Under Ground Water Tank CSA March 01, 2023

113.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-126 SD - For Fence Profile FN 04 Review.pdf CSA March 01, 2023

114.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-125 SD - For Pedestal for Precast Drawing R1 Review CSA March 01, 2023
115.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-127 Engineers Office and Deliverables CSA March 01, 2023
116.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-124 Impacted Schedule of Solid LF Project Comments CSA March 06, 2023
117.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-125 SD Precast Wall Detail R1 Review CSA March 06, 2023
118.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-016_ sheet 1 of 2 CSA March 06, 2023

119.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-016_ sheet 2 of 2 CSA March 06, 2023

120.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-009_0-Comments CSA March 06, 2023
121.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-130 MS for Warehouse Ambient Floor Slab Review CSA March 06, 2023
122.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-RFI-010 -0 CSA March 06, 2023

123.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-102 - RFI-010 Ambient Warehouse Ceiling Slope and Elevation, Louver & Window Opening Details CSA March 06, 2023

124.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-105 MT for Grout (SIKA Grout 212) R1 Review CSA March 06, 2023
125.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-MT-007- Rev 1 Grout - SIKA 212 CSA March 06, 2023
126.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-121 MT Geogrid and Dramix Fiber Review CSA March 06, 2023
127.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-122 MT Terajoint System PEIKKO _ Dowel Review CSA March 06, 2023
128.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-125_ SD For Pedestal for Precast Drawing R1 Review CSA March 06, 2023
129.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-129 Request to Submit Coordination Drawing related to As- Built CSA March 06, 2023
130.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-132 MT Masonry CHB 4 and CHB 6 (Quality Star) CSA March 06, 2023
131.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-106 MS for Grouting Works Review CSA March 06, 2023

132.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-141_ Document Approval Requirements to Billing Approval CSA March 09, 2023
133.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-002_0 CSA March 09, 2023
134.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-006_0.xlsx CSA March 09, 2023
135.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-008_0.xlsx CSA March 09, 2023
136.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-010_0.xlsx CSA March 09, 2023
137.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-139_ Various Submitted ITPs Comments CSA March 09, 2023
138.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-002_0.xlsx CSA March 09, 2023
139.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-127_ Engineers Office and Deliverables CSA March 09, 2023
140.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-142 MS Temporary Facilities Building Construction .pdf CSA March 09, 2023
141.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-027_0.xlsx CSA March 09, 2023
142.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-140 Material Submittal for Hydrotite CJ-Type Water Stop .pdf CSA March 09, 2023
143.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-135_ MS Construction of Foundation, Pedestal _ Pedestal Wall CSA March 09, 2023
144.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-136_ MT for Burnish Floor Slab & Crushed Aggregate.pdf CSA March 09, 2023
145.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-022_0.xlsx CSA March 09, 2023
146.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-020_0.xlsx CSA March 09, 2023
147.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-OTH-005_0.xlsx CSA March 09, 2023
148.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-137 Rebar Cutting List for Inbound & Outbound Office Bu.pdf CSA March 09, 2023
149.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-134 LEED Site Inspection No.8 as of February 2023 CSA March 09, 2023
150.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-107 MOM-PEB CONTRACTOR COORDINATION No. 30_01Mar23 CSA March 09, 2023
151.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-DES-003_2 - 20230227 (1).xlsx CSA March 09, 2023
152.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-108 Calculations for Vas Mezzanine Base Plate and Anchor Rod CSA March 09, 2023
153.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-RC-001 Roof plan by ASI CSA March 09, 2023
154.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-RC-022 Ventilation at roof 1 MECHANICAL March 09, 2023
155.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-RC-023 Ventilation at roof 2 MECHANICAL March 09, 2023
156.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-RC-024 Ventilation at roof 3 MECHANICAL March 09, 2023
157.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-RC-025 Ventilation at roof 4 MECHANICAL March 09, 2023
158.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-RC-026 Ventilation at roof 5 MECHANICAL March 09, 2023
159.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-RC-027 Ventilation at roof 6 MECHANICAL March 09, 2023
160.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-TS-0166-0 Roofing & Flashing Details.pdf CSA March 09, 2023
161.0 No. Transmittal; copy sent Through Email SUPERSEDED.rar Superseded R1 CSA March 09, 2023
162.0 No. Transmittal; copy sent Through Email SCIC-Solid LF-SCH- Impacted Project Schedule (Critical Path)-Rev 1 CSA March 10, 2023
163.0 No. Transmittal; copy sent Through Email SCIC-Solid LF-SCH- Impacted Project Schedule-Rev 1.pdf CSA March 10, 2023
164.0 No. Transmittal; copy sent Through Email 20230215 Batino Roadmap.xlsx - Roadmap Gold.pdf CSA March 10, 2023
165.0 No. Transmittal; copy sent Through Email 20230215 Batino Roadmap.xlsx - Target Scorecard Gold.pdf CSA March 10, 2023
166.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-PQD-001_1 CSA March 10, 2023
167.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-148_ Security Survey and Risk Assessment R1 review CSA March 10, 2023
168.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-032_0 CSA March 10, 2023
169.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-147 MT Portland Cement Type 1 & Type 1P1T .pdf CSA March 10, 2023
170.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-CER-006_0 CSA March 10, 2023
171.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-146 Crane and Equipment Third Party Certificates.pdf CSA March 10, 2023
172.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-144 For Info-PEB Project Schedule Rev.6 .pdf CSA March 10, 2023
173.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-SC-001 REV 6 PROPOSED PEB PROJECT SCHEDULE.pdf CSA March 10, 2023
174.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-138 SD -Pedestal Along Grid Line 42 A to E CSA March 10, 2023
175.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-143_RFI-06,08 _ 09 MEPF CSA March 10, 2023
176.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-145_RFI-2 Diff. on Actual Elevation CSA March 10, 2023
177.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-PRD-003-0 Coating Touch-up Procedure CSA March 10, 2023
178.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-153 IFC drawing rev2 and 3 for underground tank details CSA March 14, 2023
179.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-083 IFC MEPF Drawings & Specification MECHANICAL March 14, 2023
180.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-154_ SD For Pillow Block Detail R1 Review CSA March 14, 2023
181.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-018_rev.1 March 14, 2023
182.0 No. Transmittal; copy sent Through Email 2790300-SE-2120_R3 MAIN OFFICE FOUNDATION LAYOUT CSA March 14, 2023 morning version
183.0 No. Transmittal; copy sent Through Email 2790300-SE-2410_r3 MAIN WAREHOUSE SLAB ON GRADE DETAIL CSA March 14, 2023 morning version
184.0 No. Transmittal; copy sent Through Email 2790300-SE-3103B_r1 MAIN OFFICE FOUNDATION FOOTING DETAILS CSA March 14, 2023 morning version
185.0 No. Transmittal; copy sent Through Email 2790300-SE-8940 R2 PUMPHOUSES AND TANKS PLANT LAYOUT MECHANICAL March 14, 2023 morning version
186.0 No. Transmittal; copy sent Through Email 2790300-SE-8941_r2_ Underground Fuel TANK DETAILS March 14, 2023 morning version

187.0 No. Transmittal; copy sent Through Email 2790300-SE-8942_r2_ UNDERGROUND FIRE AND WATER RESERVED TANK DETAILS CSA March 14, 2023 morning version

188.0 No. Transmittal; copy sent Through Email 2790300-SE-8944_r2 UTILITY TANK WALLS, COLUMNS, BEAMS CONNECTION CSA March 14, 2023 morning version
189.0 No. Transmittal; copy sent Through Email 2790300-SE-8945 R2 FUEL PUMPHOUSE PLAN AND DETAILS CSA March 14, 2023 morning version
190.0 No. Transmittal; copy sent Through Email 2790300-SE-8946_R2 PUMPHOUSE PLAN AND DETAILS CSA March 14, 2023 morning version
191.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-153_DWG Updates UG Water tank, Warehouse Slab CSA March 14, 2023 morning version
192.0 No. Transmittal; copy sent Through Email 2790300-SE-2120_R3 MAIN OFFICE FOUNDATION LAYOUT CSA March 14, 2023 Afternoon version
193.0 No. Transmittal; copy sent Through Email 2790300-SE-2410_r3 MAIN WAREHOUSE SLAB ON GRADE DETAIL CSA March 14, 2023 Afternoon version
194.0 No. Transmittal; copy sent Through Email 2790300-SE-3103B_r1 MAIN OFFICE FOUNDATION FOOTING DETAILS CSA March 14, 2023 Afternoon version
195.0 No. Transmittal; copy sent Through Email 2790300-SE-8940 R2 PUMPHOUSES AND TANKS PLANT LAYOUT CSA March 14, 2023 Afternoon version
196.0 No. Transmittal; copy sent Through Email 2790300-SE-8941_r2_ Underground Fuel TANK DETAILS CSA March 14, 2023 Afternoon version
197.0 No. Transmittal; copy sent Through Email 2790300-SE-8942_r2_ UNDERGROUND FIRE AND WATER RESERVED TANK DETAILS CSA March 14, 2023 Afternoon version

198.0 No. Transmittal; copy sent Through Email 2790300-SE-8944_r2 UTILITY TANK WALLS, COLUMNS, BEAMS CONNECTION CSA March 14, 2023 Afternoon version
199.0 No. Transmittal; copy sent Through Email 2790300-SE-8945 R2 FUEL PUMPHOUSE PLAN AND DETAILS CSA March 14, 2023 Afternoon version
200.0 No. Transmittal; copy sent Through Email 2790300-SE-8946_R2 PUMPHOUSE PLAN AND DETAILS CSA March 14, 2023 Afternoon version
201.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-153_DWG Updates UG Water tank, Warehouse Slab CSA March 14, 2023 Afternoon version
202.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-005 (Sheet 1 & 2)_0_by FF.xlsx CSA March 14, 2023
203.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-157_ SD - Typical Chain Link Fence Details Review CSA March 14, 2023
204.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-SC-001_6.xlsx CSA March 14, 2023
205.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-109 - Proposed Project Schedule Rev.6 Review CSA March 14, 2023
206.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-SC-001- REV 6 PROPOSED PEB PROJECT SCHEDULE CSA March 14, 2023
207.0 No. Transmittal; copy sent Through Email SCIC_Solid LF_LEED Compliance Report CSA March 14, 2023
208.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-150_ MT Elec.UPVC Pipes and Fittings ELECTRICAL March 14, 2023
209.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-151_ RFI-013 For Fire Pumps FIRE PRO March 14, 2023
210.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-155_ RFI-13 Underground Water Tank PLUMBING March 14, 2023
211.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-156 Notification regarding unsuitable soil CIVIL March 14, 2023
212.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-158_ MS for Warehouse Ambient Floor Slab Review CSA March 20, 2023
213.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-157_ SD - Typical Chain Link Fence Details Review CSA March 20, 2023
214.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-112- Cal.Vas Mezzanine Steel Connections Review CSA March 20, 2023
215.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-111 - Non-Conformance Report (NCR) 001 CSA March 20, 2023
216.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-SC-001- REV 6 PROPOSED PEB PROJECT SCHEDULE (1) CSA March 20, 2023
217.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-RFI-011-0 Anchor Bolt - Paint Finish_FF CSA March 20, 2023
218.0 No. Transmittal; copy sent Through Email 2790300-CA-2030 r3 pavement joint layout OVERALL CIVIL March 23, 2023
219.0 No. Transmittal; copy sent Through Email 2790300-CA-2031 r1 pavement joint layout sheet 1of4 CIVIL March 23, 2023
220.0 No. Transmittal; copy sent Through Email 2790300-CA-2032 r1 pavement joint layout sheet 2of4 CIVIL March 23, 2023
221.0 No. Transmittal; copy sent Through Email 2790300-CA-2033 r1 pavement joint layout sheet 3of4 CIVIL March 23, 2023
222.0 No. Transmittal; copy sent Through Email 2790300-CA-2034 r1 pavement joint layout sheet 4of4. CIVIL March 23, 2023
223.0 No. Transmittal; copy sent Through Email 2790300-CA-4010_r3 storm DRAINAGE system LAYOUT PLUMBING March 23, 2023
224.0 No. Transmittal; copy sent Through Email 2790300-CA-4013_r3 DRAINAGE MANHOLE, TABLE PLUMBING March 23, 2023
225.0 No. Transmittal; copy sent Through Email 2790300-CA-4060 R2 CAR PARKING DRAINAGE LAYOUT PLUMBING March 23, 2023
226.0 No. Transmittal; copy sent Through Email 2790300-CA-4061 R2 MOTOR AND BIKE PARKING DRAINAGE LAYOUT CIVIL March 23, 2023
227.0 No. Transmittal; copy sent Through Email 2790300-SGI-DES-MS-REG-DWG-008_ Drawing Register_230321 DRAWING INDEX ONLY March 23, 2023
228.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-001_0 (Sht 1 -4) March 23, 2023
229.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-003_0 March 23, 2023
230.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-160_ Rebar Cutting List for Inbound _ Outbound STRUCTURAL March 23, 2023
231.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-161_ Schedule _ Location of Roll Forming Machine CSA March 23, 2023
232.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-162_ SD for Electrical & Auxiliary Layout Review ELECTRICAL March 23, 2023
233.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-163_ SD Lighting Arrester & Grounding Instal Details ELECTRICAL March 23, 2023
234.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-164_ Guard House A & C Power Layout (2) ELECTRICAL March 23, 2023
235.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-165_ MT Conduits , Fittings, Boxes, &Acces ELECTRICAL March 23, 2023
236.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-166_ Civil Dwg. Pavement Joint & Drainage Layout PLUMBING March 23, 2023
237.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-167_ SD - Typical Chain Link Fence Details R1 Review CIVIL March 23, 2023
238.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-115 - Non-Conformance Report (NCR) 002 (2) CSA March 23, 2023
239.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-116 - Non-Conformance Report (NCR) 003 CSA March 23, 2023
240.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-041_ With Fel comments_Approved MECHANICAL March 23, 2023
241.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-005_ SHEET 1 OF 2 MECHANICAL March 23, 2023
242.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-005_ SHEET 2 OF 2 MECHANICAL March 23, 2023
243.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-002_ Sheet 1 of 2_With Fel comments_R&R_21Mar23 MECHANICAL March 23, 2023
244.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-002_ Sheet 2 of 2_With Fel comments_R&R_21Mar23 MECHANICAL March 23, 2023
245.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-SC-001-REV 6 PROPOSED PEB PROJECT SCHEDULE (1) CSA March 23, 2023
246.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-158 MS for Warehouse Ambient Floor Slab Review CSA March 23, 2023
247.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-113 Various Calculation Approvals CSA March 23, 2023
248.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-114 Cal.Ambient Warehouse - Strut Connection Review CSA March 23, 2023
249.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-169 - MEPFS (Documents) MECHANICAL March 24, 2023
250.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-170_ SD Fence Profile FN 01 North Side Review CSA March 24, 2023
251.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-171_ SD For Fence Profile FN 04 R1 Review CSA March 24, 2023
252.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-009 (Sht 1 & 2)_0_by FF.xlsx CSA March 24, 2023
253.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-172_ SD - Typical Fence to Existing RC Wall Detail .pdf CSA March 24, 2023
254.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-008 (Sht 1 to 2)_0_by FF.xlsx CSA March 24, 2023
255.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-173_ Typical Chainlink Fence Detail for North & East Side.pdf CSA March 24, 2023 APPROVED
256.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-174_ MT Vibro Sand and Ordinary Sand for Concrete. CSA March 27, 2023 APPROVED
257.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-175_ ITP Ambient Warehouse Slab on Grade _ Dock Slab CSA March 27, 2023 APPROVED
258.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-176_ MT for Burnish Floor Slab _ Crushed Aggregate CSA March 27, 2023 APPROVED
259.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-177_ Material Submittal - Polyethylene Sheet CSA March 27, 2023 APPROVED use 2 6 mils or minimum of 8 mils
260.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-178_ Approved Material Submittals Civil _ Testing CSA March 27, 2023
261.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-181_ Environment Safety and Health (CESH) Program Review CSA March 28, 2023
262.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-118- Various Method Statement Approvals CSA March 28, 2023
263.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-006_0.xlsx CSA March 28, 2023
264.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-179_ SD -Wash Bay Layout.pdf CSA March 28, 2023
265.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-180_ Safety Walk Finding 008 March 03 2023 CSA March 30, 2023
266.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-187_ SD Detail Connection of CF24A to RW02 @ Inbou CSA March 30, 2023
267.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-188_ MS Perimeter Wall Fence (Block Works) CSA March 30, 2023
268.0 No. Transmittal; copy sent Through Email DRCS-SGW-MW-SCIC-SD-ST-016_1_ff.xlsx CSA March 30, 2023
269.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-186_ SD Precast Wall Detail.pdf CSA March 30, 2023
270.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-016_ sheet 1 of 2.pdf CSA March 30, 2023
271.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-016_ sheet 2 of 2.pdf CSA March 30, 2023
272.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-002_0.xlsx CSA March 30, 2023
273.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-185_ SDTypical Palisade Fence Det for South Bndry.pdf CSA March 30, 2023
274.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-002 _ with FF commnet.pdf CSA March 30, 2023
275.0 No. Transmittal; copy sent Through Email AA-9201.pdf CSA March 30, 2023
276.0 No. Transmittal; copy sent Through Email AA-9202.pdf CSA March 30, 2023
277.0 No. Transmittal; copy sent Through Email AA-9205.pdf CSA March 30, 2023
278.0 No. Transmittal; copy sent Through Email AA-9207.pdf CSA March 30, 2023
279.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-183_ IFC for Window Schedule.pdf CSA March 30, 2023
280.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-193_ Mech _ Elec IFC-Rev2 CSA March 31, 2023
281.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-191_ SD - UG Water Tanks R3 Review CSA March 31, 2023
282.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-003_0.xlsx CSA March 31, 2023
283.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-192_ SD- Typ. Palisade Fence details for East Boundary.pdf CSA March 31, 2023
284.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-WR-LEED-011_0.xlsx CSA March 31, 2023
285.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-190_ Leed Weekly Report11 Review.pdf CSA March 31, 2023
286.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-WR-LEED-011- ECOS-COMMENTS.pdf MECHANICAL March 31, 2023
287.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-WR-LEED-011_0.xlsx March 31, 2023
288.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-190_ Leed Weekly Report11 Review.pdf CSA March 31, 2023
289.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-195_ Material Submittal for Structured Wall Pipes (krah) CSA April 03, 2023
290.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-197_ Material Submittal - Fire Pump Review CSA April 03, 2023
291.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-119 - Non-Conformance Report (NCR) 004 CSA April 03, 2023
292.0 No. Transmittal; copy sent Through Email Safety Walk Findings (#9)- Mar. 10 2023 .docx.xlsx CSA April 03, 2023
293.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-198_ Safety Walk Finding 009 March 10 2023.pdf CSA April 03, 2023
294.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-PQD-001_2.xlsx CSA April 03, 2023
295.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-196_ Security Survey and Risk Assessment.pdf CSA April 03, 2023
296.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-007_0_FF.xlsx CSA April 03, 2023
297.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-194_ SD - Site Fence Stationing Layout .pdf CSA April 03, 2023
298.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-WR-LEED-011_0.xlsx CSA April 04, 2023
299.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-190_ Leed Weekly Report11 Review.pdf CSA April 04, 2023
300.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-WR-LEED-011- ECOS-COMMENTS.pdf CSA April 04, 2023
301.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-051_0.xlsx CSA April 04, 2023
302.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-052_0.xlsx CSA April 04, 2023
303.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-201 MT Coarse Aggr. & Crush Aggregate Base Course .pdf CSA April 04, 2023
304.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-191 SD - UG Water Tanks R3 Review CSA April 04, 2023
305.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-199 Civil ITPs Approval CSA April 04, 2023
306.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-199 Civil ITPs Approval _2 CSA April 04, 2023
307.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-200 MT Sand S1 (Sand bedding for Warehouse, Dock Slab CSA April 04, 2023
308.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-202 MEPF MS, ITP's MECHANICAL April 04, 2023
309.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-007_0_FF.xlsx CSA April 05, 2023
310.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-194_ SD - Site Fence Stationing Layout .pdf CSA April 05, 2023
311.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-033_0.xlsx CSA April 05, 2023
312.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-049-0.xlsx CSA April 05, 2023
313.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-208_ Material Submittal for Electrical Fittings & Acc. .pdf ELECTRICAL April 05, 2023
314.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-201_ MT Coarse Aggr. & Crush Aggregate Base Course CIVIL April 05, 2023
315.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-203_ Response to Instruction on Unsuitable Embarkment CIVIL April 05, 2023
316.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-204 - lighting and grounding sysytem ELECTRICAL April 05, 2023
317.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-205_ Temporary canal drainage system for ponding areas CIVIL April 05, 2023
318.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-208_ MT Polyethelene Backer Rod (Use for Joints) - Sparkton CSA April 05, 2023
319.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-209_ Provide Temporary Prop Support at Midspan of Steel Decking CSA April 11, 2023
320.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-210_ MT Burnish Slab with Hardener (Aquron 1000) CSA April 11, 2023
321.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-211_ Handover of Area (GL D-G_11-23) CSA April 11, 2023
322.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-212_ SD - Wash Bay Layout R1 Review.pdf CSA April 11, 2023
323.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-120 - RFI 12 - Utility Area Concrete Column Elevation CSA April 11, 2023
324.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-008_rev.3 CSA April 11, 2023
325.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-215 - Proposed Car _ Motorbike Parking Canopies Removal CSA April 12, 2023
326.0 No. Transmittal; copy sent Through Email Electrical Drawings - Related Dock Leveler.pdf CSA April 14, 2023
327.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-219_ Dock Leveler Pit Dimension.pdf CSA April 14, 2023
328.0 No. Transmittal; copy sent Through Email Electrical Drawings - Related Dock Leveler.pdf CSA April 14, 2023
329.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-219_ Dock Leveller Dimension & EL Provision.pdf CSA April 14, 2023
330.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-214_ RFI-10 Roof Slab Elevation of Underground Tank and Side Walk Elev.pdf CSA April 14, 2023
331.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RFI-010_reply.pdf CSA April 14, 2023
332.0 No. Transmittal; copy sent Through Email 2790300-CA-2032 r2 pavement joint layout sheet 2of4.pdf CSA April 14, 2023
333.0 No. Transmittal; copy sent Through Email 2790300-CA-2034 r2 pavement joint layout sheet 4of4..pdf CSA April 14, 2023
334.0 No. Transmittal; copy sent Through Email 2790300-CA-4013 _R4f FOR MANHOLE AND PIPE TABLE edit.pd CSA April 14, 2023
335.0 No. Transmittal; copy sent Through Email 2790300-CG-2014 R2 SITEWIDE ROAD NETWORK SETOUT POINTS.pdf CSA April 14, 2023
336.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-213_ RFI-11Proposed Invert Elevation at Drainage Manhole.pdf CSA April 14, 2023
337.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-220_ MT Storm Proof Louver ReviewA CSA April 14, 2023
338.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-050_ Approved with comments_12Apr23 CSA April 14, 2023
339.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-050_ Approved with comments_12Apr23 CSA April 14, 2023
340.0 No. Transmittal; copy sent Through Email AA-3600 (FIRE SEPARATION PLAN) rev0.pdf CSA April 14, 2023
341.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-126 - RFI 09 - Steel Fireproofing.pdf CSA April 14, 2023
342.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-125 - RFI 13 - Main Office Building Elevation CSA April 14, 2023
343.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-RFI-013-0 Main Office Building Elevations_ff Comments CSA April 14, 2023
344.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-124 - MT for Metal Deck CSA April 14, 2023
345.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-MT-008-0 METAL DECK CSA April 14, 2023
346.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-216 - MEPFS (Document) WIR_MIR ATTACHMENTS CSA April 14, 2023
347.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-217_ MT Pipes and Fittings, PVC Blue _ HDPE CSA April 14, 2023
348.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-218_ Comments on MEP Material Submittals CSA April 14, 2023
349.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-122- Calc.Purlins and Girt Design Review CSA April 14, 2023
350.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-123- Calculation - Main Office Connection CSA April 14, 2023
351.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-022_by FF.xlsx CSA April 24, 2023
352.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-232_ Isolation Joint at Columns Walls of Slab CSA April 24, 2023 4/25/2023 RESPONDED
353.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-022.pdf CSA April 24, 2023
354.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-023_by FF.xlsx CSA April 24, 2023
355.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-231_ SD - Joint Pavement Plan Layout (sheet 1 to 4) CSA April 24, 2023
356.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-021_by FF.pdf CSA April 24, 2023
357.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-230_ SD - Truss to Concrete Beam Connection Det. @ G CSA April 24, 2023
358.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-021_rev.1_Sheet 1 of 2.pdf CSA April 24, 2023
359.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-021_rev.1_Sheet 2 of 2.pdf CSA April 24, 2023
360.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-006_0.xlsx CSA April 25, 2023
361.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-023_ Comment to Various Material Submittals CSA April 25, 2023
362.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-006.pdf CSA April 25, 2023
363.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-004_by FF.xlsx CSA April 25, 2023
364.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-229_ SD -Utilities Bldg. Wall Finishes&Stifener CSA April 25, 2023
365.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-014_0.xlsx CSA April 25, 2023
366.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-233_ ITP & MS Roughing-in Works CSA April 25, 2023
367.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-013 - ITP for Roughing-in Works PVC CSA April 25, 2023
368.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-014 - Method Statement for Roughing-in Works PVC CSA April 25, 2023
369.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-228_ Required FDT Result for Unsuitable Soil CSA April 26, 2023
370.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-LTR-061.pdf CSA April 26, 2023
371.0 No. Transmittal; copy sent Through Email SGI-SLF-BSP-CI-334- Unsuitable Soil at SOLID LF Project CSA April 26, 2023
372.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-035_0.xlsx CSA April 26, 2023
373.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-225_ MT Automatic Transfer Switch(LJ) ELECTRICAL April 26, 2023
374.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-035_ Approved with comments_18Apr23 CSA April 26, 2023
375.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC- SD-EL-002_1.xlsx CSA April 26, 2023
376.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-224_ SD Lighting Arrester & Grounding Instal Det CSA April 26, 2023
377.0 No. Transmittal; copy sent Through Email 20230403_ LF_LOGISTICS_BATINO_LEED_Site_Inspection_Report_r9 CSA April 26, 2023
378.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-223_ ESI Leed Inspection Report No.9 _April 2023 CSA April 26, 2023
379.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-CAL-018_0.xlsx CSA April 26, 2023
380.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-CAL-019_0.xlsx CSA April 26, 2023
381.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-130- CAL-18 Outbound & Cal 19 Inbound Connection CSA April 26, 2023
382.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-CAL-011_0.xlsx CSA April 26, 2023
383.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-128- Cal. 11- Ambient TC Brace Connection Detail R1 Review CSA April 26, 2023
384.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-222_ GuardHouse (Elec. Installation) CSA April 26, 2023
385.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-226_ MOM MW CONTRACTORS COORDINATION No.24 CSA April 26, 2023
386.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-227_ Non-Conformance Report (NCR) 003 CSA April 26, 2023
387.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-127- Cal. 10 - Vas Mezzanine Steel Connections R2 Review CSA April 26, 2023
388.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-131- Comments ~Amsteel Plate Thickness & Welding CSA April 26, 2023
389.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-057_0.xlsx CSA 5/52023
390.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-239_ MT Grounding Materials (Kunwell) ELECTRICAL 5/52023
391.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-057_ ESI Comments CSA 5/52023
392.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-GEN-003 .xlsx CSA 5/52023
393.0 No. Transmittal; copy sent Through Email Master Document Register Format.xlsx CSA 5/52023
394.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-249 - Response to Submitted MDR CSA 5/52023
395.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-011_0.xlsx CSA 5/52023
396.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-241_ MS Plumbing and Sanitary Instalaltion PLUMBING 5/52023
397.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-011 - Commented CSA 5/52023
398.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-024.xlsx CSA 5/52023
399.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-245 - SD-Typ. Rebar Layout for Slab on Grade MW CSA 5/52023
400.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-023_by FF_r1.xlsx CSA 5/52023
401.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-244_ SD - Joint Pavement Plan Layout R1 (sheet 1 to 4) CSA 5/52023
402.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-024_FF.xlsx CSA 5/52023
403.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-253 - SD-Typ. Rebar Layout for Slab on Grade MW R1.pdf SD-Typ. Rebar Layout for Slab on Grade MW R1 CSA 5/52023
404.0 No. Transmittal; copy sent Through Email AA-0102 R1.pdf CSA 5/52023
405.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-MS-10-0_0.xlsx CSA 5/52023
406.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-133 - MS Installation Main Office Building CSA 5/52023
407.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-243_ MOM MW CONTRACTORS COORDINATION No.25 CSA 5/52023
408.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-246 - Access for BSP Slope Protection Works CSA 5/52023
409.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-247 - Additional foundation at Admin Building CSA 5/52023
410.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-248_ Non-Conformance Report (NCR) 005 CSA 5/52023
411.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-251_ Hand Over of Area (GL D-G_23-35) CSA 5/52023
412.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-252_ Final report of level and flatness CSA 5/52023
413.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-252_ Final report of level and flatness _2 CSA 5/52023
414.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-254 - SD - Det. Con. of Ret. Wall RW02 to Dock Slab on Grade R1 CSA 5/52023
415.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-255 - Material Submittal for Steel Fiber 4D (Flextools) CSA 5/52023
416.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-134- CAL-018 _ 19 Inbound _ Outbound Con CSA 5/52023
417.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-001_ Revised _ Resubmit_28Apr23 CSA 5/52023
418.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-057_0.xlsx ELECTRICAL May 08, 2023
419.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-239_ MT Grounding Materials (Kunwell) ELECTRICAL May 08, 2023
420.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-057_ ESI Comments ELECTRICAL May 08, 2023
421.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SCH-002_2_by FF.xlsx MECHANICAL May 08, 2023
422.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-237_ Impacted Schedule of Solid LF Project Comments MECHANICAL May 08, 2023
423.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-012.xlsx CIVIL May 08, 2023
424.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-236_ MS Pavement of Truck , CarPark.& Ped CIVIL May 08, 2023
425.0 No. Transmittal; copy sent Through Email 2790300-ESS-SPC-001-REV1.pdf ELECTRONICS May 08, 2023
426.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-235_ Electronic Safety & Security Spec ELECTRONICS May 08, 2023
427.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-004.xlsx ELECTRONICS May 08, 2023
428.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-234_ SD GH B Power Layout, A, B & C ELV Layout ELECTRONICS May 08, 2023
429.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-004_ Revised & Resubmit_24Apr23 ELECTRONICS May 08, 2023
430.0 No. Transmittal; copy sent Through Email Revised & Resubmit_24Apr23.pdf ELECTRONICS May 08, 2023
431.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-241_ MS Plumbing and Sanitary Instalaltion PLUMBING May 08, 2023
432.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-011 - Commented PLUMBING May 08, 2023
433.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-131- Comments ~Amsteel Plate Thickness & Welding STRUCTURAL May 08, 2023
434.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-132- Cal. 11- Ambient TC Brace Connection Detail R1 Review STRUCTURAL May 08, 2023
435.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-238_ Non-Conformance Report (NCR) 004 STRUCTURAL May 08, 2023
436.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-256 - Stop of Construction Works on SOG STRUCTURAL May 08, 2023
437.0 No. Transmittal; copy sent Through Email SGI-CON-MW-MOM-QAQC-002 - QAQC Coordination Meeting STRUCTURAL May 09, 2023
438.0 No. Transmittal; copy sent Through Email SGI-CON-MW-MOM-QAQC-003 - QAQC Coordination Meeting STRUCTURAL May 09, 2023
439.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-258_ QAQC Coordination Meeting Nos. 002 & 003 STRUCTURAL May 09, 2023
440.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-023_by FF_r2.xlsx STRUCTURAL May 09, 2023
441.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-260_ SD - Joint Pavement Plan Layout R2 (sheet 1 to 4) STRUCTURAL May 09, 2023
442.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-023_rev.2_ Sheet 3 of 4_wth FF comments_grid F Error STRUCTURAL May 09, 2023
443.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-004_by FF 1 STRUCTURAL May 09, 2023
444.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-242_ SD -Utilities Building Wall Finishes & Precast R1 STRUCTURAL May 09, 2023
445.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-004_rev.1_Sheet 1 of 3_FF comments STRUCTURAL May 09, 2023
446.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-004_rev.1_Sheet 2 of 3_FF comments STRUCTURAL May 09, 2023
447.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-004_rev.1_Sheet 3 of 3by FF CSA May 09, 2023
448.0 No. Transmittal; copy sent Through Email SGI-SLF-ATC-169 Advive to client regarding dock Canopies CSA May 15, 2023
449.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-297_ Non-Conformance Report (NCR) 008 CSA May 17, 2023
450.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-NCR-008.pdf CSA May 17, 2023
451.0 No. Transmittal; copy sent Through Email SCIC-Solid LF-SCH- Impacted Project Schedule-Rev 3 CSA May 17, 2023
452.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-294_ I mpacted Schedule R3 Review CSA May 17, 2023
453.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-293_ HO Area (GL A-D_33-39_D-G_35-39) CSA May 17, 2023
454.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-295_ Submission of Shop Drawings, MS, and Materials CSA May 17, 2023
455.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-296_ Non-Conformance Report (NCR) 007 CSA May 17, 2023
456.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-298_ MEPFS Submittal Requirements MECHANICAL May 17, 2023
457.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-299_ MT Transformer (Cooper) Cast Resin R1 ELECTRICAL May 17, 2023
458.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-304 - MT Lightning Arrester (Erico) Review_ ELECTRICAL May 17, 2023
459.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-305 - MT Units of Diesel Engine Generator Review_ ELECTRICAL May 17, 2023
460.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-306 - Payment Certificate Control Number ELECTRICAL May 17, 2023
461.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-307_ MOM MW CONTRACTORS COORDINATION No.27 May 17, 2023
462.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-137 - Material Submittal for Downspout PLUMBING May 17, 2023
463.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-138 - Downspout Clean-out at base PLUMBING May 17, 2023
464.0 Thru USB given by the PTDC DC SGI-CON-MW-SCIC-CI-309 IFC Electronic Design Drawings ELECTRONICS May 19, 2023
465.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-OTH-017.pdf CIVIL May 22, 2023
466.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-380.pdf CIVIL May 22, 2023
467.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-017_0.xlsx CIVIL May 22, 2023
468.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-311 - MS Determining Floor Flatness and Floor Levelness CIVIL May 22, 2023
469.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-017 Beca comments.pdf CIVIL May 22, 2023
470.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-317_ SD - Joint Pavement Plan Layout R3 (sheet 1 to 4) CIVIL May 22, 2023
471.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-023_rev.3_Sheet 1 of 4.pdf CIVIL May 22, 2023
472.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-023_rev.3_Sheet 2 of 4.pdf CIVIL May 22, 2023
473.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-023_rev.3_Sheet 3 of 4.pdf CIVIL May 22, 2023
474.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-023_rev.3_Sheet 4 of 4.pdf CIVIL May 22, 2023
475.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-005_0.xlsx CIVIL May 22, 2023
476.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-322_ S D Outbound Dock Office Power Layout Review CIVIL May 22, 2023
477.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-004_2.pdf CIVIL May 22, 2023
478.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-004_2.xlsx CIVIL May 22, 2023
479.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-321_ SD GH B Power Layout, A, B & C ELV Layout R2 ELECTRICAL May 22, 2023
480.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-004 _2-Commented.pdf May 22, 2023
481.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-138 - Downspout Clean-out at base PLUMBING May 22, 2023
482.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-287 - Deletion of CFRP Tanks PLUMBING May 22, 2023
483.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-296_ Non-Conformance Report (NCR) 007 PLUMBING May 22, 2023
484.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-308 - SD Partial Outbound Toilet Plumbing Layout R1 PLUMBING May 22, 2023
485.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-309 IFC Electronic Design Drawings ELECTRONICS May 22, 2023
486.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-312 - MT Cable & Wires Review ELECTRONICS May 22, 2023
487.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-313 - Response to RFI 15 (PABX)& 16(CCTV Sys. ELECTRONICS May 22, 2023
488.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-314 - MEPFS Procurement - Long Lead Mat ELECTRONICS May 22, 2023
489.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-315 - MEPFS-Electrical USAGE OF APPROVED SPECIFIED MATERIALS ELECTRONICS May 22, 2023
490.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-317_ SD - Joint Pavement Plan Layout R3 (sheet 1 to 4) CIVIL May 22, 2023
491.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-318_ MT Sand S1(RA Aguila Enterprise) Review CIVIL May 22, 2023
492.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-319_ MT Diesel Engine Stanby Generator Sets (Mitsubishi) ELECTRICAL May 22, 2023
493.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-320_ SD for Sanitary Plan Outside Utilities ELECTRICAL May 22, 2023
494.0 No. Transmittal; copy sent Through Email 2790300-FP-SPC-001-Rev2 FIRE PRO May 24, 2023
495.0 No. Transmittal; copy sent Through Email 2790300-PLG-SPC-001-Rev1 PLUMBING May 24, 2023
496.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-069_0.xlsx PLUMBING May 24, 2023
497.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-069.pdf PLUMBING May 24, 2023
498.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-397.pdf PLUMBING May 24, 2023
499.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-046_1.pdf ELECTRICAL May 24, 2023
500.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-319_ MT Diesel Engine Stanby Generator Sets ELECTRICAL May 24, 2023
501.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-046_rev.1_commented.pdf ELECTRICAL May 24, 2023
502.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-009_0.xlsx ELECTRICAL May 24, 2023
503.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-329_ SD for Main Office Level 1 Power Layout ELECTRICAL May 24, 2023
504.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-008_0.xlsx ELECTRICAL May 24, 2023
505.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-328_ SD for Site Development Outdoor Lighting Layout ELECTRICAL May 24, 2023
506.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-007_0.xlsx ELECTRICAL May 24, 2023
507.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-327_ SD for Site Development CCTV Layout Review ELECTRONICS May 24, 2023
508.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-006_0.xlsx ELECTRONICS May 24, 2023
509.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-326_ SD for Duct Bank Layout Review ELECTRICAL May 24, 2023
510.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-006_Sheet 1 of 3_commented.pdf ELECTRICAL May 24, 2023
511.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-006_Sheet 2 of 3_commented.pdf ELECTRICAL May 24, 2023
512.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-006_Sheet 3 of 3_commented.pdf ELECTRICAL May 24, 2023
513.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-323_ MT Gold Crete GP-G (GCCI) Review STRUCTURAL May 24, 2023
514.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-064.pdf STRUCTURAL May 24, 2023
515.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-331_ Typ. Chainlink Fence Detail for North & East Side R1 STRUCTURAL May 24, 2023
516.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-008_rev.1.pdf STRUCTURAL May 24, 2023
517.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-330_ ITP-14 Storm Water Drainage using SW Pipe CIVIL May 24, 2023
518.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-014.pdf May 24, 2023
519.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-MS-018_0 AS.xlsx May 24, 2023
520.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-342 - Method Statement for Installation of Fire Protection FIRE PRO May 24, 2023
521.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-137 - Material Submittal for Downspout PLUMBING May 24, 2023
522.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-MT-013-0 - MT - Downspout PLUMBING May 24, 2023
523.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-MO-17-0_FF.xlsx May 24, 2023
524.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-139 - Main Office - Steel Deck Layout STRUCTURAL May 24, 2023
525.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-MO-017 Steel Deck Layout STRUCTURAL May 24, 2023
526.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-MO-018 Steel Deck Layout STRUCTURAL May 24, 2023

527.0 No. Transmittal; copy sent Through Email EPC-TQ-026_ Wall Mounted Convenience Outlet at Warehouse_replied_24May23 ELECTRICAL May 24, 2023

528.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-289 - Ambient Warehouse Installation of Power Outlet ELECTRICAL May 24, 2023
529.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-324_ ITP-15 Underground Utility Piping Review ELECTRICAL May 24, 2023
530.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-325_ MS Underground Utility Piping Review ELECTRICAL May 24, 2023
531.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-332_ Isolation Joint at Columns Walls of Slab R1 STRUCTURAL May 24, 2023
532.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-334_ SD -Sanitary Plumbing in AO F_M Toilet PLUMBING May 25, 2023
533.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-340_ MT Cyclone Wire (3.2 mm) for Chainlink Fence STRUCTURAL May 25, 2023
534.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-343 - Material Submittal for 8mm Deformed Steel Rebars STRUCTURAL May 25, 2023
535.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-344 - MEPF-Electronics-CCTV ELECTRONICS May 25, 2023
536.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-140 - Top of Concrete Levels on 2nd Floor Admin Block STRUCTURAL May 25, 2023
537.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-339_ MT Automatic Transfer Switch (Poweredege Solution) ELECTRICAL May 25, 2023
538.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-067_Approved_23May23.pdf ELECTRICAL May 25, 2023
539.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-338_ MT Automatic Transfer Switch(LJ) R1 ELECTRICAL May 25, 2023
540.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-035_rev.1.pdf ELECTRICAL May 25, 2023
541.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-337_ MT Polymer Modified Skim Coat GOLDCOAT SF 515 CSA May 25, 2023
542.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-063 CSA May 25, 2023
543.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-001_1 (Sht 1 -4).xlsx CSA May 25, 2023
544.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-336_ SD for Electrical & Auxiliary R1 Review ELECTRICAL May 25, 2023
545.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-003_1.xlsx ELECTRICAL May 25, 2023
546.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-335_ Guard House A & C Power Layout R1 ELECTRICAL May 25, 2023
547.0 No. Transmittal; copy sent Through Email Drawing Reference ELECTRICAL May 25, 2023
548.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-334_ SD -Sanitary Plumbing in AO F&M Toilet PLUMBING May 25, 2023
549.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-017_1.xlsx PLUMBING May 25, 2023
550.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-341 - MS Determining Floor Flatness & Floor Levelness R1 STRUCTURAL May 25, 2023
551.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-017_rev.1 Beca comments. STRUCTURAL May 25, 2023
552.0 No. Transmittal; copy sent Through Email AA-3145 IFC REV2 CSA May 25, 2023
553.0 No. Transmittal; copy sent Through Email AA-3146 IFC REV2 CSA May 25, 2023

554.0 No. Transmittal; copy sent Through Email EPC-TQ-023_ MS for repair of damaged paint on steel structures_replied_25May23 STRUCTURAL May 25, 2023

555.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-PRD-003-0 - Coating Touch-up Procedure.pdf MS for repair of damaged paint on steel structures_replied_25May23 STRUCTURAL May 25, 2023

556.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-346_ Fire Protection Specification FIRE PRO May 30, 2023
557.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-347_ Plumbing Project Specification PLUMBING May 30, 2023
558.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-350 - NCR No. 2 Closed PLUMBING May 30, 2023
559.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-058_ Reticulation Piping System FIRE PRO May 30, 2023
560.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-058_ Reticulation Piping System_2 FIRE PRO May 30, 2023
561.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-080.pdf FIRE PRO May 30, 2023
562.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-416.pdf FIRE PRO May 30, 2023
563.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-012_0.xlsx FIRE PRO May 30, 2023
564.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-349 - SD Equipment Layout Review FIRE PRO May 30, 2023
565.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-016.xlsx FIRE PRO May 30, 2023
566.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-348 -ITP 16 - Fire Protection System Review.pdf FIRE PRO May 30, 2023
567.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-076_0.xlsx FIRE PRO May 30, 2023
568.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-355 - Fire Protection (Valves) - LEDE FIRE PRO May 30, 2023
569.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-076-commented.pdf FIRE PRO May 30, 2023
570.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-077_0.xlsx FIRE PRO May 30, 2023
571.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-354 - MT Fire Protection (Sprinkler Heads) - Vikings FIRE PRO May 30, 2023
572.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-PQD-006_0.xlsx FIRE PRO May 30, 2023
573.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-353- PQD Plumbing & Electrical Works FIRE PRO May 30, 2023
574.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-PQD-007_0.xlsx FIRE PRO May 30, 2023
575.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-352- PQD Fire Protection Works FIRE PRO May 30, 2023
576.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-PQD-005_0.xlsx FIRE PRO May 30, 2023
577.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-351 - PQD Mechanical Works Almajay Enterprise INC Review FIRE PRO May 30, 2023
578.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-PQD-005 R0-Commented FIRE PRO May 30, 2023
579.0 No. Transmittal; copy sent Through Email AA-3100 IFC REV2.pdf FIRE PRO May 30, 2023
580.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-059_ Racking System FIRE PRO May 30, 2023
581.0 No. Transmittal; copy sent Through Email Project Optimus - Main, Inbound and Outbound Test-Fit CSA May 30, 2023
582.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-361 - Groove for Perimeter Fence at South Side CSA June 02, 2023
583.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-363 - Safety Walk Finding No.12 (Closed Out) June 02, 2023
584.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-075_0.xlsx STRUCTURAL June 02, 2023
585.0 No. Transmittal; copy sent Through Email Screenshot_20230529_022918_Samsung Notes.jpg STRUCTURAL June 02, 2023
586.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-360- MT Terradowel (Maccaferri) STRUCTURAL June 02, 2023
587.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-GEN-003 .xlsx June 06, 2023
588.0 No. Transmittal; copy sent Through Email Master Document Register Format.xlsx June 06, 2023
589.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-249 - Response to Submitted MDR June 06, 2023
590.0 No. Transmittal; copy sent Through Email DRCS-2790300-SE-AB-2140_0.xlsx June 06, 2023
591.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-368 - As Built Outbound Office Building Foundation STRUCTURAL June 06, 2023
592.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-367 - SD - Proposed New Elevation of Partial Par STRUCTURAL June 06, 2023
593.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-014.pdf STRUCTURAL June 06, 2023
594.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-366_ ITP Fire Protection Sys. R1 Review FIRE PRO June 06, 2023
595.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-016_rev.1 FIRE PRO June 06, 2023
596.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-017_0 FIRE PRO June 06, 2023
597.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-019_0 FIRE PRO June 06, 2023
598.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-365 - ITP & MS Plastering Works CSA June 06, 2023
599.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-010 (Sheet 1 & 2)_2.xlsx CSA June 06, 2023
600.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-364_ SD - Fence Profile FN 01 North Side Review CSA June 06, 2023
601.0 No. Transmittal; copy sent Through Email SGI-MW-SCSIC-SD-CV-010_rev.2_Sheet 1 of 2_comments.pdf CSA June 06, 2023
602.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIS-SD-AR-009_0.xlsx CSA June 06, 2023
603.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-362 - MO Level 1(Modified M & F Toilet) CSA June 06, 2023
604.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-AR-009_Sheet 1 of 2 - Commented.pdf CSA June 06, 2023
605.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-075_0.xlsx CSA June 06, 2023
606.0 No. Transmittal; copy sent Through Email Screenshot_20230529_022918_Samsung Notes.jpg CSA June 06, 2023
607.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-360- MT Terradowel (Maccaferri) STRUCTURAL June 06, 2023
608.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-075 STRUCTURAL June 06, 2023
609.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-379 - MT Fire Protection (Seamless Pipe) - MECH ZHONGQ FIRE PRO June 06, 2023
610.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-079-Commented FIRE PRO June 06, 2023
611.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-010_0.xlsx FIRE PRO June 06, 2023
612.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-378 - SD-BA13 Guardrail at Exterior Review_ CSA June 06, 2023
613.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-012 _0.xlsx CSA June 06, 2023
614.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-375 - SD - Proposed Storm Drainage Layout PLUMBING June 06, 2023
615.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-371_ MS Pavement of Truck , CarPark.& Ped R1 CIVIL June 06, 2023
616.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-012.pdf CIVIL June 06, 2023
617.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-018_0.xlsx CIVIL June 06, 2023
618.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-374 - ITP UG Elec.& Comm. Piping ELECTRICAL June 06, 2023
619.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-018_Commented ELECTRICAL June 06, 2023
620.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-020_0.xlsx ELECTRICAL June 06, 2023
621.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-373- MS UG Electrical& Comm. Pipings ELECTRICAL June 06, 2023
622.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-020 R0-commented ELECTRICAL June 06, 2023
623.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC- SD-EL-010_0.xlsx ELECTRONICS June 06, 2023
624.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-372 - Cable Tray Layout ELECTRONICS June 06, 2023
625.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-010 R0 - Commented ELECTRONICS June 06, 2023
626.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-371_ MS Pavement of Truck , CarPark.& Ped R1 CIVIL June 06, 2023
627.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-012.pdf CIVIL June 06, 2023
628.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-380 - MT Chilled Water Pump - ETANORM MECHANICAL June 06, 2023
629.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-081._Commented MECHANICAL June 06, 2023
630.0 No. Transmittal; copy sent Through Email AA-3145 IFC REV2.pdf CSA June 06, 2023
631.0 No. Transmittal; copy sent Through Email AA-3146 IFC REV2.pdf CSA June 06, 2023
632.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-140 - Top of Concrete Levels on 2nd Floor Admin Block CSA June 06, 2023
633.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-142 - Various RFIs Response June 06, 2023
634.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-RFI-016 - Commented.pdf June 06, 2023
635.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-RFI-018 - Commented.pdf June 06, 2023
636.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-RFI-019 - Commented.pdf June 06, 2023
637.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-MS-15-0_0.xlsx June 06, 2023
638.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-143- MS Inst. Ceiling Support Framing & Ceiling Panels STRUCTURAL June 06, 2023
639.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-MS-012-0_Commented - CP.pdf STRUCTURAL June 06, 2023
640.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-CAL-023_0 .xlsx STRUCTURAL June 06, 2023
641.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-CAL-024_0.xlsx STRUCTURAL June 06, 2023
642.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-141 - Comments to Various Claculations STRUCTURAL June 06, 2023
643.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-CAL-023_0-Commented STRUCTURAL June 06, 2023
644.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-CAL-024_0-Commented STRUCTURAL June 06, 2023
645.0 No. Transmittal; copy sent Through Email EPC-TQ-027_ Possible Conflict or Clashing between Storm Drain and Pavement PLUMBING June 06, 2023
646.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-003_rev.1 PLUMBING June 06, 2023
647.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-017_2 - Commented June 06, 2023
648.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-357 - MT Diesel Engine Standby Gen. Sets (Mitsubishi) MECHANICAL June 06, 2023
649.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-359_ SD Storm Drain UGPiping Layout and Det R1 PLUMBING June 06, 2023
650.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-369- Revised LEED Site Inspection Report No. 10 for May 2023 June 06, 2023
651.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-370_ HAND OVER OF AREA (GL E1-E3_EO-FD) June 06, 2023
652.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-376 - MT Fire Pro. (Mechl Coupling&Fittings)-LEDE FIRE PRO June 06, 2023
653.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-377 - MT Lightning Arrester (Erico) R1 Review_ ELECTRICAL June 06, 2023
654.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-144_ Steel Erection Works on Outbound Building STRUCTURAL June 06, 2023
655.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-060_ Re-layout of Female and Male Toilets CSA June 06, 2023
656.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-061_ Design Change on Floor Mounted Convenience Outlets to Wall Mounted ELECTRICAL June 06, 2023
657.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-062_ Usage of Proximity Sensor Fixtures ELECTRONICS June 06, 2023
658.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-078 ELECTRONICS June 06, 2023
737.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-355 - Fire Protection (Valves) - LEDE FIRE PRO June 07, 2023
738.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-078_Commented(ESI) FIRE PRO June 07, 2023
739.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-015_0.xlsx STRUCTURAL June 07, 2023
740.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-386 - SD-GA03 Manual Access Swing Tubular Door STRUCTURAL June 07, 2023
741.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-013_0.xlsx STRUCTURAL June 07, 2023
742.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-384 - SD - BO02 Internal Bollard STRUCTURAL June 07, 2023
743.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-011_0.xlsx CSA June 07, 2023
744.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-383 - SD-BA13 and GA03 Guardrail at Interior CSA June 07, 2023
745.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-382_ MEPF Coordination Meeting Nos. 006 MECHANICAL June 07, 2023
746.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-394 - response to LTR-77 Misalignment of Ret. Wall STRUCTURAL June 09, 2023
747.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-LTR-077.pdf STRUCTURAL June 09, 2023
748.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-091_0.xlsx ELECTRICAL June 09, 2023
749.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-393 - MT Dampers & Mettalic Conduit Review ELECTRICAL June 09, 2023
750.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-091_ESI Commented ELECTRICAL June 09, 2023
751.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-093_ESI Commented ELECTRICAL June 09, 2023
752.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-094_0.xlsx ELECTRICAL June 09, 2023
753.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-392 - MT Fire Suppression Products & Acce. (ANAKO) FIRE PRO June 09, 2023
754.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-094_ESI Commented.pdf FIRE PRO June 09, 2023
755.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-090_0.xlsx FIRE PRO June 09, 2023
756.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-395 MT Fire Suppression Products & Acce. (ANAKO) FIRE PRO June 09, 2023
757.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-396 Passenger Elevator Requirements and Details ELECTRONICS June 09, 2023
758.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-391 ELECTRONICS (AutoRecovered) ELECTRONICS June 09, 2023
759.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-084_0.xlsx ELECTRONICS June 09, 2023
760.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-085_0.xlsx ELECTRONICS June 09, 2023
761.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-086_0.xlsx ELECTRICAL June 09, 2023
762.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-388 MT Duct Sealant_ Cooper Tube&Fittings_Rubber Ins ELECTRICAL June 09, 2023
763.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-390_ SD for Electrical & Auxiliary R2 Review ELECTRICAL June 09, 2023
764.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_1 OF 7_Rev2 ELECTRICAL June 09, 2023
765.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_2 OF 7_Rev2 ELECTRICAL June 09, 2023
766.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_3 OF 7_Rev2 ELECTRICAL June 09, 2023
767.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_4 OF 7_Rev2 ELECTRICAL June 09, 2023
768.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_5 OF 7 ELECTRICAL June 09, 2023
769.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_6 OF 7 ELECTRICAL June 09, 2023
770.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_7 OF 7 ELECTRICAL June 09, 2023
771.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-145 - Additional Column and Support for Cladding and Louver ELECTRICAL June 09, 2023
772.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-015_0.xlsx ELECTRICAL June 09, 2023
773.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-389 - GA03 Manual Access Swing Tubular Door.pdf ELECTRICAL June 09, 2023
774.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-084_0.xlsx ELECTRICAL June 09, 2023
775.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-085_0.xlsx ELECTRICAL June 09, 2023
776.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-388 - MT Duct Sealant_ Cooper Tube&Fittings_Rubber Ins ELECTRICAL June 09, 2023
777.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-017_2.xlsx ELECTRICAL June 09, 2023
778.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-381 - MS Determining Floor Flatness & Floor Levelness R2 STRUCTURAL June 09, 2023
779.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-017_2 - Commented.pdf STRUCTURAL June 09, 2023
780.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-014_0.xlsx STRUCTURAL June 09, 2023
781.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-385 -S D-DG01 Goal Post Protection Bollard STRUCTURAL June 09, 2023
782.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-390_ SD for Electrical & Auxiliary R2 Review ELECTRONICS June 13, 2023
783.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_1 OF 7_Rev2 ELECTRONICS June 13, 2023
784.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_2 OF 7_Rev2 ELECTRONICS June 13, 2023
785.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_3 OF 7_Rev2 ELECTRONICS June 13, 2023
786.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_4 OF 7_Rev2 ELECTRONICS June 13, 2023
787.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_5 OF 7 ELECTRONICS June 13, 2023
788.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_6 OF 7 ELECTRONICS June 13, 2023
789.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-001_7 OF 7 ELECTRONICS June 13, 2023
790.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-399 Racking System CSA June 13, 2023
791.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-059 AA-3100 IFC REV2.pdf CSA June 13, 2023
792.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-397 Sample of Expansion Joint Cover STRUCTURAL June 13, 2023
793.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-398 Material Submittal for Cables and Wires (Duraflex) ELECTRICAL June 13, 2023
794.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-400 MS UG Electrical_ Comm. Pipings R1 ELECTRICAL June 13, 2023
795.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-401 MT for Fire Protection- ZHONQI Rev.01 FIRE PRO June 13, 2023
796.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-402 Leed Coordination Meeting No. 7 MECHANICAL June 13, 2023
797.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-063_ Design of the Additional Steel Columns and Louver Walls CSA June 13, 2023
798.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-415 MT Diesel Engine Standby Gen Sets(SAONAN) FIRE PRO June 15, 2023
799.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-083_0.xlsx FIRE PRO June 15, 2023
800.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-414 MT (Fire Pro(Strut Framing Support System) KO FIRE PRO June 15, 2023
801.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-082_ Disapproved_08June23 FIRE PRO June 15, 2023
802.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-097_0.pdf FIRE PRO June 15, 2023
803.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-410 FIRE PRO June 15, 2023
804.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-097 ESI Commented FIRE PRO June 15, 2023
805.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-412 Passenger Elevator Requirement and Details. MECHANICAL June 15, 2023
806.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-413 MS-ITP-SHOP DWG-ELECTRICAL ELECTRICAL June 15, 2023
807.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-146 Structural Width Dimension of Louver at Ambient Warehouse CSA June 15, 2023
808.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-409 - MT Flexible Duct (PIPFLEX) Review.pdf ELECTRICAL June 20, 2023
809.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-095_ESI Commented.pdf June 20, 2023
810.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-406 - Blow-Up Plan of Sewage Pump Tank Location.pdf PLUMBING June 20, 2023
811.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-004_0 -Approved.pdf June 20, 2023
812.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-066.xlsx June 20, 2023
813.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-408 - MT Galvanized Iron Sheet for HVAC Ducting (APO).pdf MECHANICAL June 20, 2023
814.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-419 - SD - Ramp 4 Details.pdf MECHANICAL June 20, 2023
815.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-015_Approved.pdf June 20, 2023
816.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-417 - SD Adjusted Layout of P8 on F15 at GL GR3.pdf CSA June 20, 2023
817.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-031_Approved.pdf June 20, 2023
818.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-099_0.xlsx June 20, 2023
819.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-411 - MT Modular Type Aircooled Chiller (Daikin).pdf MECHANICAL June 20, 2023
820.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-099- ESI Comment (NA).pdf June 20, 2023
821.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-410 - Flexible Duct Connector HKV Flush Ancho.pdf MECHANICAL June 20, 2023
822.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-097_ESI Commented.pdf June 20, 2023
823.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-022_0.xlsx June 20, 2023
824.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-426 - MS Instal. of AC and Ventillation Ductworks.pdf MECHANICAL June 20, 2023
825.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-022.pdf June 20, 2023
826.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-425 - Inspection Test Plan for HVAC Duct Work.pdf MECHANICAL June 20, 2023
827.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-019_Approved.pdf June 20, 2023
828.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-002_0.xlsx June 20, 2023
829.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-424 - Main Office Level 1 ELV Layout.pdf ELECTRICAL June 20, 2023
830.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-002 - Commented.pdf June 20, 2023
831.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-FP-001(Sht1-8)_0.xlsx June 20, 2023
832.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-423 - Propose Warehouse Ceiling Level Fire Protection.pdf FIRE PRO June 20, 2023
833.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-FP-001(Sht1-8)_0.xlsx June 20, 2023
834.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-423 - Propose Warehouse Ceiling Level Fire Protection.pdf FIRE PRO June 20, 2023
835.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-065_1.xlsx June 20, 2023
836.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-422 - MT Cable and Wires(Duraflex) R1.pdf ELECTRICAL June 20, 2023
837.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-065_rev.1-ESI Commented.pdf June 20, 2023
838.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-030_0.xlsx June 20, 2023
839.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-421 - Truss Showing Gusset Sizes for Guardhouse B.pdf STRUCTURAL June 20, 2023
840.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-030_0 - Commented.pdf June 20, 2023
841.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-420 - Site Development Outdoor Lighting Layout.pdf ELECTRICAL June 20, 2023
842.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-008_1-Approved.pdf June 20, 2023
843.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-148 -RFI 20 - Catwalk Location and Flooring Materials.pdf CSA June 20, 2023
844.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-RFI-020 - revised comment.pdf June 20, 2023
845.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-405 - MT for Dowel Cradle(Maccaferri) STRUCTURAL June 20, 2023
846.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-407 - MT PVC Solvent Cement Neltex PLUMBING June 20, 2023
847.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-418 - Main Office Level 1 Male&Female Toilet Plumbing Layout CSA June 20, 2023
848.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-147 - Add. Steel Column and Support for Cladding and Louver CSA June 20, 2023
849.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-149 -RFI 17 - Office Roofing and Cladding CSA June 20, 2023
850.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-PL-003_1-FF.xlsx June 21, 2023
851.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-359_ SD Storm Drain UGPiping Layout and Det R1.pdf PLUMBING June 21, 2023
852.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-082_0.xlsx June 21, 2023
853.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-414 - MT (Fire Pro(Strut Framing Support System) KO.pdf FIRE PRO June 21, 2023
854.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-427_ Revised SD for Sanitary Plan Outside Utilities .pdf PLUMBING June 21, 2023
855.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-001_R1_Sheet 4 of 5_Approved.pdf June 21, 2023
856.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-001_R2_Sheet 2 of 5_Approved.pdf June 21, 2023
857.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-433 - Various Material Submittal Review.pdf June 21, 2023
858.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-009_1.xlsx June 21, 2023
859.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-431_ SD MO Level 1 Power Layout R1.pdf ELECTRICAL June 21, 2023
860.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-009_1 - Commented.pdf June 21, 2023
861.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-430_ Guard House A & C Power Layout R2.pdf ELECTRICAL June 21, 2023
862.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-003_2 - Commented.pdf June 21, 2023
863.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-428 - Required QAQC Documents June 21, 2023
864.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-429 - MEPFS Monitoring Documents Requirements MECHANICAL June 21, 2023
865.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-432_ Non-Conformance Report (NCR) 009 June 22, 2023
866.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-435 - Energization Agreement Form ELECTRICAL June 22, 2023
867.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-437 - Sand S1 -Sand Bedding (AguilaEntr) CIVIL June 22, 2023
868.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-438 - MT Warning Tape 3 width Buried Elec.&Comm. Line ELECTRICAL June 22, 2023
869.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-439 - MT Cable and Wires(Duraflex) R2 ELECTRICAL June 22, 2023
870.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-441- MT Quality Star (CHB 8) 4 Hrs Fire Rated CSA June 22, 2023
871.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-064_ Response Design of the Additional Steel Columns and Louver Walls STRUCTURAL June 22, 2023
872.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-022 June 22, 2023
873.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-444 - MT Grounding Materials (Kunwell) R1.pdf ELECTRICAL June 23, 2023
874.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-057_rev.1_approved.pdf ELECTRICAL June 23, 2023
875.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-017_0.xlsx CIVIL June 23, 2023
876.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-443- SD - UG Water Tank Detail Section 1.pdf CIVIL June 23, 2023
877.0 No. Transmittal; copy sent Through Email UNDERGROUND RAINWATER TANK DETAILED SECTION- 1- with FF comments.pdf CIVIL June 23, 2023
878.0 No. Transmittal; copy sent Through Email UNDERGROUND RAINWATER TANK DETAILED SECTION- 2-with FF Comment.pdf CIVIL June 23, 2023
879.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-003.pdf STRUCTURAL June 23, 2023
880.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-004.pdf STRUCTURAL June 23, 2023
881.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-005.pdf STRUCTURAL June 23, 2023
882.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-006.pdf STRUCTURAL June 23, 2023
883.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-007.pdf STRUCTURAL June 23, 2023
884.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-449- SD- Dock Leveller and Finger Dock Plan Details .pdf MECHANICAL June 27, 2023
885.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-029_0 - Commented.pdf MECHANICAL June 27, 2023
886.0 No. Transmittal; copy sent Through Email AA-3141 to 3146_with marked up.pdf MECHANICAL June 27, 2023
887.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-455 - Usage of Proximity Sensor Fixtures.pdf ELECTRONICS June 27, 2023
888.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-MS-018_1 AS.xlsx ELECTRONICS June 27, 2023
889.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-453- MS for Installation of Fire Protection R1 Review.pdf FIRE PRO June 27, 2023
890.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-018_rev.1_17June23.pdf FIRE PRO June 27, 2023
891.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-452- SD - Pedestal P5 on SF10 GL G42.pdf STRUCTURAL June 27, 2023
892.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-017 - REV1-SHOP DRAWING OF PEDESTAL P5 ON SF10 GL.G-42.pdf STRUCTURAL June 27, 2023
893.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-446 - Handover Areas for SOG _ Suspended Slab Works STRUCTURAL June 27, 2023
894.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-447- Clearing of Areas - Scaffoldings CSA June 27, 2023
895.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-448 - Undocumented Works - MEPF Electronics CCTV MECHANICAL June 27, 2023
896.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-450 - Sprinkler Valves Final Locations FIRE PRO June 27, 2023
897.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-454 - Additional Wall Cladding at Dock Area CSA June 27, 2023
898.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-456 - Corrective Action on Retaining Wall at Admin CSA June 27, 2023
899.0 No. Transmittal; copy sent Through Email Division 28 - Section 28 05 28_ Pathway for Electronic Safety & Security.pdf ELECTRONICS June 27, 2023
900.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-103_1.xlsx ELECTRONICS June 27, 2023
901.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-458 - MT Metal Tubing Raceway Conduit R1.pdf ELECTRICAL June 27, 2023
902.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-457 - Various Material Submittal-27June23.pdf MECHANICAL June 27, 2023
903.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-108_0.xlsx MECHANICAL June 27, 2023
904.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-113_0.xlsx MECHANICAL June 27, 2023
905.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-114_0.xlsx MECHANICAL June 27, 2023
906.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-115_0.xlsx MECHANICAL June 27, 2023
907.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-116_0.xlsx MECHANICAL June 27, 2023
908.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-459 - MT Fire Detection and Alarm System FIRE PRO June 27, 2023
909.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-460 - MT Medium Voltage Cables (LIOA) ELECTRICAL June 27, 2023
910.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-106_0 ELECTRICAL June 27, 2023
911.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-FP-001(Sht1-8)_0.xlsx FIRE PRO June 30, 2023
912.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-423 - Propose Warehouse Ceiling Level Fire Protection.pdf FIRE PRO June 30, 2023
913.0 No. Transmittal; copy sent Through Email 20230630-Beca Reviewed-SGI-MW-SCIC-MT-108.pdf MECHANICAL June 30, 2023
914.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-108_0.xlsx MECHANICAL June 30, 2023
915.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-467 - MT Fans and Blowers (Tork Technology) .pdf MECHANICAL June 30, 2023
916.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-468 - MasterSeal 620 (BitumenRubber Latex Emulsion) .pdf CSA June 30, 2023
917.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-120_Approved.pdf CSA June 30, 2023
918.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-102_0.xlsx FIRE PRO June 30, 2023
919.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-465- MT Seamless Pipe for Fire Pro.(Shanghai Bndry).pdf FIRE PRO June 30, 2023
920.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-101_0.xlsx FIRE PRO June 30, 2023
921.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-463- Fire Suppression Products & Acc. ANAKO.pdf FIRE PRO June 30, 2023
922.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-101.pdf FIRE PRO June 30, 2023
923.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-001_0.xlsx MECHANICAL June 30, 2023
924.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-106_0.xlsx MECHANICAL June 30, 2023
925.0 No. Transmittal; copy sent Through Email Low Voltage_Division 26 05 19.pdf ELECTRICAL June 30, 2023
926.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-460 - MT Medium Voltage Cables (LIOA).pdf ELECTRICAL June 30, 2023
927.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-006_1.xlsx ELECTRICAL July 03, 2023
928.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-466 - SD Duct Bank Layout Rev.01.pdf ELECTRICAL July 03, 2023
929.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-006_Rev.01 - Commented.pdf ELECTRICAL July 03, 2023
930.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-115_0.xlsx CSA July 03, 2023
931.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-471 - MT Rockwool Thermal Rock S (Slab) .pdf CSA July 03, 2023
932.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-469 - SD - Main Office Level 1 ELV Layout Review ELECTRONICS July 03, 2023
933.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-470 - MT Fire Detection and Alarm Sys. R1 FIRE PRO July 03, 2023
934.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-472 - MT Industrial Overhead Sectional Doors (LESHO) CSA July 03, 2023
935.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-473- Wire Mesh for Gutters CSA July 03, 2023
936.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-479- SD Typical Details of Pipe Sleeve & Pipe Size Table.pdf PLUMBING July 05, 2023
937.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-011_Approved.pdf PLUMBING July 05, 2023
938.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-012_1.xlsx PLUMBING July 05, 2023
939.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-478- SD Equipment Layout R1 Review.pdf MECHANICAL July 05, 2023
940.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-012_Rev.01 - Commented.pdf MECHANICAL July 05, 2023
941.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-121_0.xlsx MECHANICAL July 05, 2023
942.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-476 - MT Manual Bending UPVC Pipe Conduit (Atlanta).pdf ELECTRICAL July 05, 2023
943.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIS-SD-EL-016_0.xlsx ELECTRICAL July 05, 2023
944.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-475 - SD for Inbound Dock Office Power Layout .pdf CSA July 05, 2023
945.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-016_0 - Commented.pdf CSA July 05, 2023
946.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-013_Sheet 1 of 7_0.xlsx CSA July 05, 2023
947.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-474 -SD MVSG.pdf CSA July 05, 2023
948.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-013_1-Commented.pdf CSA July 05, 2023
949.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-013_2-Commented.pdf CSA July 05, 2023
950.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-013_3-Commented.pdf CSA July 05, 2023
951.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-013_4 Commented.pdf CSA July 05, 2023
952.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-013_5-Commented.pdf CSA July 05, 2023
953.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-013_6-Commented.pdf CSA July 05, 2023
954.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-013_7-Commented.pdf CSA July 05, 2023
955.0 No. Transmittal; copy sent Through Email DIV 26-SECTION 26 05 36- Cable Tray for Electrical Systems.pdf ELECTRICAL July 05, 2023
956.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-117_0.xlsx ELECTRICAL July 05, 2023
957.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-482- MT Cable Tray Power Box.pdf ELECTRICAL July 05, 2023
958.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-117-Comments.pdf ELECTRICAL July 05, 2023
959.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-015_0.xlsx ELECTRICAL July 05, 2023
960.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-481- SD for Cast Coil Dry Type Transformer Review.pdf ELECTRICAL July 05, 2023
961.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-015-Commented.pdf ELECTRICAL July 05, 2023
962.0 No. Transmittal; copy sent Through Email NCR Photos.pdf ELECTRICAL July 05, 2023
963.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-344 - MEPF-Electronics-CCTV.pdf ELECTRICAL July 05, 2023
964.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-480_ Non-Conformance Report (NCR) 011.pdf ELECTRICAL July 05, 2023
965.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-NCR-011.pdf ELECTRICAL July 05, 2023
966.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-017_1.xlsx ELECTRICAL July 05, 2023
967.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-483- SD - UG Water Tank Detail Section R1.pdf STRUCTURAL July 05, 2023
968.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-017_Sheet 1_for Resubmission.pdf STRUCTURAL July 05, 2023
969.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-017_Sheet 2_Approved.pdf STRUCTURAL July 05, 2023
970.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-477_ Leed Coordination Meeting No. 9 STRUCTURAL July 05, 2023
971.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-150- MS Replacement of Wall Cladding _ Paint Repair Review STRUCTURAL July 05, 2023
972.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-126_0.xlsx CSA July 06, 2023
973.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-489 - MT Rockwool Insulator (IMC).pdf CSA July 06, 2023
974.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-488- SD Battery Room Emer. Eyewash Plumbing Layout.pdf CSA July 06, 2023
975.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-008_0 -Approved.pdf CSA July 06, 2023
976.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-092_0.xlsx MECHANICAL July 06, 2023
977.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-487 - MT Flexible Duct Connector Review .pdf MECHANICAL July 06, 2023
978.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-082_1.xlsx FIRE PRO July 06, 2023
979.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-486 - MT (Fire Pro(Strut Framing Support Sys.)R1.pdf FIRE PRO July 06, 2023
980.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-128_0.xlsx MECHANICAL July 06, 2023
981.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-485- MT Metal Frames with Acc._Ceiling_Partitio.pdf MECHANICAL July 06, 2023
982.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-119_0.xlsx CSA July 06, 2023
983.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-484- MT MasterSeal 530.pdf CSA July 06, 2023
984.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-119_Commented.pdf CSA July 06, 2023
985.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-490 - Installation of Temporary Materials – Hanger and Supports FIRE PRO July 06, 2023
986.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-004_Sheet 1 of 3.pdf July 10, 2023
987.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-004_Sheet 2 of 3.pdf July 10, 2023
988.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-004_Sheet 3 of 3.pdf July 10, 2023
989.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-564.pdf July 10, 2023
990.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-010.pdf July 10, 2023
991.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-565.pdf July 10, 2023
992.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-011.pdf July 10, 2023
993.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-566.pdf July 10, 2023
994.0 No. Transmittal; copy sent Through Email AA-3100 IFC REV2 with Dock Leveler Control Switch.pdf July 10, 2023
995.0 No. Transmittal; copy sent Through Email Dock Leveler 03.png July 10, 2023
996.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-029.xlsx July 10, 2023
997.0 No. Transmittal; copy sent Through Email Inkema Dock Pit.jpg July 10, 2023
998.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-449- SD- Dock Leveller and Finger Dock Plan Details .pdf MECHANICAL July 10, 2023
999.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-029 with comments.pdf July 10, 2023
1000.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-127_0.pdf July 10, 2023
1001.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-496 - MT for Fire Protection Valves, Fittings, Couplings.pdf FIRE PRO July 10, 2023
1002.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-127_Approved.pdf July 10, 2023
1003.0 No. Transmittal; copy sent Through Email Location Drawing - S-2160-R1.pdf July 10, 2023
1004.0 No. Transmittal; copy sent Through Email PHOTOS OF NON-CONFORMANCE.pdf July 10, 2023
1005.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-493- Ret. Walls Concrete Finishes .pdf CSA July 10, 2023
1006.0 No. Transmittal; copy sent Through Email Division 26-Section 26-Panel Boards.pdf July 10, 2023
1007.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-014_54 Sheets_0.xlsx July 10, 2023
1008.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-492- SD Panel Boards.pdf ELECTRICAL July 10, 2023
1009.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-014_54 Sheets-Commented.pdf July 10, 2023
1010.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-MT-009_0.xlsx July 10, 2023
1011.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-MT-010_0.xlsx July 10, 2023
1012.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-151- Various Material Approval TS#200.pdf July 10, 2023
1013.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-DWG-CW-300_0.xlsx July 10, 2023
1014.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-153- Catwalk - Framing Plan Details.pdf CSA July 10, 2023
1015.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-CW-300 Catwalk - Panel Details-Commented.pdf CSA July 10, 2023
1016.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-DWG-CW-300_0.xlsx CSA July 10, 2023
1017.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-CW-300 Catwalk - Panel Details-Commented.pdf CSA July 10, 2023
1018.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-MT-009_0.xlsx CSA July 10, 2023
1019.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-MT-010_0.xlsx CSA July 10, 2023
1020.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-MT-011_0.xlsx CSA July 10, 2023
1021.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-151- Various Material Approval TS#200.pdf July 10, 2023
1022.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-495- Corrective Action due to Misaligned Wall at the Ad July 10, 2023
1023.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-152- Steel Beam at Battery Recharge Room Doors STRUCTURAL July 10, 2023
1024.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-512- MT MasterSeal Traffic 1500.pdf CSA July 11, 2023
1025.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-138_Approved signed.pdf CSA July 11, 2023
1026.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-511- MT MasterSeal HLM 5000R.pdf CSA July 11, 2023
1027.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-137_ Approved signed.pdf CSA July 11, 2023
1028.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-124_0.xlsx CSA July 11, 2023
1029.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-510 - Refrigerant 410A (SOLFRON) .pdf MECHANICAL July 11, 2023
1030.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-124_AOC.pdf MECHANICAL July 11, 2023
1031.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-024_0.xlsx July 11, 2023
1032.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-499- MS Conduit and Field Device Inst..pdf July 11, 2023
1033.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-024_0 - Commented.pdf July 11, 2023
1034.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-019_0.xlsx July 11, 2023
1035.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-498- SD for Main Office Level 2 Power Layout R0.pdf July 11, 2023
1036.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-019_Commented.pdf July 11, 2023
1037.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-019_0.xlsx July 11, 2023
1038.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-498- SD for Main Office Level 2 Power Layout R0.pdf July 11, 2023
1039.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-019_Commented.pdf July 11, 2023
1040.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-125_0.xlsx July 11, 2023
1041.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-507- MT Malleable Iron Threaded Pipe Fittings (MECH).pdf July 11, 2023
1042.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-125_AOC.pdf July 11, 2023
1043.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-003_0.xlsx July 11, 2023
1044.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-505- SD MO Level 2 Block Out Plan for Mechanical Layout.pdf July 11, 2023
1045.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-123_0.xlsx July 11, 2023
1046.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-506- MT EL Wires THNN Wire for Mech. Works (PHILFLEX).pdf July 11, 2023
1047.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-123_0 - Commented.pdf July 11, 2023
1048.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-004_0.xlsx July 11, 2023
1049.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-504- Above Ceiling Chilled Water Piping Layout, Sec&Det..pdf July 11, 2023
1050.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-004_1to3_0 - Approved & AOC.pdf July 11, 2023
1051.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-002_Rev.00.xlsx July 11, 2023
1052.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-503- Prop Vas Mezzanine Lvl ACMV Layout, WH Lvl Revie.pdf July 11, 2023
1053.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-002_Sheet 1 of 9 with CP Comments.pdf July 11, 2023
1054.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-002_Sheet 4 of 9 with CP Comments.pdf July 11, 2023
1055.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-002_Sheet 9 of 9 with CP comments.pdf July 11, 2023
1056.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIS-SD-EL-018_0.xlsx July 11, 2023
1057.0 No. Transmittal; copy sent Through Email EL-018-R0 SPECS..pdf July 11, 2023
1058.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-501- SD forAutomatic Capacitor Bank (1 to 6 Sheets).pdf July 11, 2023
1059.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-018_0 - Commented AOC.pdf July 11, 2023
1060.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-003_0.xlsx July 11, 2023
1061.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-500- SD for Proposed Telephone and Data Layout.pdf July 11, 2023
1062.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-003_0 - Commented.pdf July 11, 2023
1063.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-117_1.xlsx July 13, 2023
1064.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-527 - MT for Cable Tray Power Box.pdf July 13, 2023
1065.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-131_0.xlsx July 13, 2023
1066.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-132_0.xlsx July 13, 2023
1067.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-133.xlsx July 13, 2023
1068.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-525- Various Mech. Submittals.pdf July 13, 2023
1069.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-083_1.xlsx July 13, 2023
1070.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-526 - MT for Diesel Engine Standby Generator Sets.pdf July 13, 2023
1071.0 No. Transmittal; copy sent Through Email 2790300-CA-4014.pdf July 13, 2023
1072.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-524- Wire Mesh for Type CI Manhole.pdf July 13, 2023
1073.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-523_ SD - Fence Profile FN 01 North Side R3 Review.pdf July 13, 2023
1074.0 No. Transmittal; copy sent Through Email SGI-MW-SCSIC-SD-CV-010_rev. 3_Sheet 1-Approved.pdf July 13, 2023
1075.0 No. Transmittal; copy sent Through Email SGI-MW-SCSIC-SD-CV-010_rev. 3_Sheet 2-Approved.pdf July 13, 2023
1076.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-010.pdf July 13, 2023
1077.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-011.pdf July 13, 2023
1078.0 No. Transmittal; copy sent Through Email EPC-TQ-029_ Misaligned Retaining Wall at Staircase #49_replied_14July23.pdf July 13, 2023
1079.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-495- Corrective Action due to Misaligned Wall at Admin.pdf July 13, 2023
1080.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-065_ Electrical Load Value July 13, 2023

1081.0 No. Transmittal; copy sent Through Email EPC-TQ-005_ Coordinated Shop Drawings (CSD) for MEPF Services_replied_14July23.pdf July 13, 2023

1082.0 No. Transmittal; copy sent Through Email SCENE 1.png July 13, 2023
1083.0 No. Transmittal; copy sent Through Email SCENE 2.png July 13, 2023
1084.0 No. Transmittal; copy sent Through Email SCENE 3.png July 13, 2023
1085.0 No. Transmittal; copy sent Through Email SCENE 4.png July 13, 2023
1086.0 No. Transmittal; copy sent Through Email SCENE 5.png July 13, 2023
1087.0 No. Transmittal; copy sent Through Email SCENE 6.png July 13, 2023
1088.0 No. Transmittal; copy sent Through Email SCENE 7.png July 13, 2023
1089.0 No. Transmittal; copy sent Through Email SCENE 8.png July 13, 2023
1090.0 No. Transmittal; copy sent Through Email SCENE 9.png July 13, 2023
1091.0 No. Transmittal; copy sent Through Email SCENE 10.png July 13, 2023
1092.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI- 514 Civil IFC Drawings Revision 02 & 04.pdf CSA July 15, 2023
1093.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-PLN-001_3.xlsx July 15, 2023
1094.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-451_ Project Quality Mngt. Plan Rev.0 Review .pdf July 15, 2023
1095.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-PLN-001_rev.3-Revise & Resubmit.pdf July 15, 2023
1096.0 No. Transmittal; copy sent Through Email Safety Walk Findings (#16)-June. 22 2023 .pdf July 15, 2023
1097.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-509_ Safety Walk Findings 16.pdf July 15, 2023
1098.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-018_0_ff.xlsx July 15, 2023
1099.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-517- SD-Motor and Bycicle East Parking Elevation.pdf STRUCTURAL July 15, 2023
1100.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-018_FF comment.pdf July 15, 2023
1101.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-032_0_FF.xlsx July 15, 2023
1102.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-518- SD - Underground Fuel Tank Details.pdf CSA July 15, 2023
1103.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-032_Commented FF.pdf July 15, 2023
1104.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-516- SD - Fire Reserve Tank Beam Detail.pdf FIRE PRO July 15, 2023
1105.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-033-Approved.pdf July 15, 2023
1106.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-519- SD-Car Parking Area Elevation.pdf CSA July 15, 2023
1107.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-021-Approved.pdf July 15, 2023
1108.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-MT-130.xlsx July 15, 2023
1109.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-528- MT Air Cooled Chillers , TR 100 (LG).pdf MECHANICAL July 15, 2023
1110.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-522- SD - Ramp Elevation at Car Parking Area.pdf CSA July 15, 2023
1111.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-019-Approved.pdf July 15, 2023
1112.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-020_0_FF.xlsx July 15, 2023
1113.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-521- SD - Ramp Elevation at Motor and Bicycle Parking.pdf CSA July 15, 2023
1114.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-020_R&R.pdf July 15, 2023
1115.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-022_0_FF.xlsx July 15, 2023
1116.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-520- SD-Road 1 and Road 1A Elevation at Gate 1.pdf CIVIL July 15, 2023
1117.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-022_with FF comments.pdf July 15, 2023
1118.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-134_0.xlsx July 15, 2023
1119.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-535- MT Pressure Gauge & Thermometer.pdf MECHANICAL July 15, 2023
1120.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-136_0.xlsx July 15, 2023
1121.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-534- MT Booster Pump_Pressure Tank_Sub. Sewage Pump.pdf MECHANICAL July 15, 2023
1122.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-122_0.xlsx July 15, 2023
1123.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-533- FM 200 Fire Suppression System (Fire Solution Inc.).pdf FIRE PRO July 15, 2023
1124.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-135_0.xlsx July 15, 2023
1125.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-532- PVC Pipes & Fittings for AC Drain (CROWN) .pdf PLUMBING July 15, 2023
1126.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-139_0.xlsx July 15, 2023
1127.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-531- MT Duct Liner Polyolefin Gasket (ACE Foam).pdf MECHANICAL July 15, 2023
1128.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-139_AOC.pdf July 15, 2023
1129.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIS-SD-EL-017_0.xlsx July 15, 2023
1130.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-530- SD for Main Office Level 1 and 2 Lighting Layout.pdf ELECTRICAL July 15, 2023
1131.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-017_0 - Commented R&R.pdf July 15, 2023
1132.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-DWG-MO-021_0.xlsx July 15, 2023
1133.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-154 - Elevator Shaft Framing Plan Review.pdf MECHANICAL July 15, 2023
1134.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-MO-021_0 - Commented.pdf July 15, 2023
1135.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-529 - Required - MEPF Method Statement MECHANICAL July 15, 2023
1136.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-539- SD - Typical Palisade Fence details for South Bndry.pdf CSA July 17, 2023
1137.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-002_rev1_Approved.pdf July 17, 2023
1138.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-537-Response to RFI NO.24 - Pedestal Main Rebar Qty..pdf STRUCTURAL July 17, 2023
1139.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RFI-024_Commented Signed.pdf July 17, 2023
1140.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-536- MT MasterSeal 540 .pdf CSA July 17, 2023
1141.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-140_Not Approved - SIGNED.pdf July 17, 2023
1142.0 No. Transmittal; copy sent Through Email DIV 26 SECTION 26 13 00.pdf July 17, 2023
1143.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-013_Sheet 1 of 8_1.xlsx July 17, 2023
1144.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-544 - SD MVSG R1 Review.pdf MECHANICAL July 17, 2023
1145.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-013_1 - Commented -AOC.pdf July 17, 2023
1146.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-023_0.xlsx July 17, 2023
1147.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-542- SD Typical Palisade Fence Detail FN-07.pdf CSA July 17, 2023
1148.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-023 With CP Comments.pdf July 17, 2023
1149.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-541- MT Skimcoat (Bostik) for Int. & Ext. Finish.pdf CSA July 17, 2023
1150.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-143_Approved.pdf July 17, 2023
1151.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-011_1_with FF comment.xlsx July 17, 2023
1152.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-545- SD-BA13 and GA03 Guardrail at Interior.pdf CSA July 17, 2023
1153.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-011_rev.1_Sheet 1 of 2_with FF comments.pdf July 17, 2023
1154.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-012_1_with FF comments.xlsx July 17, 2023
1155.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-543- SD - BO02 External Bollard.pdf CSA July 17, 2023
1156.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-538- Relocation of STP Behind Guardhouse-C PLUMBING July 17, 2023
1157.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-540- Additional Columns at MRF Canopy STRUCTURAL July 17, 2023
1158.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-006_2.xlsx July 19, 2023
1159.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-558 - SD Duct Bank Layout Rev.02.pdf ELECTRICAL July 19, 2023
1160.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-006_Rev.2 - Commented.pdf July 19, 2023
1161.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-557_ SD MO Level 1&2 Power Layout R2.pdf ELECTRICAL July 19, 2023
1162.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-009_R2 - APPROVED.pdf July 19, 2023
1163.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-552 - SD for Main Office Level 1 Electronics DataVoice.pdf ELECTRONICS July 19, 2023
1164.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-005_0 - Approved.pdf July 19, 2023
1165.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-551 - SD Inbound Office Level 2 Electronics DataVoice.pdf ELECTRONICS July 19, 2023
1166.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-006_0 - Approved.pdf July 19, 2023
1167.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-021._0.xlsx July 19, 2023
1168.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-025_0.xlsx July 19, 2023
1169.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-550 - MS & ITP EMTIMC Conduits .pdf ELECTRICAL July 19, 2023
1170.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-021_0 - AOC-Commented.pdf July 19, 2023
1171.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-025_0 - R & R-Commnted.pdf July 19, 2023
1172.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-556 - - Temporary Materials – Hanger and Supports FIRE PRO July 19, 2023
1173.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-155 - Installation of downspout misalignment PLUMBING July 21, 2023
1174.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-014_0_FF & ACV comments.xlsx July 21, 2023
1175.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-548 - SD-DG01 Goal Post Protection Bollard.pdf FIRE PRO July 21, 2023
1176.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-013_1_FF.xlsx July 21, 2023
1177.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-549 - SD - BO02 Internal Bollard R1.pdf CSA July 21, 2023
1178.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-554 - Method Statement for SOG Rectification Works.pdf STRUCTURAL July 21, 2023
1179.0 No. Transmittal; copy sent Through Email SOG Cracks.1.pdf July 21, 2023
1180.0 No. Transmittal; copy sent Through Email SOG Cracks.2.pdf July 21, 2023
1181.0 No. Transmittal; copy sent Through Email SOG Cracks.3.pdf July 21, 2023
1182.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-553- SD Main Office Level 1 Kitchen & PWD Toilet Plumbing Layout.pdf PLUMBING July 21, 2023
1183.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-007_Approved.pdf July 21, 2023
1184.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-310 - AR Long Lead Materials – Procurement Requirements.pdf CSA July 21, 2023
1185.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-565 - Request AR Long Lead Materials – Procurement Requirements.pdf CSA July 21, 2023
1186.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-028_0-RL.xlsx July 21, 2023
1187.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-564 -SGI-CON-MW-SCIC-CI-564 - Surface Prep.of Interior WallsBeamCol.& Skim Coating.pdf CSA July 21, 2023
1188.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-020_0.xlsx July 21, 2023
1189.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-563 - SD for MVSG Control Panel Review.pdf ELECTRICAL July 21, 2023
1190.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-020_0 - AOC.pdf July 21, 2023
1191.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-020_0.xlsx July 21, 2023
1192.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-563 - SD for MVSG Control Panel Review.pdf ELECTRICAL July 21, 2023
1193.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-020_0 - AOC.pdf July 21, 2023
1194.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-022_0.xlsx July 21, 2023
1195.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-562 - SD MVSG Emergency Stop Review.pdf ELECTRICAL July 21, 2023
1196.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-022_0 -Commented- AOC.pdf July 21, 2023
1197.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-156 - Response RFI 21 - Admin Building Elevator.pdf CSA July 21, 2023
1198.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-RFI-021-0 Admin Building Elevator Area with CP comments.pdf MECHANICAL July 21, 2023

1199.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-561 - Confirmation RE Extended Warranty for Booster Pump, Pressure Tank (MDA) and ELECTRICAL July 21, 2023
Submersible Sewage Pump
1200.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-066_ LF Supplied Critical Items on Main Warehouse July 21, 2023
1201.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-021_0.xlsx July 26, 2023
1202.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-562 - SD MVSG Emergency Stop Review.pdf CSA July 26, 2023
1203.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-021_1 -Commented- AOC.pdf July 26, 2023
1204.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-569- MT RC Chem Epoxy Z-200 Review.pdf STRUCTURAL July 26, 2023
1205.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-146_Approved.pdf July 26, 2023
1206.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-567- SD Outbound Toilet Plumbing Layout.pdf PLUMBING July 26, 2023
1207.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-010_Sheet 1-Approved.pdf July 26, 2023
1208.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-010_Sheet 2-Approved.pdf July 26, 2023
1209.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-570- MT Sikadur®-31 CF Normal (Sika) for Dowel Bar Review.pdf STRUCTURAL July 26, 2023
1210.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-149_approved signed.pdf July 26, 2023
1211.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-030_0-RL.xlsx July 26, 2023
1212.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-578 - MS Surface Prep. of Ext. Con. Surface & Skim Coating.pdf CSA July 26, 2023
1213.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-030_Commented R & R.pdf July 26, 2023
1214.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-035_0.xlsx July 26, 2023
1215.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-579- SD - Typical Structural Details of Dock Leveler.pdf STRUCTURAL July 26, 2023
1216.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-035_Commented R & R.pdf July 26, 2023
1217.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-036_0.xlsx July 26, 2023
1218.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-580- SD - Typical Stair Rebar and Footing Details.pdf STRUCTURAL July 26, 2023
1219.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-036_Commented R & R.pdf July 26, 2023

1220.0 No. Transmittal; copy sent Through Email EPC-TQ-011_ Water Efficiency Labelling Scheme for Plumbing Fixtures_replied_27July23 PLUMBING July 27, 2023

1221.0 No. Transmittal; copy sent Through Email EPC-TQ-021_ Pipe Support Through Wall Cladding_replied_27July23.pdf STRUCTURAL July 27, 2023
1222.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-137 - Material Submittal for Downspout.pdf July 27, 2023
1223.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-160 - MS for Installation of Roofing and Metal Sidings.pdf July 27, 2023
1224.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-RC-028 Downspout Support.pdf July 27, 2023
1225.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-RC-029 Downspout Typical Details.pdf July 27, 2023
1226.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-MS-007-REV 1 MS Roofing & Metal Siding REV1.pdf July 27, 2023
1227.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-MT-013-0 - MT - Downspout.pdf July 27, 2023

1228.0 No. Transmittal; copy sent Through Email EPC-TQ-023_ MS for repair of damaged paint on steel structures_replied_27July23.pdf CSA July 27, 2023

1229.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-161 - Painting Repair Rev.01.pdf July 27, 2023
1230.0 No. Transmittal; copy sent Through Email SGI-PEB-MS-018 REV 1 MS for Paint Repair.pdf July 27, 2023
1231.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-585 - SD for Inbound Dock Office Power Layout R1.pdf CSA July 28, 2023
1232.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-016_1 - Approved.pdf July 28, 2023
1233.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-584 - MT FDAS - FACP, NAC Devices & IDC Devices Review.pdf FIRE PRO July 28, 2023
1234.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-145_0 - Commented AOC.pdf July 28, 2023
1235.0 No. Transmittal; copy sent Through Email Specification.pdf July 28, 2023
1236.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-583 - MT AEROTAPE (Self Adhesive Aero Tape).pdf MECHANICAL July 28, 2023
1237.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-150_Approved.pdf July 28, 2023
1238.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-582 - MT Black Iron Pipe (RNW Pacific Pipe) R1.pdf FIRE PRO July 28, 2023
1239.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-129_rev.1_Approved.pdf July 28, 2023
1240.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-148_0-CP.xlsx July 28, 2023
1241.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-581 - MT Interior and Exterior Painting Works.pdf CSA July 28, 2023
1242.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-148 with CP Comments.pdf July 28, 2023
1243.0 No. Transmittal; copy sent Through Email mark-up elevation drawings.zip July 28, 2023
1244.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-159 - Building Insulation Requirements (Response to ASI-RFI-017).pdf MECHANICAL July 28, 2023
1245.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-067_ Proposed Adjustment of Glass Window at VAS Mezzanine CSA July 28, 2023
1246.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-151_0.xlsx August 01, 2023
1247.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-589- MT Polyolefin Duct Lining (ACE FOAM).pdf MECHANICAL August 01, 2023
1248.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-588 - MT Medium Voltage Cables.pdf ELECTRICAL August 01, 2023
1249.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-144_0 - Not Approved.pdf August 01, 2023
1250.0 No. Transmittal; copy sent Through Email Response _ SGI-MW-SCIC-RFI-026.pdf August 01, 2023
1251.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-587 - Response to RFI-26 Panel Board Clarification.pdf ELECTRICAL August 01, 2023
1252.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-598 - SD Miscellaneous Detail of Fixture.pdf PLUMBING August 01, 2023
1253.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-012_0 - Approved.pdf August 01, 2023
1254.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-597 - SD Outbound Water Line Layout.pdf PLUMBING August 01, 2023
1255.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-011_0 - Approved.pdf August 01, 2023
1256.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-596- SD MO Lvl 1 Kitchen & PWD Toilet PL Review R1.pdf PLUMBING August 01, 2023
1257.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-007_Sheet 2_Approved.pdf August 01, 2023
1258.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-007_rev.1_Sheet 1Approved.pdf August 01, 2023
1259.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-595 - SD for New Layout of Stair 49.pdf STRUCTURAL August 01, 2023
1260.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-018_Approved.pdf August 01, 2023
1261.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-016_0.xlsx August 01, 2023
1262.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-594 - SD-Zuccalo along GL. E1 @ Main Office Bldg.pdf STRUCTURAL August 01, 2023
1263.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-593 - SD Main Office Level 2 Plumbing Layout Review.pdf STRUCTURAL August 01, 2023
1264.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-006_0 - Commented Approved.pdf August 01, 2023
1265.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-592 - SD Main Office Level 1&2 Water Line Layout.pdf PLUMBING August 01, 2023
1266.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-009_0 - Commented-Approved.pdf August 01, 2023
1267.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-591 - SD for Typ. Mounting Details Duplex.pdf PLUMBING August 01, 2023
1268.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-024_0 - Commented Approved.pdf August 01, 2023
1269.0 No. Transmittal; copy sent Through Email DIV 26 SEC 26 24 16 - Panel.pdf August 01, 2023
1270.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-023_0.xlsx August 01, 2023
1271.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-590 - SD Electrical Panels Review.pdf ELECTRICAL August 01, 2023
1272.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-023_0 - Commented AOC.pdf August 01, 2023
1273.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-599- MT Concrete Mix Design 3000psi, 4000psi & 6000psi.pdf STRUCTURAL August 01, 2023
1274.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-152_Approved.pdf August 01, 2023
1275.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-600- MT Angle Bar (Regan Industrial).pdf STRUCTURAL August 01, 2023
1276.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-154_Approved.pdf August 01, 2023
1277.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-027_0.xlsx August 01, 2023
1278.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-601 - Method Statement for Painting Works R1 Review.pdf CSA August 01, 2023
1279.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-027 -Commented R&R_CP.pdf August 01, 2023
1280.0 No. Transmittal; copy sent Through Email Asia Global - LF SLDC MHE CB.pdf August 01, 2023
1281.0 No. Transmittal; copy sent Through Email Boeing - JH23 - 5863-LF-SLDC.pdf August 01, 2023
1282.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-603- Electrical Load for Battery Trucks.pdf ELECTRICAL August 01, 2023
1283.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-036_0.xlsx August 02, 2023
1284.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-606- MS Concrete Chipping &Resto. after MEPF Works .pdf MECHANICAL August 02, 2023
1285.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-036_0 - R&R.pdf August 02, 2023
1286.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-007_0.xlsx August 02, 2023
1287.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-607 - SD for Site Development CCTV Layout Review.pdf ELECTRONICS August 02, 2023
1288.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-007_0 - R & R commented.pdf August 02, 2023
1289.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIS-SD-PL-013_0.pdf August 02, 2023
1290.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-608- SD Outbound Dock Office Plumbing Layout.pdf PLUMBING August 02, 2023
1291.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-013_0 - Approved.pdf August 02, 2023

1292.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-067_ Proposed Adjustment of Glass Window at VAS Mezzanine_LF Response.pdf CSA August 02, 2023

1293.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-068_ Budgetary rate on the additional work for the adjustment on both inner and exterior CSA August 02, 2023
windows .pdf
1294.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-604- Louver Color RAL-9002 (Juton Paint) CSA August 02, 2023
1295.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-605- PVC Pipes & Fittings for AC Drain (CROWN) R1 MECHANICAL August 02, 2023
1296.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-609- Additional Maintenance Access Manhole at UG.pdf August 03, 2023
1297.0 No. Transmittal; copy sent Through Email viber_image_2023-07-31_12-27-59-886.jpg August 03, 2023
1298.0 No. Transmittal; copy sent Through Email viber_image_2023-07-31_12-28-23-143.jpg August 03, 2023
1299.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-610- SD for Site Development CCTV Layout_1-R1.pdf ELECTRONICS August 03, 2023
1300.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-007_1 - Approved.pdf August 03, 2023
1301.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-610- SD for Site Development CCTV Layout_1-R1.pdf ELECTRONICS August 03, 2023
1302.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-007_1 - Approved.pdf August 03, 2023
1303.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-611- MT for Wire Mesh (5mm thick) Review.pdf ELECTRONICS August 03, 2023
1304.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-160_Approved.pdf August 03, 2023
1305.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-158 - Pallet Lifts in VAS Area.pdf MECHANICAL August 03, 2023
1306.0 No. Transmittal; copy sent Through Email STA CLARA PROJECT CABUYAO LAGUNA.pdf August 03, 2023
1307.0 No. Transmittal; copy sent Through Email STA CLARA PROJECT CABUYAO LAGUNA 2.pdf August 03, 2023
1308.0 No. Transmittal; copy sent Through Email STA CLARA PROJECT CABUYAO LAGUNA 3.pdf August 03, 2023
1309.0 No. Transmittal; copy sent Through Email Purlin Identified Defects.pdf August 03, 2023
1310.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-159- Corrosion Oxidization Taint on Installed Purlins at Canopy Outbound Dock Area.pdf CSA August 03, 2023
1311.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-612 - Electrical & Electronics Shop Drawing Details ELECTRICAL August 03, 2023
1312.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-011_0.xlsx August 04, 2023
1313.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-614- SD AW Fire Det. & Alarm System Review.pdf FIRE PRO August 04, 2023
1314.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-011_0-Commented R & R.pdf August 04, 2023
1315.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIS-SD-PL-014_0.-Sht 1-3.xlsx August 04, 2023
1316.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-616- SD Elec.Manhole Drainage System Layout.pdf PLUMBING August 04, 2023
1317.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-014_0-Commented R & R.pdf August 04, 2023
1318.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-615- MT Air Cooled Chillers , TR 100 (LG) R1 Review MECHANICAL August 04, 2023
1319.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-069_ Maersk Logo CSA August 04, 2023
1320.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-025_0.xlsx August 07, 2023
1321.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-618- SD for Automatic Transfer Switch Review .pdf ELECTRICAL August 07, 2023
1322.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-025-Commented R & R.pdf August 07, 2023
1323.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-619- SD for Inbound Office Level 1&3 Elec. DataVoice.pdf ELECTRICAL August 07, 2023
1324.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-009_0 - Approved.pdf August 07, 2023
1325.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-038.xlsx August 07, 2023
1326.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-629 - SD for Additional Columns at MRF Canopy Review.pdf CSA August 07, 2023
1327.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-038-Commented R & R.pdf August 07, 2023
1328.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-628 - SD - BO02 Internal Bollard R2 Review.pdf CSA August 07, 2023
1329.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-013_rev.2-Approved FF.pdf August 07, 2023
1330.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC- SD-AR-014_2_FF comments.xlsx August 07, 2023
1331.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-627 - SD-DG01 Goal Post Protection Bollard R2 Review.pdf CSA August 07, 2023
1332.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-107_1.xlsx August 07, 2023
1333.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-626 - MT Bracket and Support (TUNZEL)R1 Review.pdf STRUCTURAL August 07, 2023
1334.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-107-1 -Commented AOC.pdf August 07, 2023
1335.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-156_0.xlsx August 07, 2023
1336.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-625- MT Manhole Cover & Frame, Auxiliary Drainage Inlet.pdf PLUMBING August 07, 2023
1337.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-156_Commented R & R.pdf August 07, 2023
1338.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-624- SD Storm Proof Louver 45 Deg. Fixed Blade Inst.pdf MECHANICAL August 07, 2023
1339.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-009-Approved.pdf August 07, 2023
1340.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-623- MT for Floor Drains (JAMAN) Review .pdf PLUMBING August 07, 2023
1341.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-142_Approved.pdf August 07, 2023
1342.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-623- MT for Floor Drains (JAMAN) Review .pdf PLUMBING August 07, 2023
1343.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-142_Approved.pdf August 07, 2023
1344.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-622- SD OB Dock Office Lvl. 2 & Roof Lvl. Mech.Blockout.pdf MECHANICAL August 07, 2023
1345.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-008 sht 1&2-Approved.pdf August 07, 2023
1346.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-013_0.xlsx August 07, 2023
1347.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-621- SD for Inbound Dock Office Fire Detection & Alarm System.pdf FIRE PRO August 07, 2023
1348.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-013_0 - Commented.pdf August 07, 2023
1349.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIS-SD-EL-026_0.xlsx August 07, 2023
1350.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-620- SD Typical Detail of Lighting Arrester Bracket.pdf ELECTRICAL August 07, 2023
1351.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-026-Commented R & R.pdf August 07, 2023
1352.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-639- SD Prop.IB Dock Office Level 1 & 2 Ref.Piping.pdf PLUMBING August 07, 2023
1353.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-015_0 - Approved.pdf August 07, 2023
1354.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-637- SD AW ELV Layout Fire Detection & Alarm System .pdf FIRE PRO August 07, 2023
1355.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-008_0 - Approved.pdf August 07, 2023
1356.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-636- SD Inbound Dock Office Level 2 Mechanical Block Ou.pdf MECHANICAL August 07, 2023
1357.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-006_0 - Approved.pdf August 07, 2023
1358.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-635- SD for Site Development Water Irrigation Line.pdf PLUMBING August 07, 2023
1359.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-016_0 - Approved.pdf August 07, 2023
1360.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-634- MT LC Purlins, Sag Rod , Angle Bar and HS .pdf STRUCTURAL August 07, 2023
1361.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-153-approved.pdf August 07, 2023
1362.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-038_0-FF.xlsx August 07, 2023
1363.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-632 - SD -MS Inst. Backer Rod and Polyurethane Sealant .pdf STRUCTURAL August 07, 2023
1364.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-039_0.xlsx August 07, 2023
1365.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-631 - MS Application of Master Seal 620 Review.pdf CSA August 07, 2023
1366.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-039-0_AOC.pdf August 07, 2023
1367.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-630 - SD Lateral Truss Showing Gusset Plate for Guard House.pdf STRUCTURAL August 07, 2023
1368.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-037_Sheet 1-Approved.pdf August 07, 2023
1369.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-037_Sheet 2-Approved.pdf August 07, 2023
1370.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-648- SD Prop. MO Level 2 CW Piping Layout .pdf PLUMBING August 07, 2023
1371.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-012_0 - Approved.pdf August 07, 2023
1372.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-147_0.xlsx August 07, 2023
1373.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-646- MT Gypsum Board Fire Resistant and Moisture August 07, 2023
Resistant.pdf
1374.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-141._0.xlsx August 07, 2023
1375.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-645- MT for Bronze Ball Valve (AVK) Review.pdf PLUMBING August 07, 2023
1376.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-059_0.xlsx August 07, 2023
1377.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-644- MT LVSG, Panel board and Accessories (Power Box).pdf ELECTRICAL August 07, 2023
1378.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-059_0 - AOC.pdf August 07, 2023
1379.0 No. Transmittal; copy sent Through Email Specification.pdf August 07, 2023
1380.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-642- SD Proposed Main Office Level 1 Chilled Water Pp.pdf ELECTRICAL August 07, 2023
1381.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-013_0 - Approved.pdf August 07, 2023
1382.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-016_0.xlsx August 07, 2023
1383.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-641- Prop. IB Dock Office Level 3 ME Block Out Lay.pdf MECHANICAL August 07, 2023
1384.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-016_0 - Commented-AOC.pdf August 07, 2023
1385.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-640- SD Prop. IBDock Office 1 ACMV Layout & Bldg. Sec.P1.pdf MECHANICAL August 07, 2023
1386.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-014_0 - Approved.pdf August 07, 2023
1387.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-638 - FIRE PROTECTION RUSTED SUPPORT INSTALLATION FIRE PRO August 07, 2023
1388.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-643- MT Lanko 731 for Patching Repair Cause by Tie Ro CSA August 07, 2023
1389.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-659- Prop. MO Level 1 ACMV Layout & Section Part 03 .pdf August 10, 2023
1390.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-010_0 - Approved.pdf August 10, 2023
1391.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-021_0-Sht.1-6.xlsx August 10, 2023
1392.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-658- SD Proposed Roof Ventilator Ducting Layout AW .pdf MECHANICAL August 10, 2023
1393.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-021-0_Approved on Condition.pdf August 10, 2023
1394.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-164_0.xlsx August 10, 2023
1395.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-657- MT Malleable Pipe Fittings .pdf PLUMBING August 10, 2023
1396.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-164_AOC.pdf August 10, 2023
1399.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-656- SD Proposed Utilities ACMV Layout & Bldg.pdf CSA August 10, 2023
1400.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-017_0 - Approved.pdf August 10, 2023
1401.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-161_0.xlsx August 10, 2023
1402.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-655- MT Paint for Fire Protection Works Review.pdf MECHANICAL August 10, 2023
1403.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-161-AOC.pdf August 10, 2023
1404.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-042_0.xlsx August 10, 2023
1405.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-654- MS ME - Inst.Storm Proof Louver.pdf MECHANICAL August 10, 2023
1406.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-020_0.xlsx August 10, 2023
1407.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-653 - SD Drywall Framing Detail Review.pdf CSA August 10, 2023
1408.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-020-R & R CP Comments.pdf August 10, 2023

1409.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-652 - PQD CONSTRUX INC. Int.Glass Door, Window & Wall Partition.pdf CSA August 10, 2023

1410.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-PQD-008-Approved.pdf August 10, 2023
1411.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-010_1.xlsx August 10, 2023
1412.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-669_ SD Cable Tray Layout.pdf ELECTRICAL August 10, 2023
1413.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-010-1_Commeted 10Aug23.pdf August 10, 2023
1414.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-668_ SD EMT Pipe Typical Mounting Details AW.pdf ELECTRICAL August 10, 2023
1415.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-028-0_Approved.pdf August 10, 2023
1416.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-002_2.xlsx August 10, 2023
1417.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-667_ SD Lighting Arrester & Grounding Inst. Det.pdf ELECTRICAL August 10, 2023
1418.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-002_Commented 10Aug22.pdf August 10, 2023
1419.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-666- Site Development Potable Waterline Layout.pdf PLUMBING August 10, 2023
1420.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-017_0-Appproved.pdf August 10, 2023
1421.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-665- SD MO LVl 1 (Male Toilet Plumbing Layout a.pdf PLUMBING August 10, 2023
1422.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-018_0-Approved.pdf August 10, 2023
1423.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-664- SD MO LVl 1 (Female Toilet Plumbing Layout a.pdf PLUMBING August 10, 2023
1424.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-015_0-Approved.pdf August 10, 2023
1425.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-158_0.xlsx August 10, 2023
1426.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-662- MT Public Add Sys. Battery Supply,Cables& Equpt.Cab.pdf ELECTRONICS August 10, 2023
1427.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-158_0_Commented AOC.pdf August 10, 2023
1428.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-042_0.xlsx August 10, 2023
1429.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-662- MS ME Works (Inst. of Storm Proof Louver) .pdf MECHANICAL August 10, 2023
1430.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-042_AOC.pdf August 10, 2023
1431.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-663- SD IB Dock Office Fire Det. & Alarm System.pdf FIRE PRO August 10, 2023
1432.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-013_1-Approved.pdf August 10, 2023
1433.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-661- SD Prop.Main Office Level 2 ACMV Layout & Section.pdf MECHANICAL August 10, 2023
1434.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-011_0 - Approved.pdf August 10, 2023
1435.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-660- Outbound Office Level 1&2 ELC DataVoice .pdf ELECTRICAL August 10, 2023
1436.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-010_0 - Approved.pdf August 10, 2023
1437.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-165_0.xlsx August 10, 2023
1438.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-670_ MT Grounding Materials (Greenlee).pdf ELECTRICAL August 10, 2023
1439.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-165- Commented AOC.pdf August 10, 2023
1440.0 No. Transmittal; copy sent Through Email Purlin Identified Defects.pdf August 10, 2023
1441.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-162- Corr. Oxidization Taint on Inst. Purlins at Canopy OB Dock Area.pdf CSA August 10, 2023
1442.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-671- August 11, 2023
1443.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-019-0_Approved.pdf SD Miscellaneous Details Review.pdf August 11, 2023
1444.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-672- SD Proposed Main Office Roof Level ACMV Layout.pdf ELECTRICAL August 14, 2023
1445.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-020_0 - Approved.pdf August 14, 2023
1446.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-024_1.xlsx August 14, 2023
1447.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-673_ MS Conduit and Field Device Inst. R1.pdf ELECTRICAL August 14, 2023
1448.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-024-1_Commented R & R.pdf August 14, 2023
1449.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-043_0.xlsx August 14, 2023
1450.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-674_ MS Grounding System Installation Review.pdf ELECTRICAL August 14, 2023
1451.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-043-0_Commented R & R.pdf August 14, 2023
1452.0 No. Transmittal; copy sent Through Email Drawing Ref.-Downspout in Admin Roof Deck to Grnd Floor.pdf August 14, 2023
1453.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-675- Downspout in Admin Roof Deck to Grnd Floor.pdf PLUMBING August 14, 2023
1454.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-163- MT Stainless Steel Checkered Plates 3.0 mm R1.pdf STRUCTURAL August 14, 2023
1455.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-MT-009_1-Commented.pdf August 14, 2023
1456.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-MT-009_1.xlsx August 14, 2023
1457.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-164-DWG - VAS Mezzanine Framing Plan Review.pdf STRUCTURAL August 14, 2023
1458.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-VM-003-REV 02 - FRAMING PLAN_Commented AOC.pdf August 14, 2023

1459.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-677- WALL PLASTER DE-BONDED PEELING-OFF AT BATTERY RECHARGE ROOM.pdf August 15, 2023

1460.0 No. Transmittal; copy sent Through Email Wall Plaster Debonded Peeling_1.pdf August 15, 2023
1461.0 No. Transmittal; copy sent Through Email Wall Plaster Debonded Peeling_2.pdf August 15, 2023
1462.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-032_0.xlsx August 15, 2023
1463.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-678- MS Repair of Uneven Slab on Grade Review .pdf CSA August 15, 2023
1464.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-032-Commented AOC.pdf August 15, 2023
1465.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-163_0.xlsx August 15, 2023
1466.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-679- MT Angle Bar Hot DipGal. Bracket & Support.pdf MECHANICAL August 15, 2023
1467.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-163_Commented AOC.pdf August 15, 2023
1468.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-162._0.xlsx August 15, 2023
1469.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-680- MT Medium Voltage Cables (Phelps Dodge).pdf ELECTRICAL August 15, 2023
1470.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-162_Commented AOC.pdf.pdf August 15, 2023
1471.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-016_0.xlsx August 15, 2023
1472.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-681- SD OB Dock Office Fire Detector & Alarm System .pdf FIRE PRO August 15, 2023
1473.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-016_Commented AOC.pdf August 15, 2023
1474.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-682- ITP Storm Proof Louver Installation Review.pdf MECHANICAL August 15, 2023
1475.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-025-0_Approved.pdf August 15, 2023

1476.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-683- SD Proposed Main Office Level 1, 2 and FP Riser, Crossmain&Drain Piping PLUMBING August 15, 2023

1477.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-684- Fire Rated Wall Assembly CSA August 15, 2023
1478.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-685-SCIC Exterior and Interior Seismic Gap Cover CSA August 15, 2023
1479.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-686- Additional Concrete Stairs CSA August 15, 2023
1480.0 No. Transmittal; copy sent Through Email proposed ceiling manhole location to LF CSA August 16, 2023
1481.0 No. Transmittal; copy sent Through Email Project Optimus - RCP (Issued 081523) CSA August 16, 2023
1482.0 No. Transmittal; copy sent Through Email Calbration Certificate of Batching plant by SCIC CSA 19/2023

1483.0 No. Transmittal; copy sent Through Email Project Optimus - RCP (Issued 081523)_All Offices, Guardhouse B and GYM CSA August 22, 2023

1484.0 No. Transmittal; copy sent Through Email proposed ceiling manhole location to LF CSA August 22, 2023
1485.0 No. Transmittal; copy sent Through Email SGI-CON-MW-CI-SCIC-696- Pedestals P1 at Canopy Area (Ramp 04) CSA August 22, 2023
1486.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-686- Additional Concrete Stairs CSA August 22, 2023
1487.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-165- Exterior Seismic Gap Cover CSA August 22, 2023
1488.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-166 - Stairs at Canopy Loading Area to Ambient Warehouse CSA August 22, 2023
1489.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-PLN-001_3.xlsx CSA August 22, 2023
1490.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-451_ Project Quality Mngt. Plan Rev.0 Review .pdf CSA August 22, 2023
1491.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-PLN-001_rev.3-Revise & Resubmit.pdf August 22, 2023
1492.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-687- MS Fire Protection System - Pipe Painting.pdf FIRE PRO August 22, 2023
1493.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-023-0_Commented AOC.pdf August 22, 2023
1494.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-688_ SD Outdoor Lighting Post Foundation Detail.pdf ELECTRICAL August 22, 2023
1495.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-030-0_Commented Approved.pdf August 22, 2023
1496.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-012_0.xlsx August 22, 2023
1497.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-689- SD Proposed Layout of Smoke Det. Ceiling.pdf FIRE PRO August 22, 2023
1498.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-012_0_Commented AOC.pdf August 22, 2023
1499.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-690- SD Outbound Toilet Plumbing Layout R1 Review.pdf PLUMBING August 22, 2023
1500.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-010_rev.1_Sht 2_Approved.pdf August 22, 2023
1501.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-PL-010_rev.1_Sht.1_Approved.pdf August 22, 2023
1502.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-691 - MT for Air Terminals for AC and Ventillation R1 Review.pdf MECHANICAL August 22, 2023
1503.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-090_0.pdf August 22, 2023
1504.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-090_1-Approved (Sample).pdf August 22, 2023
1505.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-692 - MS Installation of Refrigerant Piping Review.pdf MECHANICAL August 22, 2023
1506.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-047-0_Approved.pdf August 22, 2023
1507.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-693 - ITP 27 for Refrigerant Piping System Review.pdf MECHANICAL August 22, 2023
1508.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-027-0_Approved.pdf August 22, 2023
1509.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-043_1.xlsx August 22, 2023
1510.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-694_ MS Grounding System Installation Review.pdf ELECTRICAL August 22, 2023
1511.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-043_rev.1-Commented AOC.pdf August 22, 2023
1512.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-029_0.xlsx August 22, 2023
1513.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-695_ MS Insta.of Ladder Rung at UG Tanks, Elec.pdf CSA August 22, 2023
1514.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-029-0_Commented R & R.pdf August 22, 2023
1515.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-039_0.xlsx August 22, 2023
1516.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-697 - SD for Stair 50 Details at Main Office Review.pdf CSA August 22, 2023
1517.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-039-0_Commented.pdf August 22, 2023
1518.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-026_2.xlsx August 22, 2023

1519.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-698 -SD - SD Typ. Detail of Sawn Joint - Type 3C Construction Joint.pdf CSA August 22, 2023

1520.0 No. Transmittal; copy sent Through Email SLTVPO~J_Commented FF.PDF August 22, 2023
1521.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-173_0.xlsx August 22, 2023
1522.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-699- MT Pipe Support (Helix Steel) with Sample Board.pdf FIRE PRO August 22, 2023
1523.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-173-0_Commented R&R.pdf August 22, 2023
1524.0 No. Transmittal; copy sent Through Email Evidence Photos - ASI WALL CLADDING DAMAGED BY SCIC BACKHOE.pdf August 22, 2023
1525.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-702_ Non-Conformance Report (NCR) 012.pdf August 22, 2023
1526.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-NCR-012.pdf August 22, 2023
1527.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-NCR-012.pdf August 22, 2023
1528.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RFI-028 with CP Comments_R1.pdf August 22, 2023
1529.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RFI-029 with CP Comments R1.pdf August 22, 2023
1530.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-704 - SD GH A, B &C Toilet Water Line Layout Review.pdf PLUMBING August 22, 2023
1531.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-021-0_Approved.pdf August 22, 2023
1532.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-171_0.xlsx August 22, 2023
1533.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-705 - MT Gal.Iron Sheet for HVAC Ducting (REGAN) Review.pdf MECHANICAL August 22, 2023
1534.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-171_Commented AOC.pdf August 22, 2023
1535.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-045-0_Approved.pdf August 22, 2023
1536.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-706 - MS Application of Tank Lining Master Protect 180 Re.pdf PLUMBING August 22, 2023
1537.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-707 - CHB Wall Partition and Drywall Partition.pdf CSA August 22, 2023
1538.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RFI-031 with CP Comments R1.pdf August 22, 2023
1539.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-169.xlsx August 22, 2023
1540.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-708 - MT Sewer Line - HDPE (ATLANTA) Review.pdf PLUMBING August 22, 2023
1541.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-169-0_Commented AOC.pdf August 22, 2023
1542.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-709- ITP 26 Master Seal 530 CrystallineCapillary Cement.pdf CSA August 22, 2023
1543.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-026-0_Approved.pdf August 22, 2023
1544.0 No. Transmittal; copy sent Through Email RFI No.32 - Homogeneous Tiles Color_R1 with CP Comments.pdf August 22, 2023
1545.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-710- RFI 32 Homogeneous Tiles - Color Shade and Size.pdf CSA August 22, 2023
1546.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-113_1.xlsx August 22, 2023
1547.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-711 - MT Polyolefin Duct Insulation R1 Review.pdf MECHANICAL August 22, 2023
1548.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-113_rev.1_Commented AOC.pdf August 22, 2023
1549.0 No. Transmittal; copy sent Through Email Evidence Photos - Incorrect installation STORM DRAIN PIPE.pdf August 22, 2023
1550.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-712_ Non-Conformance Report (NCR) 013.pdf August 22, 2023
1551.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-119_1.xlsx August 22, 2023
1552.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-713- MT MasterSeal 530 R1 Review.pdf CSA August 22, 2023
1553.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-119-1_Commented.pdf August 22, 2023
1554.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-046-0.xlsx August 22, 2023
1555.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-714- MS Application of Cementitious Water Proofing .pdf CSA August 22, 2023
1556.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-046-0_Commented Not Approved.pdf August 22, 2023
1557.0 No. Transmittal; copy sent Through Email IMG-76af51686a52ccdc452fd0dc161edfc3-V.jpg August 22, 2023
1558.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-167 - Roof Exhauster - Total Dynamic load.pdf MECHANICAL August 22, 2023
1559.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-031_-0_Sht. 1 & 2.xlsx August 23, 2023
1560.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-716_ SD OB Office Dock Level 1&2 Power Layout.pdf ELECTRICAL August 23, 2023
1561.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-031_-0_Sht. 1 & 2_Commented AOC.pdf August 23, 2023
1562.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-022_1.xlsx August 23, 2023
1563.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-717- SD for Synchroninizing Panel R1 Review.pdf ELECTRICAL August 23, 2023
1564.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-022-1_Commented AOC.pdf August 23, 2023
1565.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-033__0- Sht 1-3.xlsx August 23, 2023
1566.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-718- SD ATS -1-3 for ELVSGM-1& 2_Fire Pump.pdf FIRE PRO August 23, 2023
1567.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-033-0_Commented AOC.pdf August 23, 2023
1568.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-719- Material Submittal for MS Plate (LINTON).pdf STRUCTURAL August 23, 2023
1569.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-155_approved.pdf August 23, 2023
1570.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-610- SD for Site Development CCTV Layout_1-R1.pdf ELECTRONICS August 29, 2023
1571.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-007_1 - Approved.pdf August 29, 2023
1572.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-670_ MT Grounding Materials (Greenlee).pdf ELECTRICAL August 29, 2023
1573.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-165- Commented AOC.pdf August 29, 2023
1574.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-671- SD Miscellaneous Details Review.pdf August 29, 2023
1575.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-019-0_Approved.pdf August 29, 2023
1576.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-720 - MEPF Commented Drawings.pdf MECHANICAL August 29, 2023
1577.0 No. Transmittal; copy sent Through Email NTT-001_2790300-SPECS-BC-Elec-FDAS.pdf August 29, 2023
1578.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-721- Re. Letter 107_FDAS Extended Warranty.pdf MECHANICAL August 29, 2023
1579.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-722 - MEPF Consolidated Drawings..pdf MECHANICAL August 29, 2023
1580.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-723- ITP Cable Tray and Support Installation.pdf MECHANICAL August 29, 2023
1581.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-724- MS Cable Tray and Support Installation.pdf MECHANICAL August 29, 2023
1582.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-044-0_Commented R&R.pdf August 29, 2023
1583.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-725- SD for Outbound Level 1 & 2 (Male & Female Toilet.pdf CSA August 29, 2023
1584.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-022-0_Approved.pdf August 29, 2023
1585.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-726- Black Iron Seamless Pipe ASTM 53.pdf PLUMBING August 29, 2023
1586.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-183-0_Approved.pdf August 29, 2023
1587.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-727- MT Differential Pressure Transmitter (DWYERS).pdf August 29, 2023
1588.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-175-0_Commented AOC.pdf August 29, 2023
1589.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-728_ Non-Conformance Report (NCR) 014.pdf August 29, 2023
1590.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-NCR-014.pdf August 29, 2023
1591.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-168 - Compliance to Installation of Guards and Railings.pdf CSA August 29, 2023
1592.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-ST34-005-0 STAIR 33 & 34 RAILING ELEVATION with CP STAIR 33 & 34 RAILING ELEVATION with CP Comments.pdf CSA August 29, 2023
Comments.pdf
1593.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-ST34-006-0 STAIR 33 & 34 SECTION DETAILS OF RAILING with CP Comments.pdf CSA August 29, 2023

1594.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-ST34-007-0 STAIR 33 & 34 SECTION DETAILS OF RAILING with CP Comments.pdf CSA August 29, 2023

1595.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-169 - Drawings Stair 33-34 Railings Review.pdf CSA August 29, 2023
1596.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-ST34-004-0 STAIR 33 & 34 RAILING FRAMING PLAN_Approved.pdf CSA August 29, 2023
1597.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-ST34-005-0 STAIR 33 & 34 RAILING ELEVATION with CP Comments.pdf CSA August 29, 2023

1598.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-ST34-006-0 STAIR 33 & 34 SECTION DETAILS OF RAILING with CP Comments.pdf CSA August 29, 2023

1599.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-ST34-007-0 STAIR 33 & 34 SECTION DETAILS OF RAILING with CP Comments.pdf CSA August 29, 2023

1600.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-610- SD for Site Development CCTV Layout_1-R1.pdf ELECTRONICS August 30, 2023
1601.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-007_rev.1-Approved.pdf August 30, 2023
1602.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-729- MT Duct Liner Polyolefin Gasket R1 (ACE Foam).pdf MECHANICAL August 30, 2023
1603.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-139-1_Approved.pdf August 30, 2023
1604.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-730- SD Proposed CHW Schematic Diagram Review.pdf MECHANICAL August 30, 2023
1605.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-023-0_Approved.pdf August 30, 2023
1606.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-731- MT Pipe Support (Helix Steel)R1 Review.pdf MECHANICAL August 30, 2023
1607.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-173-1_Approved.pdf August 30, 2023
1608.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-732- SD OB Dock Office Level 1 CWP Layout& Mis..pdf PLUMBING August 30, 2023
1609.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-022-0 Sht1-2-Approved.pdf August 30, 2023
1610.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-733- MT Malleable Pipe Fittings R1 Review .pdf PLUMBING August 30, 2023
1611.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-164-1_Approved.pdf August 30, 2023
1612.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-734 - SD EMT Pipe, Beam Clamp&Pipe Hanger Typ.Det..pdf ELECTRICAL August 30, 2023
1613.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-032-0_Commented R & R.pdf August 30, 2023
1614.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-023_0.xlsx August 30, 2023
1615.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-736 - SD for IB Dock Office Water Line Layout.pdf PLUMBING August 30, 2023
1616.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-020-0_Approved.pdf August 30, 2023
1617.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-737 - SD Tile Layout for Admin Bldg.(2ndFloor Toilet).pdf CSA September 01, 2023
1618.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-024-0 Sht 1 & 2_Approved.pdf September 01, 2023
1619.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-738 - Sanitary Site Plan Outside Utilities &.pdf PLUMBING September 01, 2023
1620.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-001_Sht.-2-R3_Approved.pdf September 01, 2023

1621.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-739- Mismatch Doc.-SD Cable Tray Wall Penetration Mounting Details.pdf ELECTRICAL September 01, 2023

1622.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-034-0_Commented NA(Rejected).pdf September 01, 2023
1623.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-740 - MS EMTIMC Piping Installation R1 Review .pdf PLUMBING September 01, 2023
1624.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-025-1_Approved.pdf September 01, 2023
1625.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-741 - MT Anti-Corrosion Tape & Wrap (DENSO).pdf MECHANICAL September 01, 2023
1626.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-742- Fire Detection & Alarm System Column Mounted_.pdf FIRE PRO September 01, 2023
1627.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-015-0.xlsx September 01, 2023
1628.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-015-0_Commented R & R.pdf September 01, 2023
1629.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-033__1- Sht 1-3.xlsx September 01, 2023
1630.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-743- SD ATS -1-3 for ELVSGM-1& 2_Fire Pump R1 .pdf ELECTRICAL September 01, 2023
1631.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-033__1- Sht 1-3_Commented AOC.pdf September 01, 2023
1632.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-744 - MT Polyolefin Duct Insulation R2 Review.pdf MECHANICAL September 01, 2023
1633.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-113-2_Approved.pdf September 01, 2023
1634.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-746- ITP Plumbing Fixtures, Sanitary Wares & Access.pdf PLUMBING September 01, 2023
1635.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-028-0_Approved.pdf September 01, 2023
1636.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-042_0.xlsx September 01, 2023
1637.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-747- SD Stair 41 Details at Outbound Office Review.pdf CSA September 01, 2023
1638.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-042 with CP Comments.pdf September 01, 2023
1639.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-042_0.xlsx September 01, 2023
1640.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-747- SD Stair 41 Details at Outbound Office Review.pdf CSA September 01, 2023
1641.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-042 with CP Comments.pdf September 01, 2023
1642.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-748 - SD Site Development Water Irrigation Line.pdf PLUMBING September 01, 2023
1643.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-023 023-0 Sht 1-4_Approved.n.pdf September 01, 2023
1644.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-745 - MS Inst. & Testing of PL Fixtures.pdf PLUMBING September 01, 2023
1645.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-048-0_Approved.pdf September 01, 2023
1646.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-PL-024_0.xlsx September 01, 2023
1647.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-749 - SD Prop. Loc. of Water Pump Room for Potable WL.pdf PLUMBING September 01, 2023
1648.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-024-0_Commened R & R.pdf September 01, 2023
1649.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-750 -RFI-035 - RE Steel Column Protection.pdf CSA September 01, 2023
1650.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-751_ Non-Conformance Report (NCR) 015.pdf September 01, 2023
1651.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-NCR-015.pdf September 01, 2023
1652.0 No. Transmittal; copy sent Through Email Typical Detail for Expansion Joint, Sawn Joint, Construction Joint.PDF September 01, 2023
1653.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-753 - Project Permanent Waterline & Electricity.pdf ELECTRICAL September 06, 2023
1654.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-754 - MT Industrial Overhead Sectional Doors R1 Review .pdf September 06, 2023
1655.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-118-1_Commented AOC.pdf September 06, 2023
1656.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-755- SD Main Office Level 1 - Elevator Pit Plumbin.pdf PLUMBING September 06, 2023
1657.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-026-0_Approved.pdf September 06, 2023
1658.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-756- SD Toilet Plumbing Layout at Guard House A, B & C.pdf PLUMBING September 06, 2023
1659.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-019-0_Approved.pdf September 06, 2023
1660.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-757 - MT Flexible Duct Connector R1.pdf MECHANICAL September 06, 2023
1661.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-092-1_Approved.pdf September 06, 2023
1662.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-758 - Refrigerant 410A R1 (SOLFRON).pdf MECHANICAL September 06, 2023
1663.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-124-1_Approved.pdf September 06, 2023
1664.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-759 - SD Proposed Roof Ventilator Ducting Layout AW R1.pdf MECHANICAL September 06, 2023
1665.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-021-1_Approved.pdf September 06, 2023
1666.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-760 - MT AC Vol. Control Dampers, Motorized & Fire R1.pdf FIRE PRO September 06, 2023
1667.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-091-1_Commented AOC.pdf September 06, 2023
1668.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-761 -SD - Motor and Bycicle East Parking Elevation R1.pdf CSA September 06, 2023
1669.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-018_rev.1_Approved FF.pdf September 06, 2023
1670.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-762 - MT Material Submittal for Flat Bar (ACERSTEEL).pdf CSA September 06, 2023
1671.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-187-0_Approved FF.pdf September 06, 2023
1672.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-020_1_FF.pdf September 06, 2023
1673.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-763 -SD - Ramp Elevation at Motor and Bicycle Parking R1.pdf CSA September 06, 2023
1674.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-020-1_Approved FF.pdf September 06, 2023
1675.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-764 - SD-Road 1 and Road 1A Elevation at Gate 1 R1.pdf CSA September 06, 2023
1676.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-022-1_Approved FF.pdf September 06, 2023
1677.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-010_1_ff.xlsx September 06, 2023
1678.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-765 - SD - BA13 Guardrail at Exterior R1 Review_.pdf CSA September 06, 2023
1679.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-010-1_R & R.pdf September 06, 2023
1680.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-040_0.xlsx September 06, 2023
1681.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-766 - MS Crack Repair Injection at Slab on Grade.pdf CSA September 06, 2023
1682.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-021.xlsx September 06, 2023
1683.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-767- SD BK05 Precast Detail for Vas Mezzanine.pdf CSA September 06, 2023
1684.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-021-1_Commened R& R.pdf September 06, 2023
1685.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-185_0.xlsx September 06, 2023
1686.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-769- MT Cable Tray Ladder Type _Wire Mesh Ladder Type.pdf ELECTRICAL September 06, 2023
1687.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-185-0_Commented R & R.pdf September 06, 2023
1688.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-033_0.xlsx September 06, 2023
1689.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-771- Method Statement for Dry Wall Partition Review.pdf CSA September 06, 2023
1690.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-033 with CP Review.pdf September 06, 2023
1691.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIS-SD-EL-026_1.xlsx September 06, 2023
1692.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-772- SD Typ. Detail of Lighting Arrester Bracket R1.pdf ELECTRICAL September 06, 2023
1693.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-026-1_Commented R & R.pdf September 06, 2023
1696.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-026-1_Commented R & R.pdf September 06, 2023
1697.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-049_0.xlsx September 06, 2023
1698.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-773- MS Fire Detection & Alarm System - Cable Pulling.pdf FIRE PRO September 06, 2023
1699.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-049-0_Commented AOC.pdf September 06, 2023
1700.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-041_0.xlsx September 06, 2023
1701.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-041-0_Commented R & R.pdf September 06, 2023
1702.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-029_0.xlsx September 06, 2023
1703.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-775- SD Containerized Genset.pdf ELECTRICAL September 06, 2023
1704.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-029-0_Commented R & R.pdf September 06, 2023
1705.0 No. Transmittal; copy sent Through Email AA-3141 IFC REV2 (with CP Sketch)_R1.pdf September 06, 2023
1706.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-173 -Revision on Stair -50.pdf September 06, 2023
1707.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-174- Seismic Gap CoverGutter Detail Between MRF and Utility.pdf CSA September 06, 2023
1708.0 No. Transmittal; copy sent Through Email Material Submittal Register_05Sep23 - Requires Procurement Updates.pdf September 06, 2023
1709.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-170 - September 06, 2023
1710.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-776- Fire Det. & Alarm System Column Mounted_Det_FDA.pdf FIRE PRO September 12, 2023
1711.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-015-1.xlsx September 12, 2023
1712.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-015-1- Sht 1-4 Approved 5-8 R & R.pdf September 12, 2023
1713.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-041-0.xlsx September 12, 2023
1714.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-777 - SD Purlins Connection Detail for Guardhouse B.pdf CSA September 12, 2023
1715.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-041-0_Commented R & R.pdf September 12, 2023
1716.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-778- Response to Letter 115 - Shop Drawing Submittals.pdf September 12, 2023
1717.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-LTR-0115_Preparation SD for WIR.pdf September 12, 2023
1718.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-039_0_R1.xlsx September 12, 2023
1719.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-780 -SD Stair 50 Details at Main Office.pdf CSA September 12, 2023
1720.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-781-SD BK05 Precast Detail for Vas Mezzanine R1.pdf September 12, 2023
1721.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-021_rev.0_Sheet 2 of 2.pdf September 12, 2023
1722.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-021_rev.1_Sheet 1 of 2.pdf September 12, 2023
1723.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-782_ Non-Conformance Report (NCR) 018.pdf September 12, 2023
1724.0 No. Transmittal; copy sent Through Email SubStandard Reinforcing Mesh-photos.pdf September 12, 2023
1725.0 No. Transmittal; copy sent Through Email Design Mix Adjustments-Photos.pdf September 12, 2023
1726.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-784_ Non-Conformance Report (NCR) 020.pdf September 12, 2023
1727.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-728_ Non-Conformance Report (NCR) 014.pdf September 12, 2023
1728.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-785- Response to Letter No. 114 -NCR 14 External Wall.pdf September 12, 2023
1729.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-NCR-014.pdf September 12, 2023
1730.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-175 - Equipt. Deck Ext. Wall Cladding at Admin(2nd) Flr..pdf CSA September 12, 2023
1731.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-176 - DWG STAIR 29 Review.pdf CSA September 12, 2023
1732.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-DWG-ST29-0_01-03.xlsx September 12, 2023
1733.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-176 - DWG STAIR 29 Review.pdf CSA September 12, 2023
1734.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-DWG-ST30-0_01-04.xlsx September 12, 2023
1735.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-177 - ST30-001-004 STAIR 30 Review.pdf CSA September 12, 2023
1736.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-ST30-001 STAIR 30 - 3D & ELEVATION_REVA with September 12, 2023
comments.pdf
1737.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-ST30-002 STAIR 30 - SECTION A~C_REVA with comments.pdf September 12, 2023
1738.0 No. Transmittal; copy sent Through Email DRCS-SGI-PEB-ASI-DWG-ST34-0_01-03.xlsx September 12, 2023
1739.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-178- VAS Mezzanine - Stair 34 Review.pdf CSA September 12, 2023
1740.0 No. Transmittal; copy sent Through Email SGI-PEB-ASI-DWG-ST34-001_0 - Revised & Resubmit.pdf September 12, 2023
1741.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-071_ SLDC Ceiling Manhole Access Layout.pdf CSA September 12, 2023
1742.0 No. Transmittal; copy sent Through Email RE_ SOLID LF PROJECT - SGI-GEN-RFI-LFL-070_(Proposed Additional Conduits for September 12, 2023
Telecommunication).eml
1743.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-070_ Proposed Additional Conduits for Telco (with response).pdf ELECTRONICS September 12, 2023
1744.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-072_ Budgetary Rate for the Additional 4 PVC Pipes Conduits.pdf ELECTRICAL September 12, 2023
1745.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-787- MT Color Swatch Storm Proof Louver.pdf MECHANICAL September 12, 2023
1746.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-192-0_Approved.pdf September 12, 2023
1747.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-788 - MT Anti-Corrosion Tape & Wrap (DENSO) R1.pdf MECHANICAL September 12, 2023
1749.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-036_Sheet 1-4-0.xlsx September 12, 2023
1750.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-SCI-789- SD Typ Mounting Det. for Cable Tray.pdf ELECTRICAL September 12, 2023
1751.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-036-0 Sht.1-4_Commented R&R.pdf September 12, 2023
1752.0 No. Transmittal; copy sent Through Email Safety Walk Findings (#17)-July. 20 2023 .xlsx September 12, 2023
1753.0 No. Transmittal; copy sent Through Email Safety Walk Findings (#18)-Aug-18 2023.xlsx September 12, 2023
1754.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-786 - Safety Walk 17 & 18.pdf September 12, 2023
1755.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-038_0.xlsx September 12, 2023
1756.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-790- SD Grounding System at GenSet Room.pdf ELECTRICAL September 12, 2023
1758.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-039_0.xlsx September 12, 2023
1759.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-791- SD Grounding System at ELVSG-ADM Transformer.pdf ELECTRICAL September 12, 2023
1760.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-039-0_Commented R& R.pdf September 12, 2023
1761.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC- SD-EL-037_0.xlsx September 12, 2023
1762.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-792- SD Grounding System at MVSG -Transformer-LVSG.pdf ELECTRICAL September 12, 2023
1763.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-037-0_Commented R & R.pdf September 12, 2023
1764.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-793 - MT Fire Alarm Wire Cable (1x2x1.50mm²).pdf FIRE PRO September 12, 2023
1765.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-179-0_Approved.pdf September 12, 2023
1766.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-040_0.xlsx September 12, 2023
1767.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-794- SD Concrete Pedestal Post Typical Rebar Details.pdf CSA September 12, 2023
1768.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-040-0_Commented AOC.pdf September 12, 2023
1769.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-181.xlsx September 12, 2023

1770.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-795- Drainage Inlet CB Manhole Cover & Frame Cast Iron 600 x 25 mm H Traffic Type.pdf PLUMBING September 12, 2023

1771.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-181-0_Commented R & R.pdf September 12, 2023
1772.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-041_0.xlsx September 14, 2023
1773.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-798- SD Panel MDP-MO.pdf ELECTRICAL September 14, 2023
1774.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-041-0_Sht.1-3_Commented AOC.pdf September 14, 2023
1775.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-799- SCIC and Subcontractor's MEPF QAQC Review.pdf MECHANICAL September 14, 2023
1776.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-OTH-023-0_Approved.pdf September 14, 2023
1777.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-104_1.xlsx September 14, 2023
1778.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-797- MT First Private Pole-Load Break Switch Power Fuse.pdf ELECTRICAL September 14, 2023
1779.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-104-1_Commented R&R.pdf September 14, 2023
1780.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-044_0.xlsx September 14, 2023
1781.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-801- SD Elevator Shaft & Layout Review.pdf MECHANICAL September 14, 2023
1782.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-044_Sheet 1 of 2 with FF comments.pdf September 14, 2023
1783.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-044_Sheet 2 of 2 with FF comments.pdf September 14, 2023
1784.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-802- SD Outbound Water Line Layout & Isometric.pdf PLUMBING September 14, 2023
1785.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-025-0_Approved.pdf September 14, 2023
1786.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-024_2.xlsx September 14, 2023
1787.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-803- MS EMT_IMC Piping Inst. Supports&Brackets Acc.(FDAS).pdf ELECTRICAL September 14, 2023
1788.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-024-2_Commented AOC.pdf September 14, 2023
1789.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-167_0.xlsx September 14, 2023
1790.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-804- MT Angle Bar & Flat Bar Review.pdf CSA September 14, 2023
1791.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-167-0_Commented AOC.pdf September 14, 2023
1792.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-168-0_Approved.pdf September 14, 2023
1793.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-177_0.xlsx September 14, 2023
1794.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-805- MT Vibro Sand (Jantine & Black Ruby).pdf CSA September 14, 2023
1795.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-177-0_Commented AOC.pdf September 14, 2023
1796.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-800- RFI 40 Steel Structured Stair Review.pdf CSA September 14, 2023
1797.0 No. Transmittal; copy sent Through Email EPC-TQ-43 (detailed drawing to cover Gaps and Over lap of Canopies for Water September 14, 2023
Tightness) With CP Response.pdf
1798.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-073_ Drawing to cover Gaps and Over lap of Canopies for Water Tightness.pdf CSA September 14, 2023
1799.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-017 -0.xlsx September 14, 2023
1800.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-796- SD Ambient WH Public Address System Sht1-22.pdf ELECTRONICS September 14, 2023
1801.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-017-0 Commented File.pdf September 14, 2023
1802.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-035_0.xlsx September 14, 2023
1803.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-807- SD Typical Installation Details for Lightings Dock Area.pdf ELECTRICAL September 14, 2023
1804.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-035-0_Commented AOC.pdf September 14, 2023
1805.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-032_1.xlsx September 14, 2023
1806.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-808- SD EMT Pipe, Beam Clamp& Pipe Hanger Typ. Mntg.Details WH .pdf ELECTRICAL September 14, 2023
1807.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-032-1_Commented AOC.pdf September 14, 2023
1808.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-012_2.xlsx September 14, 2023
1809.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-809- SD Equipment Layout R2.pdf MECHANICAL September 14, 2023
1810.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-012-2 Sht 1-3_Commented AOC.pdf September 14, 2023
1811.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-806- MO1 PWD Toilet & Eyewash Plumbing & Water Line I.pdf PLUMBING September 14, 2023
1812.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-028-0_Approved.pdf September 14, 2023
1813.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-195_0.xlsx September 18, 2023
1814.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-813 - MT ME Sup. (Angle Bars, GI Full Thread Rod.pdf MECHANICAL September 18, 2023
1815.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-195-0_Commented AOC.pdf September 18, 2023
1816.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-814- SD AW Layout Fire Detection & Alarm System .pdf FIRE PRO September 18, 2023
1817.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-008-Approved.pdf September 18, 2023
1818.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-829.pdf September 18, 2023
1819.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIS-SD-EL-027_0.xlsx September 18, 2023
1820.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-815- SD Typical Mounting Detail of Lighting Arrester.pdf ELECTRICAL September 18, 2023
1821.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-027-0_Commented R & R.pdf September 18, 2023
1822.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-816 - MT for SikaGrout-212 Review.pdf CSA September 18, 2023
1823.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-193-0_Approved FF.pdf September 18, 2023
1824.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-008-1_FF.xlsx September 18, 2023
1825.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-817 - Metal Cladding BW Connection Detail GH R1.pdf CSA September 18, 2023
1826.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-008_rev.1_Sheet 1 of 2_Commented R & R.pdf September 18, 2023
1827.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-044_1.xlsx September 18, 2023
1828.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-818- SD Elevator Shaft & Layout R1Review.pdf MECHANICAL September 18, 2023
1829.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-044-1_Commented R & R.pdf September 18, 2023
1830.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-812 - MT Double Arm & Single Arm Steel Tapered Lamp .pdf ELECTRICAL September 18, 2023
1831.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-184-0_Commented NA.pdf September 18, 2023
1832.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-075_ LEED Requirements in terms of LF Design (fit-out) and September 18, 2023
Operations.pdf
1833.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-008_1.xlsx September 20, 2023
1834.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-814- SD AW Layout Fire Detection & Alarm System .pdf FIRE PRO September 20, 2023
1835.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-008-Sht 1-8-Approved_Sht.9 ( R & R).pdf September 20, 2023
1836.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-819 - MT Sliding Plate for Stairs Review.pdf CSA September 20, 2023
1837.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-172-0_Approved.pdf September 20, 2023
1838.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-018_0.xlsx September 20, 2023
1839.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-821- SD Proposed Conduit Layout at GENSET Room Review.pdf ELECTRICAL September 20, 2023
1840.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-018-0_Commented AOC.pdf September 20, 2023
1841.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-016_1.xlsx September 20, 2023
1842.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-822 - SD - Ramp 01 Details R1 Review.pdf CSA September 20, 2023
1843.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-823 - SD Fence Profile FN07 South East Side.pdf CSA September 20, 2023
1844.0 No. Transmittal; copy sent Through Email SGI-MW-SCSIC-SD-CV-024-0_Approved.pdf September 20, 2023
1845.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-824 - GA03 Manual Access Swing Tubular Door R2.pdf CSA September 20, 2023
1846.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-015-2_Approved.pdf September 20, 2023
1847.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-045_0.xlsx September 20, 2023
1848.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-825 - SD for Detail Drainage Sewer Manhole.pdf PLUMBING September 20, 2023
1849.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-023_0.xlsx September 20, 2023
1850.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-826 - SD Prop.New Elev. of Road 2 at East Side MO.pdf CSA September 20, 2023
1851.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-023-0_Commented R & R.pdf September 20, 2023
1852.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-827- SD - Typical Palisade Fence details for East Bdry R1 .pdf CSA September 20, 2023
1853.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-003 rev1 With CP Comments.pdf September 20, 2023
1854.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-828- SD - Typ. Str. Details of Dock Leveler R1.pdf CSA September 20, 2023
1855.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-035-1_Approved.pdf September 20, 2023
1856.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-829 - ITP 22 Waterproofing for Exterior Underground .pdf CSA September 20, 2023
1857.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-022-0_Approved.pdf September 20, 2023
1858.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-820- SD for Fire, Water&Rain Water PH Plans& Beam Det.pdf PLUMBING September 20, 2023
1859.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-040-0_Approved.pdf September 20, 2023
1860.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-035_0.xlsx September 20, 2023
1861.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-831 - MS Removal & Repair of Protruding Steel Fiber from Slab on.pdf CSA September 20, 2023
1862.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-035-0_Commented AOC.pdf September 20, 2023
1863.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-832- SCIC Response to NCR 017 Review.pdf September 20, 2023
1864.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-830 - MS Construction of Under Water Concrete Tank R2 .pdf PLUMBING September 20, 2023
1865.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-032_1.xlsx September 21, 2023
1866.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-808- SD EMT Pipe, Beam Clamp& Pipe Hanger Typ.pdf ELECTRICAL September 21, 2023
1867.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-032-1_Commented AOC..pdf September 21, 2023
1868.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-042_0.xlsx September 21, 2023
1869.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-834 - SD Conduit Route for Dock Leveler Supply and Control.pdf ELECTRICAL September 21, 2023
1870.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-042-0_Commented AOC.pdf September 21, 2023
1871.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-835 - SD Prop. Conduit Layout of CCTV on Site Dev. of SLF.pdf ELECTRONICS September 21, 2023
1872.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-021-0-Sht.1-8_Approved.pdf September 21, 2023
1873.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-836 - SD for Main Office Level 2 Electronics DataVoice.pdf ELECTRONICS September 21, 2023
1874.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-004-0_Approved.pdf September 21, 2023
1875.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-837 - SD Main Office Level 2 Plumbing Layout R1.pdf PLUMBING September 21, 2023
1876.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-006-1-Sht.1-2_Approved.pdf September 21, 2023
1877.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-838 - MT Valve, Water Meter and Hose Bib Review.pdf PLUMBING September 21, 2023
1878.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-196-0_Commented AOC.pdf September 21, 2023
1879.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-002_3.xlsx September 21, 2023
1880.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-839_ SD Lighting Arrester & Grounding Inst. Det.pdf ELECTRICAL September 21, 2023
1881.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-002-1 Sheet 7 & 8-Commented AOC.pdf September 21, 2023
1882.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-841 - SD Main Office Level 1& 2 Water Line Layout.pdf PLUMBING September 21, 2023
1883.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-009_1&2_Approved.pdf September 21, 2023
1884.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-842 - MS Weldable B.I. Fittings (PINOLEAKPES).pdf MECHANICAL September 21, 2023
1885.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-844 -Identification Plate for LVSG & MVSG.pdf September 21, 2023
1886.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-843 - SD for Grounding Mounting Details.pdf ELECTRICAL September 21, 2023
1887.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-034-0_Approved.pdf September 21, 2023
1888.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-840- MS Concrete Chipping &Restoration R1.pdf CSA September 21, 2023
1889.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-036-1_Approved.pdf September 21, 2023
1890.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-076_ LEED Requirements in terms of Warehouse LPD No Smoking Policy.pdf September 21, 2023
1891.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-846 - SD EL for Underground Piping Installation.pdf ELECTRONICS September 26, 2023
1892.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-045-0-Sht.1-3_Approved.pdf September 26, 2023
1893.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-847 - Installation of Ceiling Panel to SCIC.pdf CSA September 26, 2023
1894.0 No. Transmittal; copy sent Through Email SGI-CON-PEB-CI-ASI-170 -Instruction to PEB Contractor-SCIC Works to Ceiling September 26, 2023
Panels.pdf
1895.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-848- SD Reach Truck Battery Charger Insta. Plan&.pdf CSA September 26, 2023
1896.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-044-0_Approved.pdf September 26, 2023
1897.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-849- Electrical Ductbank Installation.pdf ELECTRICAL September 26, 2023
1898.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-845 - SD for Proposed Location of Electronics Sub Panels.pdf ELECTRONICS September 26, 2023
1899.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-019-0-Sht.1-5_Approved.pdf September 26, 2023
1900.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-852- ITP 32 Inst.Cable Pulling for Public Address, VoiceData.pdf ELECTRICAL September 26, 2023
1901.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-032-0_Approved.pdf September 26, 2023
1902.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-905.pdf September 26, 2023
1903.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-922.pdf September 26, 2023
1904.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-048.xlsx September 26, 2023
1905.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-850- SD for Equipment Trench Details.pdf ELECTRICAL September 26, 2023
1906.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-048-0_Sht1-2_Commented AOC.pdf September 26, 2023
1907.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-054.xlsx September 26, 2023
1908.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-853- MS Inst. Elec Junc.Utility & Pull Boxes&Wire.pdf ELECTRICAL September 26, 2023
1909.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-054-0_Commented AOC.pdf September 26, 2023
1910.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-854 - MT Rockwool Thermal Rock S R1 (Slab) .pdf CSA September 26, 2023
1911.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-855 - SD Main Office Roofdeck Storm Drain System Layo.pdf PLUMBING September 26, 2023
1912.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-031-0_Approved.pdf September 26, 2023
1913.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-856- SD MO LVL 1 - Plan & Sec. Details of Tapping Point to.pdf STRUCTURAL September 26, 2023
1914.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-857- SD Grounding System at MVSG_LVSG& Transformer R1.pdf ELECTRICAL September 26, 2023
1915.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-037-1_Approved.pdf September 26, 2023
1916.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-858- SD Grounding System at GenSet Room R1.pdf ELECTRICAL September 26, 2023
1917.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-038-1_Approved.pdf September 26, 2023
1918.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-859- SD Grounding System at ELVSG-ADM Trans. R1.pdf ELECTRICAL September 26, 2023
1919.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-039-1_Approved.pdf September 26, 2023
1920.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-046.xlsx September 26, 2023
1921.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-851- SD Conduit Route for Dock Leveler Supply and C.pdf ELECTRICAL September 26, 2023
1922.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-046-0_Commented AOC.pdf September 26, 2023
1923.0 No. Transmittal; copy sent Through Email SCIC-SD-EL-001_Proposed Additional Conduits for Telco_R1.pdf September 26, 2023
1924.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-861- Addtional 4 Conduit Ductbank for Telco.pdf ELECTRICAL September 26, 2023
1925.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-047.xlsx September 26, 2023
1926.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-860- SD Conduit Route for OB Area of Wall Mounted .pdf ELECTRICAL September 26, 2023
1927.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-047-1_Sht.1-4_Commented AOC.pdf September 26, 2023
1928.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-199-0.xlsx September 27, 2023
1929.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-862 - MT for Water Hammer Arrestor (Tutto).pdf PLUMBING September 27, 2023
1930.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-199-0_Commented AOC.pdf September 27, 2023
1931.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-863 - ITP 36 Concrete Coring and Chipping Works for .pdf MECHANICAL September 27, 2023
1932.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-864-Response RFI-38 AR Dwg.doc.pdf September 27, 2023
1933.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-865- RFI-42 Type of Doors along MO at Ground Floor.doc.pdf September 27, 2023
1934.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-866- RFI-34 Detail of IB & OB Office Parapet Capping.doc.pdf September 27, 2023
1935.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-866- RFI-34 Detail of IB & OB Office Parapet Capping.doc.pdf September 27, 2023
1936.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-867- MT Metal Frames with Accessories for Ceiling .pdf September 27, 2023
1937.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-201-0_Approved.pdf September 27, 2023
1938.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-868- MT Black Iron Sheets Gauge # 16 (Regan Industrial.pdf September 27, 2023
1939.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-203-0_Approved.pdf September 27, 2023
1940.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-870- Fault Data Form (MERALCO).pdf September 27, 2023
1941.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-872- SD Walkway Foundation Layout Plan.pdf CSA September 28, 2023
1942.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-043-0_Approved.pdf September 28, 2023
1943.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-181-1.xlsx September 28, 2023

1944.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-873- Drainage Inlet CB Manhole Cover & Frame Cast Iron 600 x 25 mm H Traffic Type.pdf PLUMBING September 28, 2023

1945.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-181_rev.1-Commented R & R.pdf September 28, 2023
1946.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-874- SD - Drainage Inlet Manhole Cover (Grating).pdf PLUMBING September 28, 2023
1947.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-025-0_Approved.pdf September 28, 2023
1948.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-050_0.xlsx September 28, 2023
1949.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-875- SD Above Ceiling Lighting Typical Mounting Details WH.pdf ELECTRICAL September 28, 2023
1950.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-050-0_Commented AOC.pdf September 28, 2023
1951.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-081_1.xlsx September 28, 2023
1952.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-876- Chilled Water Pump - ETANORM.pdf MECHANICAL September 28, 2023
1953.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-081-1_Commented AOC.pdf September 28, 2023
1954.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-204_0.xlsx September 28, 2023
1955.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-877- MT Water Heater & Water Heater Multipoint (ECO.pdf MECHANICAL September 28, 2023
1956.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-204-0_Commented AOC.pdf September 28, 2023
1957.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-878- ITP 35 Inst.of Elec. Junc. Utility & Pull Boxes&.pdf ELECTRICAL September 28, 2023
1958.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-035-0_Approved.pdf September 28, 2023
1959.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-879- MS for Installation of Fire Protection R2 Review.pdf FIRE PRO September 28, 2023
1960.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-025 -0.xlsx September 28, 2023
1961.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-871- SD Windows Schedule & Details.doc.pdf CSA September 28, 2023
1962.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-025-0_Comments-27Sep23.pdf September 28, 2023
1963.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-880- Weekly Progress & LEED Submittal Reports.pdf September 28, 2023
1964.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-181-1.xlsx September 28, 2023

1965.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-873- Drainage Inlet CB Manhole Cover & Frame Cast Iron 600 x 25 mm H Traffic Type.pdf PLUMBING September 28, 2023

1966.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-181_rev.1-Commented R & R.pdf September 28, 2023
1967.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-046_0.xlsx September 28, 2023
1968.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-885- SD Reinf. & Manhole Cover Details .pdf STRUCTURAL September 28, 2023
1969.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-046-0_Commented R & R.pdf September 28, 2023
1970.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-886- SD for Detail Drainage Sewer Manhole R1 Review.pdf PLUMBING September 28, 2023
1971.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-045_Rev.1_Sheet 1 of 3-Approved.pdf September 28, 2023
1972.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-045_Rev.1_Sheet 2 of 3_Approved.pdf September 28, 2023
1973.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-045_Rev.1_Sheet 3 of 3._Approved.pdf September 28, 2023
1974.0 No. Transmittal; copy sent Through Email BE-3002 Site light Layout.pdf September 28, 2023
1975.0 No. Transmittal; copy sent Through Email LAMP POST ON WALL.dwg September 28, 2023
1976.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-887- Site Development Outdoor Lighting Layout Road.pdf ELECTRICAL September 28, 2023
1977.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-884- MT Double Arm & Single Arm Steel Tapered Lamp Post .pdf ELECTRICAL September 28, 2023
1978.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-205-0_Approved.pdf September 28, 2023
1979.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-081_1.xlsx September 02, 2023
1980.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-876- Chilled Water Pump - ETANORM.pdf MECHANICAL September 02, 2023
1981.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-081-1_Commented AOC.pdf September 02, 2023
1982.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-846 - SD EL for Underground Piping Installation....pdf PLUMBING September 02, 2023
1983.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-045-0-Sht.1-3_Approved.pdf September 02, 2023
1984.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-883- SCIC (Wall Demolition at MRF - Utility).pdf CSA September 02, 2023
1985.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-888- SD Prop Pipe Support & Sprinkler.pdf FIRE PRO September 02, 2023
1986.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-003-0_Approved.pdf September 02, 2023
1987.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-185_1.xlsx September 02, 2023
1988.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-889- MT Cable Tray Ladder Type with Wire Mesh R1.pdf ELECTRICAL September 02, 2023
1989.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-185-1_Commented AOC.pdf September 02, 2023
1990.0 No. Transmittal; copy sent Through Email Project Optimus - Cad Files (092523).zip September 02, 2023
1991.0 No. Transmittal; copy sent Through Email Project Optimus - Gym.pdf September 02, 2023
1992.0 No. Transmittal; copy sent Through Email Project Optimus - Gym RCP.pdf September 02, 2023
1993.0 No. Transmittal; copy sent Through Email Project Optimus - Inbound Dock Office RCP 091823.pdf September 02, 2023
1994.0 No. Transmittal; copy sent Through Email Project Optimus - Main Office RCP 091823.pdf September 02, 2023
1995.0 No. Transmittal; copy sent Through Email Project Optimus - Main Office RCP 091823 (2).pdf September 02, 2023
1996.0 No. Transmittal; copy sent Through Email Project Optimus - Outbound Dock Office RCP (091823).pdf September 02, 2023
1997.0 No. Transmittal; copy sent Through Email Project Optimus - RCP (Overlayed Lighting).zip September 02, 2023
1998.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-881- SCIC Scope on GSTS Sign-off layouts.doc.pdf CSA September 02, 2023
1999.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-049_0.xlsx September 02, 2023
2000.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-891- ELectrical SD Underground Piping Installation.pdf ELECTRICAL September 02, 2023
2001.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-049-0_Commented AOC.pdf September 02, 2023
2002.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-043_0.xlsx September 02, 2023
2003.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-892- SD Typical Installation Details Dock Leveler and Cont.pdf MECHANICAL September 02, 2023
2004.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-043-0_Approved.pdf September 02, 2023
2005.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-893- MT Fire Rated TF Wires for Fire Det.&Alarm.pdf ELECTRICAL September 02, 2023
2006.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-207-0_Approved.pdf September 02, 2023
2007.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-894- MT First Private Pole-Load Break Switch Power Fuse.pdf ELECTRICAL September 02, 2023
2008.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-895- SD- BA13 Guardrail at Exterior R2.pdf CSA September 02, 2023
2009.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-010-2_Approved.pdf September 02, 2023
2010.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-896- SD-BA13 and GA03 Guardrail at Interior.pdf CSA September 02, 2023
2011.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-011_rev.2_Sheet 1 of 2_Approved.pdf September 02, 2023
2012.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-011_rev.2_Sheet 2 of 2_Approved.pdf September 02, 2023
2013.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-897- MT Sealbond 218-P Review.pdf CSA September 02, 2023
2014.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-190-0_Approved.pdf September 02, 2023
2015.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-178_0.xlsx September 02, 2023
2016.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-898- MT Powerfix FRM (SkyBird) Review.pdf CSA September 02, 2023
2017.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-178-0_ACommented AOC.pdf September 02, 2023
2018.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-022-0_Sht.1-9.xlsx September 02, 2023
2019.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-899- SD Drywall Connection Detail for Admin Bldg.pdf CSA September 02, 2023
2020.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-022_Commented R & R.pdf September 02, 2023
2021.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-036_Sheet 1-5_1.xlsx September 02, 2023
2022.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-890- SD Typ Mtng. Det. for Cab.Tray -Panel AW, MDP-MO.pdf ELECTRICAL September 02, 2023
2023.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-036-1_Commented AOC.pdf September 02, 2023
2024.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-197_0.xlsx September 02, 2023
2025.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-900- MT Toilet Partition and Accessories .doc.pdf PLUMBING September 02, 2023
2026.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-197-0_Commented AOC.pdf September 02, 2023
2027.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-902- RFI-33 Final Elev. of Metal Wall Cladding.pdf CSA September 02, 2023
2028.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RFI-033 with CP response.pdf September 02, 2023
2029.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-036_Sheet 1-5_1.xlsx September 02, 2023
2032.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-197_0.xlsx September 02, 2023
2038.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-198-0_Approved.pdf September 02, 2023
2039.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-887_Corrected.pdf September 03, 2023
2040.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-205_0.xlsx September 03, 2023
2041.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-884- MT Double Arm & Single Arm Steel .pdf ELECTRICAL September 03, 2023
2042.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-205-0_Commented AOC.pdf September 03, 2023
2043.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-905- SD FM 200 Fire Suppression System.pdf FIRE PRO September 03, 2023
2044.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-005-0_Sht1-7_Approved.pdf September 03, 2023
2045.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-906- MS Installation of Devices and Accessories.pdf MECHANICAL September 03, 2023
2046.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-051-0_Approved.pdf September 03, 2023
2047.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-907- MEPFS(Insta. of ugPiping & Fire Hydrant_Anti-Corrosion Sys.).pdf MECHANICAL September 03, 2023
2048.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-037-0_Approved.pdf September 03, 2023

2049.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-908- MS MEPFS(Insta. of ugPiping & Fire Hydrant_Anti-Corrosion Sys.).pdf FIRE PRO September 03, 2023

2050.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-037-0_Approved.pdf September 03, 2023
2051.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-909- MT Control Valve and Swing Check Valve (AVK).pdf PLUMBING September 03, 2023
2052.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-206-0_Commented AOC.pdf September 03, 2023
2053.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-008_2.xlsx September 03, 2023
2054.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-904- SD AW Layout Fire Detection & Alarm Sys.pdf ELECTRONICS September 03, 2023
2055.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-008 Sht.9-12_Commented AOC.pdf September 03, 2023
2056.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-FP-004-0_sht.1-4.xlsx September 03, 2023
2057.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-910- SD Proposed for Proposed Riser Layout.doc.pdf FIRE PRO September 03, 2023

2058.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-004_Sheet 1 of 4_with CP Comments.pdf September 03, 2023

2059.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-004_Sheet 2 of 4_with CP Comments.pdf September 03, 2023

2060.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-004_Sheet 3 of 4_with CP comments.pdf September 03, 2023

2061.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-004_Sheet 4 of 4_with CP Comments.pdf September 03, 2023

2062.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-911- SD Partition Walls between Road-2, UG Tanks .pdf PLUMBING September 04, 2023

2063.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-017_rev.3_Sheet 1 of 2_Approved.pdf September 04, 2023

2064.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-017_rev1_Sheet 2 of 2_Approved.pdf September 04, 2023

2065.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-912- MS for LV Cable Installation_Pulling.pdf ELECTRONICS September 04, 2023

2066.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-057-0_Approved.pdf September 04, 2023

2067.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-913 - MT Valve, Water Meter and Hose R1 Review.pdf PLUMBING September 04, 2023

2068.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-038_0.xlsx September 04, 2023

2069.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-914- ITP 38 -for LVSG Cable System.pdf ELECTRONICS September 04, 2023

2070.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-038-0_Commented R & R.pdf September 04, 2023

2071.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-055-0.xlsx September 04, 2023

2072.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-915- MS Hydrotesting of Fire Protection Sys. Review.pdf FIRE PRO September 04, 2023

2073.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-026_0.xlsx September 04, 2023

2074.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-916- SD BA04 Review.pdf CSA September 04, 2023

2075.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-026_Sheet 1_Commented R&R.pdf September 04, 2023

2076.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-026_Sheet 2_Commented R&R.pdf September 04, 2023

2077.0 No. Transmittal; copy sent Through Email 1.0 SGI-CON-MW-SCIC-RPT-001__03Oct23.pdf September 04, 2023

2078.0 No. Transmittal; copy sent Through Email 2.0 SGI-CON-MW-SCIC-LIST-001_Under Review _03Oct23.pdf September 04, 2023

2079.0 No. Transmittal; copy sent Through Email 2.1 SGI-CON-MW-SCIC-AG-RPT-002-0_03Oct23.pdf September 04, 2023

2080.0 No. Transmittal; copy sent Through Email 3.0 SD Status Report as of 03 October 2023 03Oct23.pdf September 04, 2023

2081.0 No. Transmittal; copy sent Through Email 4.0 MT Status Report as of 03 October 2023 03Oct23.pdf September 04, 2023

2082.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-053_0.xlsx September 06, 2023
2083.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-917- MS Cable Pulling for Public Address, Voice .pdf ELECTRONICS September 06, 2023
2084.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-053-0_Commented R & R.pdf September 06, 2023
2085.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-919 - SD Prop. Loc. of Water Pump Room for Potable WL R1 .pdf PLUMBING September 06, 2023
2086.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-918-Secondary Support for FDAS&Electrical Secondary Support for FDAS&Electrical Maintenance.pdf ELECTRICAL September 06, 2023
Maintenance.pdf
2087.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-209_0.xlsx September 06, 2023
2088.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-923- MT Variable Frequency Air Drive Controller CWP.pdf MECHANICAL September 06, 2023
2089.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-209-0_Commented AOC.pdf September 06, 2023
2090.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-208_0.xlsx September 06, 2023
2091.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-924- MT Swing Check Valve. without lever and weight, PN 1016.pdf PLUMBING September 06, 2023
2092.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-925- ITP EMTIMC Conduits, Junction Boxes and Supports.pdf FIRE PRO September 06, 2023
2093.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-034-0_Approved.pdf September 06, 2023
2094.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-050-0.xlsx September 06, 2023
2095.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-927- MS GroundingLightning Protection Testing.pdf ELECTRICAL September 06, 2023
2096.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-050-0_Commented R&R.pdf September 06, 2023
2097.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-020_1.xlsx September 06, 2023
2098.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-921- SD Drywall Framing Detail R1 Review.pdf CSA September 06, 2023
2099.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-020 rev1 with Comments.pdf September 06, 2023
2100.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-047_0.xlsx October 11, 2023
2101.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-929- SD Site Development CCTV System Review.pdf ELECTRONICS October 11, 2023
2102.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-047_1&2_Commented AOC.pdf October 11, 2023
2103.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-ITP-029-0.xlsx October 11, 2023

2104.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-928- ITP's Grnding.Lightning Pro.&EMTIMC Conduits, Boxes&Sup..pdf ELECTRICAL October 11, 2023

2105.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-029-0_Commented R&R.pdf October 11, 2023
2106.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-030-0_Approved.pdf October 11, 2023
2107.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-931- MS Public Address, TelephoneData Installation o.pdf ELECTRONICS October 11, 2023
2108.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-059-0_Approved.pdf October 11, 2023
2109.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-932- MS Public Address, TelephoneData Inst. Sup..pdf ELECTRONICS October 11, 2023
2110.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-060-0_Approved.pdf October 11, 2023
2111.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-058_0.xlsx October 11, 2023
2112.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-933- MS FDAS Rough Ins and Conduiting (Dry WallCHB.pdf FIRE PRO October 11, 2023
2113.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-058-0_Commented R& R.pdf October 11, 2023
2114.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-058_0.xlsx October 11, 2023
2115.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-933- MS FDAS Rough Ins and Conduiting (Dry WallCHB.pdf FIRE PRO October 11, 2023
2116.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-058-0_Commented R& R.pdf October 11, 2023
2117.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-935- Rel. of Door D1-126-L and D1-31-K at GF Admin .pdf October 11, 2023
2118.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-934- ITP's Electonics Review.pdf October 11, 2023
2119.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-038-1_Approved.pdf October 11, 2023
2120.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-039-0_Approved.pdf October 11, 2023
2121.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-040-0_Approved.pdf October 11, 2023
2122.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-041-0_Approved.pdf October 11, 2023
2123.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-042-0_Approved.pdf October 11, 2023
2124.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-930 - SD UG Fuel Tank Piping Layout & Det R1 Review.pdf PLUMBING October 11, 2023
2125.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-005-1 Sht1-4_Approved.pdf October 11, 2023

2126.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-078_ 2.20m High Concrete Partition ,No Metal Cladding Between MRF & Rejected Goods.pdf October 11, 2023

2127.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-079_ Energy Management System.pdf October 11, 2023
2128.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-025 -0.xlsx October 11, 2023
2129.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-871- SD Windows Schedule & Details.doc.pdf CSA October 11, 2023

2130.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-025_Shop Drawing Review_Beca.pdf October 11, 2023

2131.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-025-0_Comments-27Sep23.pdf October 11, 2023
2132.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-936- SD Windows Schedule & Details Review.doc.pdf CSA October 12, 2023
2133.0 No. Transmittal; copy sent Through Email Glazing SD 10112023.zip October 12, 2023
2134.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-052_0.xlsx October 12, 2023
2135.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-937- SD VAS Mezzanine Power Layout Review.pdf ELECTRICAL October 12, 2023

2136.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-052-0Sht.1-7_Commented AOC.pdf October 12, 2023

2137.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-938- Above Ceiling CWP Layout, Sec&Det..pdf PLUMBING October 12, 2023
2138.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-004-1_Sht.1-4_Approved.pdf October 12, 2023
2139.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-940- Drainage Inlet CB Manhole Cover & Frame Cast Iron R2.pdf PLUMBING October 13, 2023
2140.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-181_Rev.2_Approved.pdf October 13, 2023
2141.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-061_0.xlsx October 13, 2023
2142.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-939- MS Public Add,TelephoneData Inst.Box Setting.pdf ELECTRONICS October 13, 2023
2143.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-061-0_Commented AOC.pdf October 13, 2023
2144.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-PL-032_0.xlsx October 13, 2023
2145.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-941 - SD Inbond Roof Deck Storm Drain Layout.pdf PLUMBING October 13, 2023
2146.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-032-0_Commented AOC.pdf October 13, 2023
2147.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-023_1.xlsx October 13, 2023
2148.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-942- SD Typical Palisade Fence Detail FN-07 R1.pdf CSA October 13, 2023
2149.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-023-1_Commented AOC.pdf October 13, 2023
2150.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-943- MT Threaded Rod and Chemical Anchor (RAWLPLUG).pdf ELECTRICAL October 13, 2023
2151.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-211-0_Approved.pdf October 13, 2023
2152.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-944- SD Warehouse Level 1 Conduit Layout.pdf ELECTRICAL October 16, 2023
2153.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-055-0_Approved.pdf October 17, 2023
2154.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-740 - MS EMTIMC Piping Installation R1 Review .pdf ELECTRICAL October 17, 2023
2155.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-025-1_Approved (16Oct2023).pdf October 17, 2023
2156.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-953- SD Typ. Installation Det. Ductbank to Cable Tray.pdf ELECTRICAL October 17, 2023
2157.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-056-0_Approved.pdf October 17, 2023
2158.0 No. Transmittal; copy sent Through Email LEED Construction Phase Cx - Construction Test Checklist.pdf October 17, 2023
2159.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-955- QAQC & LEED Document Requirements.pdf ELECTRICAL October 17, 2023
2160.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-956- SD for Grounding System at Battery Room.pdf ELECTRICAL October 17, 2023
2161.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-053-0_Approved.pdf October 17, 2023
2162.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-054_0.xlsx October 17, 2023
2163.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-957- SD Cable Tray No. 1 and 4 Typical Mounting Detai.pdf ELECTRICAL October 17, 2023
2164.0 No. Transmittal; copy sent Through Email Photos with comments 1.pdf October 17, 2023
2165.0 No. Transmittal; copy sent Through Email Photos with comments 2.pdf October 17, 2023
2166.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-958- Rectification of Louver Opening at Battery.pdf MECHANICAL October 17, 2023
2167.0 No. Transmittal; copy sent Through Email SKETCH LOUVER OPENING @ BATTERY ROOM.pdf October 17, 2023
2168.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-952- MS Installation of EMTIMC Conduits R1.pdf ELECTRICAL October 17, 2023
2169.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-021-1_Approved.pdf October 17, 2023
2170.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-959- Equip. Min. Space Req. at the ME Roof Deck MECHANICAL October 17, 2023
2171.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-025_Sheet 1 of 2.pdf October 19, 2023
2172.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-025_Sheet 2 of 2.pdf October 19, 2023
2173.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-1015.pdf October 19, 2023
2174.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-960- SD Roof Ventilator Framing & Bolt Provision Det.pdf MECHANICAL October 19, 2023
2175.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-024_Approved.pdf October 19, 2023
2176.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-025_0.xlsx October 19, 2023
2177.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-961- SD Pro. MO Roof Deck Chilled Water Piping Layout .pdf PLUMBING October 19, 2023
2178.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-025-0_Commented AOC.pdf October 19, 2023
2179.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-RPT-014_0.xlsx October 19, 2023
2180.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-962- Rpt for MW Straight Edge Measurement Review.pdf STRUCTURAL October 19, 2023
2181.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RPT-014-0_Commented R & R.pdf October 19, 2023
2182.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-963- SD Outbound Roof Deck Storm Drain Layout Review.pdf PLUMBING October 19, 2023
2183.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-033-0_Approved.pdf October 19, 2023
2184.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-964- SD Anchor Bolt Setting for Pedestal at Walkway Founda.pdf STRUCTURAL October 19, 2023
2185.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-048-0_Approved.pdf October 19, 2023
2186.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-049_0.xlsx October 19, 2023
2187.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-965- SD for Stair 57 Details at Inbound Office Review.pdf STRUCTURAL October 19, 2023
2188.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-049_Sheet 1_Commented R & R.pdf October 19, 2023
2189.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-049_Sheet 2_Commented R & R.pdf October 19, 2023
2190.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-PL-027_0.xlsx October 19, 2023
2191.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-966- SD for GenSet Facility Room Oil Pit & Trench Plumb.pdf MECHANICAL October 19, 2023
2192.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-027-0_Commented R & R.pdf October 19, 2023
2193.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-967- MT for Water Hammer Arrestor (Tutto).pdf PLUMBING October 19, 2023
2194.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-199-1_Approved.pdf October 19, 2023
2195.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-968 - MT Homogenous Tiles for Walls & Floors.pdf CSA October 19, 2023
2196.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-200-0_Approved.pdf October 19, 2023
2197.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-969- MT Polyolefin Duct Lining (ACE FOAM) R1.pdf MECHANICAL October 19, 2023
2198.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-151_1_Approved.pdf October 19, 2023
2199.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-960- SD Roof Ventilator Framing & Bolt Provision Det.pdf MECHANICAL October 19, 2023
2200.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-024_Approved.pdf October 19, 2023
2201.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-057 Sht1-9_0.xlsx October 19, 2023
2202.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-973- SD for Panel Location Details Review.pdf ELECTRICAL October 19, 2023
2203.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-057-0Sht.1-9_Commented AOC.pdf October 19, 2023
2204.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-974- MT Class 1 Division 1 at Battery Room .pdf ELECTRICAL October 19, 2023
2205.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-212-0_Approved..pdf October 19, 2023
2206.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-972-SD for Fire Detection& Alarm System - External.pdf October 19, 2023
2207.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-020-0_Approved.pdf October 19, 2023
2208.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-979- MT Manhole Cover & Frame, Auxiliary Drainage Cover.pdf PLUMBING October 19, 2023
2209.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-156-1_Approved.pdf October 19, 2023
2210.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-204_1.xlsx October 19, 2023
2211.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-970- Water Heater Multipoint (ECOTHERM) R1.pdf MECHANICAL October 19, 2023
2212.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-204-1_Commented AOC.pdf October 19, 2023
2213.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-971- Misaligned DownSpout Connections PLUMBING October 19, 2023
2214.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-976- Backfilling of Admin Elev Pit & Repair work MECHANICAL October 19, 2023
2215.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-977- Damage metal cladding due to flux welding CSA October 19, 2023
2216.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-978- MEP Ceiling Works MECHANICAL October 19, 2023
2217.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-980- RFI 46 - Door Location at Vas Mezzanine.doc CSA October 19, 2023
2218.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-080_0.xlsx October 23, 2023
2219.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-982- MT Mechanical (Expansion Tank)CHROS.pdf MECHANICAL October 23, 2023
2220.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-080-1_Commented AOC.pdf October 23, 2023
2221.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-213_0.xlsx October 23, 2023
2222.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-983- MT Base Coarse (PATAVIUM) Review.pdf CSA October 23, 2023
2223.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-213-0_Commented R & R.pdf October 23, 2023
2224.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-062_0.xlsx October 23, 2023
2225.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-984- MS Installation of Wall and Floor Tiles for Toilet.pdf CSA October 23, 2023
2226.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-062-0_Approved.pdf October 23, 2023
2227.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-981- MT Fans and Blowers (SYSTEM AIR).pdf MECHANICAL October 23, 2023
2228.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-194-0_Commented AOC.pdf October 23, 2023
2229.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-988- Stair 25 Foundation CSA October 24, 2023
2230.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-987-SD - Typical Palisade Fence details for East Bdry R2 .pdf CSA October 24, 2023
2231.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-003-2_Approved.pdf October 24, 2023
2232.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-014_0.xlsx October 24, 2023
2233.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-986- SD Prop Above Ceiling Conduit Layout and Det..pdf ELECTRICAL October 24, 2023
2234.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-014_Commented AOC.pdf October 24, 2023
2235.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-989-WIR - Work Flow & MW Contractor Inspection Requirements.pdf November 07, 2023
2236.0 No. Transmittal; copy sent Through Email SGI-GEN-SCIC-SO-001.xlsx November 07, 2023
2237.0 No. Transmittal; copy sent Through Email AA-3145 IFC REV2.pdf November 07, 2023
2238.0 No. Transmittal; copy sent Through Email Proposed Solution.png November 07, 2023
2239.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-991-Seismic Gap Covers.pdf November 07, 2023
2240.0 No. Transmittal; copy sent Through Email AA-3111 IFC REV2 - Ambient Warehouse_Part-1.pdf November 07, 2023
2241.0 No. Transmittal; copy sent Through Email AA-3112 IFC REV2 - Ambient Warehouse_Part-2.pdf November 07, 2023
2242.0 No. Transmittal; copy sent Through Email AA-3113 IFC REV2 - Ambient Warehouse_Part-3.pdf November 07, 2023
2243.0 No. Transmittal; copy sent Through Email AA-3114 IFC REV2- Ambient Warehouse_Part-4.pdf November 07, 2023
2244.0 No. Transmittal; copy sent Through Email Project Optimus - Guard House & Gym_PTDC.pdf November 07, 2023
2245.0 No. Transmittal; copy sent Through Email Project Optimus - Inbound Dock Office_PTDC.pdf November 07, 2023
2246.0 No. Transmittal; copy sent Through Email Project Optimus - Main Office Part-1_PTDC.pdf November 07, 2023
2247.0 No. Transmittal; copy sent Through Email Project Optimus - Main Office Part-2_PTDC.pdf November 07, 2023
2248.0 No. Transmittal; copy sent Through Email Project Optimus - Outbound Dock Office_PTDC.pdf November 07, 2023
2249.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-081_ Doors with Electronic Access and Fire Alarm System.pdf ELECTRONICS November 07, 2023
2250.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-990- Submission of MS for the Installation of Roof Exhauster MECHANICAL November 07, 2023
2251.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-992-RFI 41 - CCTV Cabinet Elevations ELECTRONICS November 07, 2023
2252.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1000- ROOF EXHAUSTER and other long lead items MECHANICAL November 07, 2023
2253.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-031_0.xlsx November 07, 2023
2254.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1001- SD for WG01 Wheel Guide Pair.pdf CSA November 07, 2023
2255.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-031_CP Comments.pdf November 07, 2023
2256.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-049_1.xlsx November 07, 2023
2257.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-996- SD for Stair 57 Details at Inbound Office R1 Review.pdf CSA November 07, 2023
2258.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-049_rev.1_Sheet 1 of 2_Commented R & R.pdf November 07, 2023
2259.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-049_rev.1_Sheet 2 of 2_Commented R & R.pdf November 07, 2023
2260.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-026_1.xlsx November 07, 2023
2261.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-997- SD BA04 R1 Review.pdf CSA November 07, 2023
2262.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-026_rev.1_Sheet 1 of 2.pdf November 07, 2023
2263.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-026_rev.1_Sheet 2 of 2.pdf November 07, 2023
2264.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-033_0.xlsx November 07, 2023
2265.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-999- SD for Tile Layout for Toilet at Outbound Buildi.pdf CSA November 07, 2023
2266.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-033_CP Comments (1).pdf November 07, 2023
2267.0 No. Transmittal; copy sent Through Email catch basin detail.pdf November 07, 2023
2268.0 No. Transmittal; copy sent Through Email Inbound outbound additional catchbasin.pdf November 07, 2023
2269.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-998- Additional Catch Basin @ IB &OB Offices.pdf PLUMBING November 07, 2023
2270.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-049_1.xlsx November 07, 2023
2271.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-996- SD for Stair 57 Details at Inbound Office R1 Review.pdf CSA November 07, 2023
2272.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-049_rev.1_Sheet 1 of 2_Commented R & R.pdf November 07, 2023
2273.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-049_rev.1_Sheet 2 of 2_Commented R & R.pdf November 07, 2023
2274.0 No. Transmittal; copy sent Through Email 28092023 Responsibility Matrix_Rev 2.pdf November 07, 2023
2275.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-082_ Responsibility Matrix Rev 2 for Interior Works.pdf CSA November 07, 2023
2276.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1003 - Power Layout Locations.pdf November 07, 2023
2277.0 No. Transmittal; copy sent Through Email v2 Project Optimus - Power Layout (100323) (1).zip November 07, 2023
2278.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1005 - SD OB Bldg. Level 1 & Level 2 Power and Light.pdf ELECTRICAL November 07, 2023
2279.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-059-0_Sheet 1-3_Approved.pdf November 07, 2023
2280.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-058_0.xlsx November 07, 2023
2281.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1006 - SD Duct Bank Pedestal & Cable Tray Telco Line Layout.pdf ELECTRICAL November 07, 2023
2282.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-058-0_Sheet 1-4 Commented AOC.pdf November 07, 2023
2283.0 No. Transmittal; copy sent Through Email 28092023 Responsibility Matrix_Rev 2 November 07, 2023
2284.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1010 - SD - Site Fence Stationing Layout R1 Review.pdf CSA November 07, 2023
2285.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-007-1_Approved.pdf November 07, 2023
2286.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-026_0.xlsx November 07, 2023
2287.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1011 - SD Adjusted Layout of Center Island at Gua.pdf CSA November 07, 2023
2288.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-CV-026-0_Commented R & R.pdf November 07, 2023
2289.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-051_0.xlsx November 07, 2023
2290.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1012 - SD for Schedule of Loads Review.pdf CSA November 07, 2023
2291.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051-0-Sht.1-7_Commented R&R.pdf November 07, 2023
2292.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-026 Sht1-3_0.xlsx November 07, 2023
2293.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1015 - SD Prop. OB Dock Office Roof Lvl CWP Layout.pdf PLUMBING November 07, 2023
2294.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-026_Sheet 2 of 3_With CP Comments.pdf November 07, 2023
2295.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-026_Sheet 3 of 3_With CP Comments.pdf November 07, 2023
2296.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-026 Sht1-3_0.xlsx November 07, 2023
2297.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1015 - SD Prop. OB Dock Office Roof Lvl CWP Layout.pdf PLUMBING November 07, 2023
2298.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-026_Sheet 2 of 3_With CP Comments.pdf November 07, 2023
2299.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-026_Sheet 3 of 3_With CP Comments.pdf November 07, 2023
2300.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1007 - SD Prop.OB Dock Office 2 CWP& Mis. Details.pdf PLUMBING November 07, 2023
2301.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-029-0_Approved.pdf November 07, 2023
2302.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-029-0_Approved.pdf November 07, 2023
2303.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1009 - SD Prop. OBDock Office Lvl 1 ACMV Layout & MECHANICAL November 07, 2023
2304.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1014- Additional Layer CHB on Top of Roof Beam at Utility Bldg CSA November 07, 2023
2305.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1016 - Termination of FOCC Partition Wall at Curtain Wall ELECTRONICS November 07, 2023
2306.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-060_0.xlsx November 07, 2023
2307.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1018 - SD OB and IB Dock Leveller Control Layout at GL 23.pdf ELECTRONICS November 07, 2023
2308.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-060-0_Commented AOC.pdf November 07, 2023
2309.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-FP-009_0.xlsx November 07, 2023
2310.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1019- SD WH Ceiling Level FP Layout - GF Review.pdf CSA November 07, 2023
2311.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-009-0_Commented AOC.pdf November 07, 2023
2312.0 No. Transmittal; copy sent Through Email Change Louver to HDG Handrails at IB & OB Roof Deck - 1.jpg November 07, 2023
2313.0 No. Transmittal; copy sent Through Email Change Louver to HDG Handrails at IB & OB Roof Deck - 2.jpg November 07, 2023
2314.0 No. Transmittal; copy sent Through Email Deck railing at Inbound Outbound.pdf November 07, 2023
2315.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1020 - Change of Louver to HDG Handrails at IB&OB.pdf CSA November 07, 2023
2316.0 No. Transmittal; copy sent Through Email BE-3103 R2 - Above Ceiling Lvl Lighting Layout -T5.pdf November 07, 2023
2317.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1017 - Reduction of T5 Lights Above the Warehouse Ceiling.pdf CSA November 07, 2023
2318.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1025- MO Level 1&2 &IB Dock Office AC Drain Layouts.doc.pdf PLUMBING November 13, 2023
2319.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-034-0_Approved.pdf November 13, 2023
2320.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-035-0_Approved.pdf November 13, 2023
2321.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-036-0_Approved.pdf November 13, 2023
2322.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-034_0.xlsx November 13, 2023
2323.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1027- SD Accordion Gate Details Review.doc.pdf CSA November 13, 2023
2324.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-034_With CP Comments.pdf November 13, 2023
2325.0 No. Transmittal; copy sent Through Email 20230914-Beca Reviewed-SGI-MW-SCIC-MT-188_Commented R & R.pdf November 13, 2023
2326.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-188-1.xlsx November 13, 2023

2327.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1028 - MT Axial Roof Fan WH-EF-01 to 28 (AXC-R 1250 - Systemair) 22,000 LPS.pdf MECHANICAL November 13, 2023

2328.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-051_1.xlsx November 13, 2023
2329.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1029 - SD for Schedule of Loads R1 Review.pdf ELECTRICAL November 13, 2023
2330.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051-0_Sht.1-7_ SD Schedule of Loads_Reviewed_23-11-06.pdf ELECTRICAL November 13, 2023
2331.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-032_0.xlsx November 13, 2023
2332.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1026- SD MAERSK Signage Detail Review.doc.pdf CSA November 13, 2023
2333.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-032_With CP Comments_09Nov23.pdf November 13, 2023
2334.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1031 - MS Cable Pulling for Public Address, Voice and Data .pdf ELECTRONICS November 13, 2023
2335.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-053-1_Approved.pdf November 13, 2023
2336.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1032- MS FDAS Rough Ins & Conduiting R1.pdf FIRE PRO November 13, 2023
2337.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-058-1_Approved.pdf November 13, 2023
2338.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-217_0.xlsx November 13, 2023
2339.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1033- MT Split Type Air Conditioning Unit (LG).pdf MECHANICAL November 13, 2023
2340.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-217-0_Commented AOC.pdf November 13, 2023
2341.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-131_1.xlsx November 13, 2023
2342.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1034- MT Chilled Water Fan Coil Unit (LG) R1.pdf MECHANICAL November 13, 2023
2343.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-131-1_Commented AOC.pdf November 13, 2023
2344.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1035- SD Drywall Connection Detail for Admn Bldg R1.pdf CSA November 13, 2023
2345.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-022_rev.1_Sheet 1 of 9.pdf November 13, 2023
2346.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-022_rev.1_Sheet 2 of 9.pdf November 13, 2023
2347.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-022_rev.1_Sheet 3 of 9.pdf November 13, 2023
2348.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-022_rev.1_Sheet 4 of 9.pdf November 13, 2023
2349.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-022_rev.1_Sheet 5 of 9.pdf November 13, 2023
2350.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-022_rev.1_Sheet 6 of 9.pdf November 13, 2023
2351.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-022_rev.1_Sheet 7 of 9.pdf November 13, 2023
2352.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-022_rev.1_Sheet 8 of 9.pdf November 13, 2023
2353.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-022_rev.1_Sheet 9 of 9.pdf November 13, 2023
2354.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-063_0 Sht1-5.xlsx November 13, 2023
2355.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1038- SD Conduit Route for STP, Fuel Pump and GH.pdf ELECTRICAL November 13, 2023

2356.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-063-0 Sht.1-5_Commented R & R.pdf November 13, 2023

2357.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-062 Sheet 1 of 3_0.xlsx November 13, 2023
2358.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1040- SD Ambient Warehouse Power Outlet.pdf ELECTRICAL November 13, 2023

2359.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-062-0 Sht.1-3_Commented to R & R.pdf November 13, 2023

2360.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1024 - SD Proposed Riser & WH Ceiling Level FP Layout .doc.pdf FIRE PRO November 13, 2023
2361.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-004-Sht. 1-8_Approved.pdf November 13, 2023
2362.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1023- MT Insulation Adhesive (K-FLEX) Review MECHANICAL November 13, 2023
2363.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1030- RFI No.44-FCU Return Air System.doc MECHANICAL November 13, 2023
2364.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1036- SD Pro. MO Roof Deck CWP Layout R1 PLUMBING November 13, 2023
2365.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1037- SD Outbound Dock Office AC Drain Layout MECHANICAL November 13, 2023
2366.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1042- Inbound Parapet Wall Height Reduction CSA November 13, 2023
2367.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1042- Outbound Parapet Wall Height Reduction CSA November 13, 2023
2368.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-083_Scope for CCTV System ELECTRONICS November 13, 2023
2369.0 No. Transmittal; copy sent Through Email Reference for BMS November 15, 2023
2370.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1053- MS & ITP Power Outlet Installation Review ELECTRICAL November 15, 2023
2371.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1054- ITP 44 Installation of Genset Review ELECTRICAL November 15, 2023
2372.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1055 - GSTS Complete Architectural Drawings ELECTRICAL November 15, 2023
2373.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1057 - Continual Submission of Shop Drawings ELECTRICAL November 15, 2023
2374.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1056- SD for WG01 Wheel Guide Pair R1 Review.pdf CSA November 15, 2023
2375.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-031-1_Commented Approved.pdf CSA November 15, 2023
2376.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-050 Sheet 1-41-0.xlsx CSA November 15, 2023
2377.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1058 - SD for High Canopy Fabrication Drawing review.pdf CSA November 15, 2023
2378.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1059 - Trench at the Main Entrance Gate-1 CSA November 16, 2023
2379.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1060 - Lighting layout for the Ambient WH.pdf ELECTRICAL November 16, 2023
2380.0 No. Transmittal; copy sent Through Email SLDC Whole Whse Racks Plan v20231108.dwg ELECTRICAL November 16, 2023

2381.0 No. Transmittal; copy sent Through Email SLDC Whole Whse Racks Plan v20231108-4 Sort Station.pdf ELECTRICAL November 16, 2023

2382.0 No. Transmittal; copy sent Through Email SLDC Whole Whse Racks Plan v20231108-Overall.pdf ELECTRICAL November 16, 2023

2383.0 No. Transmittal; copy sent Through Email SLDC Whole Whse Racks Plan v20231108-VAS Mezzanine.pdf ELECTRICAL November 16, 2023

2384.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1061 - Elevator Setdown Dimension MECHANICAL November 16, 2023
2385.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1062 - MT Cable Tray Ladder Type with Wire Mesh R2 ELECTRICAL November 16, 2023
2386.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-185-2_Approved November 16, 2023
2387.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1065 - Proposed Rainwater Silting Tank PLUMBING November 17, 2023
2388.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1066 - Repair of Damage Wall Sidings and Moulding.pdf CSA November 17, 2023
2389.0 No. Transmittal; copy sent Through Email IR ADMIN CLADDING.pdf November 17, 2023
2390.0 No. Transmittal; copy sent Through Email IR DOCK DOOR MOULDING.pdf November 17, 2023
2391.0 No. Transmittal; copy sent Through Email IR MAIN WHSE GL G.pdf November 17, 2023
2392.0 No. Transmittal; copy sent Through Email IR OUTBOUND CLADDING.pdf November 17, 2023
2393.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1064 - Rusted Rail Track lf SCIC Damage Roof Panels CSA November 17, 2023
2394.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1067- SD-DG01 Goal Post Protection Bollard R3 Review.pdf CSA November 17, 2023
2395.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-014-3_Approved.pdf November 17, 2023
2396.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-036_0.xlsx November 17, 2023
2397.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1068 SD for Motorcycle and Car Parking Entrance Gate.pdf CSA November 17, 2023
2398.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-036 with FF_CP_RE comments.pdf November 17, 2023
2399.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-029_0 Sht1-5.xlsx November 17, 2023
2400.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1069 - SD Steel Door Jamb Connection Details.pdf CSA November 17, 2023

2401.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-029_Sheet 1 of 5_With CP Comments.pdf November 17, 2023

2402.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-029_Sheet 2 of 5_With CP Comments.pdf November 17, 2023

2403.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-029_Sheet 3 of 5_With CP Comments.pdf November 17, 2023

2404.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-029_Sheet 4 of 5_With CP Comments.pdf November 17, 2023

2405.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-029_Sheet 5 of 5_With CP Comments.pdf November 17, 2023

2406.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1044- SD for Typ. Inst. Details Elec. Manhole Drain.pdf ELECTRICAL November 16, 2023
2407.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-061-Approved.pdf November 16, 2023
2408.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-063_0 Sht1-5.xlsx November 16, 2023
2409.0 No. Transmittal; copy sent Through Email NEMA - Requirements.pdf November 16, 2023
2410.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1045- SD Conduit Route for STP, Fuel Pump & GH R1.pdf PLUMBING November 16, 2023
2411.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-063-1 Sht.1-5_Commented R & R.pdf November 16, 2023
2412.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1045- SD Conduit Route for STP, Fuel Pump & GH R1.pdf PLUMBING November 16, 2023
2413.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-063-1 Sht.1-5_Approved.pdf November 16, 2023
2414.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1047- SD for External Works - GHA Electronics DataVoic.pdf ELECTRONICS November 16, 2023
2415.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-023-0_Approved.pdf November 16, 2023
2416.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1046- SD for MO Level 1 & 2 Lighting Layout R1.pdf ELECTRICAL November 16, 2023
2417.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-017-1_Approved.pdf November 16, 2023
2418.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1049- Testing & Commissioning & PQP.pdf MECHANICAL November 16, 2023
2419.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-056.xlsx November 16, 2023
2420.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1043- MS Concrete Coring Cutting& Res. after MEP Inst.pdf MECHANICAL November 16, 2023
2421.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-056-0_Commented AOC.pdf November 16, 2023
2422.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1048- SD Fire Protection Fire Hydrant Layout FIRE PRO November 16, 2023
2423.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1050- Reduced Size of Drywall Column Casing November 16, 2023
2424.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1051- MS Installation of Diesel Generator Set Review ELECTRICAL November 16, 2023
2425.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1052- MT PPR, HDPE and PVC Pipe (PHILDEX) Review PLUMBING November 16, 2023
2426.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1053- MS & ITP Power Outlet Installation Review ELECTRICAL November 16, 2023
2427.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-080_ SOG Straightedge Results and Recommendation to LF CSA November 16, 2023
2428.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1071 - MS FDAS Testing of Devices Review.pdf FIRE PRO November 18, 2023
2429.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-066-0_Approved.pdf November 18, 2023
2430.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1072 - MS Inst. of Devices for Fire Detection & Alarm Sys..pdf FIRE PRO November 18, 2023
2431.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-067-0_Approved.pdf November 18, 2023
2432.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-004_1.xlsx November 18, 2023
2433.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1073 - SD for Main Office Level 2 Electronics DataVoice R1.pdf ELECTRONICS November 18, 2023
2434.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-004_1-6_Commented AOC.pdf November 18, 2023
2435.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1074 - SD Inbound Office Level 2 Electronics DataVoice R1.pdf ELECTRONICS November 18, 2023
2436.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-006-1_Approved.pdf November 18, 2023
2437.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1077 - MS & ITP Mandrel Test for Duct Bank Cleaning Review ELECTRICAL November 20, 2023
2438.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1075 - Rev. Data & Voice Prov. Based on New Plans of GSTS.pdf CSA November 20, 2023
2439.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-009-1_Approved.pdf November 20, 2023
2440.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1076 - MS for Installation of Roof Ventilator Review.pdf MECHANICAL November 20, 2023
2441.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-065-0_Approved.pdf November 20, 2023
2442.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-FP-011-0.xlsx November 20, 2023
2443.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1078 - SD WH Cabinet Layout & Fire hose Cabinet.pdf FIRE PRO November 20, 2023
2444.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-011-0_Commented AOC.pdf November 20, 2023
2445.0 No. Transmittal; copy sent Through Email Shop Drawing Register LRS as of 18 November 2023 November 20, 2023

2446.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1079 -Non-Conformance Report (NCR) 022 November 20, 2023

2447.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-065_0.xlsx November 20, 2023
2448.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1076 - MS for Installation of Roof Ventilator Review.pdf MECHANICAL November 20, 2023
2449.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-065-0_Commented AOC.pdf November 20, 2023
2450.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1080 - SD GenSet Facility Room Oil Pit & Trench PL Layout .pdf PLUMBING November 21, 2023
2451.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-027-1_Approved.pdf.pdf November 21, 2023
2452.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-070-0.xlsx November 21, 2023
2453.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1082- MS Installation of Metal Soffit Sheeting.pdf CSA November 21, 2023
2454.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-070_With CP Comments.pdf November 21, 2023
2455.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1087 - SD for Guard House B , AC Drain Layout MECHANICAL November 22, 2023
2456.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-031_0-Sht.1-3.xlsx November 22, 2023
2457.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1084- SD Genset Meffler_Radiator & Day Tank Det..pdf ELECTRICAL November 22, 2023
2458.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-031-0_Commented AOC.pdf November 22, 2023
2459.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1085 - SD Proposed Utility ACMV Support Layout.pdf MECHANICAL November 22, 2023
2460.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-030-0_Approved.pdf November 22, 2023
2461.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-216_0.xlsx November 22, 2023
2462.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1086 - MT Plumbing Fixtures (VIVARI) Review.pdf PLUMBING November 22, 2023
2463.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1088 - SD for Typical Mounting Details Sheet 5.pdf CSA November 22, 2023 Superseded
2464.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-058_5_Approved.pdf November 22, 2023
2465.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1089 - SD ESD LVSGM-02 DT -4 & Genset to Sync Panel Cable .pdf ELECTRICAL November 22, 2023 Superseded
2466.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-064-0_Approved.pdf November 22, 2023
2467.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1090 - SD MO nd Level 2 Elec. DataVoice .pdf ELECTRICAL November 22, 2023
2468.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-004-2_Approved.pdf November 22, 2023
2469.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1091 - SD Ambient Warehouse Public Address System.pdf ELECTRICAL November 22, 2023
2470.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-010_1 - Approved.pdf November 22, 2023
2471.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-064 _0.xlsx November 22, 2023
2472.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1089 - SD ESD LVSGM-02 DT -4 & Genset to Sync Panel Cable .pdf ELECTRICAL November 22, 2023
2473.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-064-0_Commened R & R.pdf November 22, 2023
2474.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-058_0-Sheet 5.xlsx November 22, 2023
2475.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1088 - SD for Typical Mounting Details Sheet 5.pdf ELECTRICAL November 22, 2023
2476.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-058_5_Commented R & R.pdf November 22, 2023
2477.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1092 - SD Ambient Warehouse Power Outlet R1.pdf ELECTRICAL November 23, 2023
2478.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-062-1_Approved.pdf November 23, 2023
2479.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1094 - MT Glass Door, Window, Acc & Wall Partition (.pdf CSA November 23, 2023
2480.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-222-0_Commented AOC.pdf November 23, 2023
2481.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-215_0.xlsx November 28, 2023

2482.0 No. Transmittal; copy sent Through Email Div. 21 Section 21 05 29 (Hangers and Supports for Fire Protection Piping & November 28, 2023
Equ.pdf

2483.0 No. Transmittal; copy sent Through Email Div. 22 Section 22 05 29 (Hanger and Supports for Plumbing Piping & November 28, 2023
Equipment’s.pdf

2484.0 No. Transmittal; copy sent Through Email Div. 23 Section 23 05 29 (Hanger and Supports for HVAC Piping and November 28, 2023
Equipment’s).pdf

2485.0 No. Transmittal; copy sent Through Email Div. 26 Section 26 05 29 (Products).pdf November 28, 2023

2486.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1095 - Various MEPF Material Local Brand Review.pdf MECHANICAL November 28, 2023
2487.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1101- SD AW Fire Detection and Alarm System.pdf November 29, 2023
2488.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-025-0_Approved.pdf November 29, 2023
2489.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-191_0.xlsx November 29, 2023
2490.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-214_0.xlsx November 29, 2023
2491.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1096 - MT Steel Doors Acc.Louvers & Acoustic Board.pdf CSA November 29, 2023
2492.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-191-0_Commented AOC.pdf November 29, 2023
2493.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-214-0_Commented AOC.pdf November 29, 2023
2494.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-017 -1.xlsx November 29, 2023
2495.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1097 - SD Ambient Warehouse Public Address System R1.pdf ELECTRICAL November 29, 2023
2496.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-017 -1- Commented.pdf November 29, 2023
2497.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1098 - SD Conduit Route for Dock Leveler Supply& Cntrl. R1.pdf ELECTRICAL November 29, 2023
2498.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-042-1_Approved.pdf November 29, 2023
2499.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1099 - SD OB and IB Dock Leveller Control Layout R1.pdf ELECTRONICS November 29, 2023
2500.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-060-1_Approved.pdf November 29, 2023
2501.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1100- SD Conduit Route for Dock Leveler Supply& Cntrl R1.pdf ELECTRONICS November 29, 2023
2502.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-046-1_Approved.pdf November 29, 2023
2503.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1102- SD Fire Det.& Alarm Sys.,Ceiling Beam.pdf November 29, 2023
2504.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-024-0_Approved.pdf FIRE PRO November 29, 2023
2505.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1103- Various EL ITP Reviews.pdf ELECTRONICS November 29, 2023
2506.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-047-0_Approved.pdf November 29, 2023
2507.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-048-0_Approved.pdf November 29, 2023
2508.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-049-0_Approved.pdf November 29, 2023
2509.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1104- Various Electronics Method Statement Review.pdf ELECTRONICS November 29, 2023
2510.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-071-0_Approved.pdf November 29, 2023
2511.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-072-0_Approved.pdf November 29, 2023
2512.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-073-0_Approved.pdf November 29, 2023
2513.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1105-ITP 33 Cable Pulling for FDAS Review.pdf ELECTRONICS November 29, 2023
2514.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-033-0_Approved.pdf November 29, 2023
2515.0 No. Transmittal; copy sent Through USB 1. 2010 - Project Optimus (Gym - Architectural) CSA November 29, 2023
2516.0 No. Transmittal; copy sent Through USB 1. 2010 - Project Optimus (GH - Architectural) CSA November 29, 2023
2517.0 No. Transmittal; copy sent Through USB 1. 2010 - Project Optimus (Inbound - Architectural) CSA November 29, 2023
2518.0 No. Transmittal; copy sent Through USB 1. 2010 - Project Optimus (Outbound - Architectural) CSA November 29, 2023
2519.0 No. Transmittal; copy sent Through USB 1. 2010 Project Optimus - Main Office (Architectural) CSA November 29, 2023
2520.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1107 - MT for Homogenous Tiles (CODE BSR06302Z).pdf CSA November 30, 2023
2521.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-227-0_Approved.pdf November 30, 2023
2522.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1106 - MS Crack Repair Injection at Slab on Grade.pdf CSA November 30, 2023
2523.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-040-1_Approved.pdf November 30, 2023
2524.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-051_2.xlsx November 30, 2023
2525.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1108 - SD for Schedule of Loads R2 Review.pdf ELECTRICAL November 30, 2023
2526.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051_Combined_23-11-29_AS.pdf November 30, 2023
2527.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1109- MT for Superlon Rubber Insulation MECHANICAL December 01, 2023
2528.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1110 - MT for Trap Primer Valve (ZURN) MECHANICAL December 01, 2023
2529.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1112 - SD Admin Office OS & Y Fire Protection Layout R1.pdf FIRE PRO December 05, 2023
2530.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-008-1_Approved.pdf December 05, 2023
2531.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1113 - SD for IB Dock Office Level1-3Lighting.pdf ELECTRICAL December 05, 2023
2532.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-066-0_Approved.pdf December 05, 2023
2533.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1114 - PA Speaker Numbers ~ Supplier Sound Level ELECTRONICS December 05, 2023
2534.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1117 - SD Guard House A & B Additional Sewage Manhole December 06, 2023
2535.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-226_0.xlsx December 06, 2023
2536.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1118 - MT Lighting Fixtures (CLARO) Review.pdf ELECTRICAL December 06, 2023
2537.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-226-0_Commented R & R.pdf December 06, 2023
2538.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-226_0.xlsx December 06, 2023
2539.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1118 - MT Lighting Fixtures (CLARO) Review.pdf ELECTRICAL December 06, 2023
2540.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-226-0_Commented R & R.pdf December 06, 2023
2541.0 No. Transmittal; copy sent Through Email HVLS FAN MOTOR LAY-OUT IN VAS MEZZANINE_8-UNITS.pdf December 06, 2023
2542.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1116 - Big Ass Fan Final Layout .pdf MECHANICAL December 06, 2023
2543.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-038-0.xlsx December 06, 2023
2544.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1119 - SD Ceiling Det. Battery Storage Area&Ut.pdf CSA December 06, 2023
2545.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-038 Sheet 1 of 3_With CP Comments.pdf December 06, 2023
2546.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-038 Sheet 2 of 3_With CP Comments.pdf December 06, 2023
2547.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-038 Sheet 3 of 3_With CP Comments.pdf December 06, 2023
2548.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-028_1.xlsx December 06, 2023
2549.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1115 - BA14 Pre Painted Guardrails R1Review.pdf CSA December 06, 2023
2550.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-028_rev.1 Sheet 1 OF 3.pdf December 06, 2023
2551.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-028_rev.1 Sheet 2 OF 3.pdf December 06, 2023
2552.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-028_rev.1 Sheet 3 OF 3.pdf December 06, 2023
2553.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1121 MS Inst. of Fan Coil Unit&Air Handling Unit.doc MECHANICAL December 07, 2023
2554.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1122 - MS Inst. KOKA Strut Support System Review.doc CSA December 07, 2023
2555.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1123 - MT Gal Iron Sheet for HVAC Ducting.doc MECHANICAL December 07, 2023
2556.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-008_2.xlsx December 07, 2023
2557.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1124- SD Site Development Outdoor Lighting Layout R2.pdf CSA December 07, 2023
2558.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-008-2_Commenred AOC.pdf December 07, 2023
2559.0 No. Transmittal; copy sent Through Email APPENDIX.pdf December 07, 2023
2560.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-223_0.xlsx December 08, 2023
2561.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1126 - MT Portable Fire Exting.&Fire Hose.doc.pdf FIRE PRO December 08, 2023
2562.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-037-0.xlsx December 08, 2023
2563.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1127 - SD SS Railings for Inbound and Outbound.pdf CSA December 08, 2023
2564.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-037 Sheet 1 of 2.pdf December 08, 2023
2565.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-037 Sheet 2 of 2.pdf December 08, 2023
2566.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1128 - SD Ceiling at Warehouse Area for FDAS Support.pdf FIRE PRO December 08, 2023
2567.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-027-0_Approved.pdf December 08, 2023
2568.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-039.xlsx December 08, 2023
2569.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1129- SD Proposed Typical Detail of Drywall Partition.pdf CSA December 08, 2023
2570.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1130 - ITP-052 for Air Cooled Chiller.doc MECHANICAL December 11, 2023
2571.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1132 - SD for Schedule of Loads R3 Review.pdf ELECTRICAL December 12, 2023
2572.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051_Combined_23-12-11_AS.pdf December 12, 2023
2573.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1133- Required MS for Inst. Equipments ELECTRICAL December 12, 2023
2574.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1136 - Required Project Schedule & Recovery Plan ELECTRICAL December 14, 2023
2575.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1134 - Procurement of additional transformer ELECTRICAL December 14, 2023
2576.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1135 - Non-Conformance Report (NCR) 023.pdf December 14, 2023

2577.0 No. Transmittal; copy sent Through Email Test Result-Flexural Strength of Beam Concrete Specimen.jpg December 14, 2023

2578.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1137- Non-Conformance Report (NCR- 024) December 14, 2023
2579.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1138- Non-Conformance Report (NCR- 025) December 14, 2023
2580.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1139- Procurement of LVSGM-01 and LVSGM-02.pdf ELECTRICAL December 14, 2023
2581.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051_rev. 2 Sheet 1 of 7.pdf December 14, 2023
2582.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051_rev. 2 Sheet 5 of 7.pdf December 14, 2023
2583.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1141 - SD for Stair 57 Details at Inbound Office R2.pdf CSA December 15, 2023
2584.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-049_ rev.2 Sheet 1 of 2_b (recommendation).pdf December 15, 2023
2585.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-036_2.xlsx December 15, 2023
2586.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1142 -SD - Stair 51 Details at Main Lobby.pdf CSA December 15, 2023
2587.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-036-2_Commented.pdf December 15, 2023
2588.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1143 - Procurement of the ELVSGM Panels ELECTRICAL December 15, 2023
2589.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1144 - IB & OB Dock Office Add. Catch Basin&Sec.Det.doc PLUMBING December 15, 2023
2590.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1156 - Non-Conformance Report (NCR- 026).pdf December 18, 2023
2591.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-030_0.xlsx December 19, 2023
2592.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1159- SD for Metal Doors Review.pdf CSA December 19, 2023
2593.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_ Sheet 1 of 23_With CP Comments.pdf December 19, 2023
2594.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_ Sheet 2 of 23_With CP Comments.pdf December 19, 2023
2595.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_ Sheet 3 of 23_With CP Comments.pdf December 19, 2023
2596.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_ Sheet 4 of 23_With CP Comments.pdf December 19, 2023
2597.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_ Sheet 5 of 23_With CP Comments.pdf December 19, 2023
2598.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1131- Handover of admin bldg chamfered wall lower moulding CSA December 19, 2023
2599.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1165 - SD Main Office Roofdeck Storm Drain System Layout R1 PLUMBING December 21, 2023
2600.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1166- SD Prop. Battery Recharge Room Fire Pro FIRE PRO December 21, 2023
2601.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1167- MS Installation of Air-Cooled Chiller MECHANICAL December 21, 2023
2602.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1168 -SGI-CON-MW-SCIC-CI-1168 - SD for Power Outlet Typical Inst. Det ELECTRICAL December 21, 2023
2603.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1169- SD for Above Ceiling Power Outlet Review ELECTRICAL December 21, 2023
2604.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1173- Project Management Construction Manager January 03, 2024
2605.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1169- SD for Above Ceiling Power Outlet Review ELECTRICAL January 03, 2024
2606.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1175- SD for Site Dev. Outdoor Lighting Layout R3 ELECTRICAL January 04, 2024
2607.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1174 - Re to Ltr. 211_Delay in Proc. LVSGM 1 & LVSG 2.doc ELECTRICAL January 04, 2024
2608.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1176- Vasbuilt Type Fence Along Sagara Wall.doc CSA January 04, 2024
2609.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1177- CEILING PANELS BATCH 6 ( URGENT ).doc CSA January 04, 2024
2610.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1178- ATS (ELVSG Fire Pump) Evaluation Report ELECTRICAL January 05, 2024
2611.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1179- FAT Requirements - Manufacturers ELECTRICAL January 05, 2024
2612.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1180- Delay of Fire Pump Delivery .pdf FIRE PRO January 05, 2024
2613.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-071 -0.xlsx January 08, 2024
2614.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1182- SD Utiliy Bldg. Lighting Typ. Insta.pdf ELECTRICAL January 08, 2024
2615.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-071-0_Commented.pdf January 08, 2024
2616.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1183 - SD for Roof Deck MECH Sys. Penetration Layout MECHANICAL January 08, 2024
2617.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1184 - SD for Stair Pressurization System Layout CSA January 08, 2024
2618.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1185 - SD Proposed Exhaust Air Grille Mounting Layout MECHANICAL January 08, 2024
2619.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-082-0.xlsx January 08, 2024
2620.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1186 - MS for Public Address Termination of Devices.pdf ELECTRONICS January 08, 2024
2621.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-083-0.xlsx January 08, 2024
2622.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1187 - MS for Tel Data Termination of Devices.pdf ELECTRONICS January 08, 2024
2623.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-077-0.xlsx January 08, 2024
2624.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1188 - MS Installation of Fuel Lines Review.pdf ELECTRICAL January 08, 2024
2625.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-081-0.xlsx January 08, 2024
2626.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1189 - MS Installation of Exhaust Pipe and Mufflers.pdf ELECTRICAL January 08, 2024
2627.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-080-0.xlsx January 08, 2024
2628.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1190 - MS Pneumatic Leak Test of Fuel Line.pdf PLUMBING January 08, 2024
2629.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-070-0.xlsx January 08, 2024
2630.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1191 - SD Exit Lighting ER Light & App Typ. Mounting Insta..pdf ELECTRICAL January 08, 2024
2631.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-235 _0.xlsx January 09, 2024
2632.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1193 - MT Low Voltage Transformer.pdf ELECTRICAL January 09, 2024
2633.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-235[BECA Reviewed].pdf January 09, 2024
2634.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-075 _0.xlsx January 09, 2024
2635.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1194 - SD Admin Bld. Elec. Routing Plan & Elev Detail.pdf ELECTRICAL January 09, 2024
2636.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-075-0_Comment AOC & A.pdf January 09, 2024
2637.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1195 - SD Utility Facilities Power Layout &Power Outl ELECTRICAL January 09, 2024
2638.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1196- SD for Enclosed Circuit Breaker ELECTRICAL January 09, 2024
2639.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1197- MT Lighting Fixtures (CLARO) R1 Review ELECTRICAL January 09, 2024
2640.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-PL-041.xlsx January 09, 2024
2641.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1198- SD for Rain Water Collector.pdf PLUMBING January 09, 2024
2642.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-041-0_ Commented R&R.pdf January 09, 2024
2643.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-078-0.xlsx January 09, 2024
2644.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1199- MS Installation of Radiator Ducting.pdf MECHANICAL January 09, 2024
2645.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1200- SD Main Office Level 2 Plumbing Layout PLUMBING January 09, 2024
2646.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1201- SD Exhaust Fan Power Layout and Details ELECTRICAL January 09, 2024

2647.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1202- SD Panel Boards (ELVSGM-01, ELVSGM-02, LVSGM-01 and LVSGM-02) R1 ELECTRICAL January 10, 2024

2648.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-079-0.xlsx January 10, 2024
2649.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1203- MS Pneumatic Leak Test of Fuel Day Tank.pdf ELECTRICAL January 10, 2024
2650.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1205- Status of Permanent Waterline & Electricity January 10, 2024
2651.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1206- Reduced Parking Area,Flagpoles & Bioswale Loc CSA January 10, 2024
2652.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-042-0.xlsx January 11, 2024
2653.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1210- SD Typical Detail of Framing Support.pdf CSA January 11, 2024
2654.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-030_0-No.2.pdf January 11, 2024
2655.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1211- SD for Metal Doors Sht 6-11 Review.pdf CSA January 11, 2024
2656.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_Sheet 6 of 23_With CP Comments.pdf January 11, 2024
2657.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_Sheet 7 of 23_With CP Comments.pdf January 11, 2024
2658.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_Sheet 8 of 23_With CP Comments.pdf January 11, 2024
2659.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_Sheet 9 of 23_With CP Comments.pdf January 11, 2024
2660.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_Sheet 10 of 23_With CP Comments.pdf January 11, 2024
2661.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-030_Sheet 11 of 23_With CP Comments.pdf January 11, 2024
2662.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1212- SD for Motorcycle & Car Parking Entrance Gate CSA January 11, 2024
2663.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-040_0.xlsx January 11, 2024
2664.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1213- SD for of Floor Tile Layout for Inbound Toilet.pdf CSA January 11, 2024
2665.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1214- SD Adm. Bld. Elec. Routing Plan & Elev Det. R1 ELECTRICAL January 15, 2024
2666.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-022_0.xlsx January 15, 2024
2667.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1215-AW CCTV System - CCTV Camera Layout Overall.pdf ELECTRONICS January 15, 2024
2668.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-014_1.xlsx January 16, 2024
2669.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1216- SD Revised Inbound Dock Level 1 ACMV Layout.pdf MECHANICAL January 16, 2024
2670.0 No. Transmittal; copy sent Through Email Project Optimus - Main Office RCP 011024_PTDC.dwg January 16, 2024
2671.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1217- Final Main Office RCP.doc.pdf CSA January 16, 2024
2672.0 No. Transmittal; copy sent Through Email SGI-PTDC-AA-3341.pdf January 16, 2024
2673.0 No. Transmittal; copy sent Through Email SGI-PTDC-AA-3342.pdf January 16, 2024
2674.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-PL-041_1.xlsx January 16, 2024
2675.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1218- SD for Rain Water Collector R1 Review.pdf PLUMBING January 16, 2024
2676.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-PL-041_rev.1.pdf January 16, 2024
2677.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1219- ELECTRICAL AS-BUILT PLANS ELECTRICAL January 16, 2024
2678.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-052.xlsx January 17, 2024
2679.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1220- SD for Irrigation & Portable Pump House.pdf PLUMBING January 17, 2024
2680.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-052 wth FF comments.pdf January 17, 2024
2681.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-002_3.xlsx January 17, 2024
2682.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1204- SD Typ.Mounting Det. Lighting Pro. Sys.pdf ELECTRICAL January 17, 2024
2683.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-002-2_Commented AOC.pdf January 17, 2024
2684.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-032_2.xlsx January 17, 2024
2685.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1221- SD MAERSK Signage Detail R2 Review.doc.pdf CSA January 17, 2024
2686.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCSIC-SD-CV-028.xlsx January 17, 2024
2687.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1222- SD Site Fence Stationing of FN06 at East Side.pdf CSA January 17, 2024
2688.0 No. Transmittal; copy sent Through Email SGI-MW-SCSIC-SD-CV-028_with FF comments.pdf January 18, 2024
2689.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-043-0.xlsx January 18, 2024
2690.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1223- SD for Louver Windows Sht.1-11.doc.pdf MECHANICAL January 18, 2024
2691.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-1193- SD for Louver Windows Sht.1-11.zip January 18, 2024
2692.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-045_0..xlsx January 18, 2024
2693.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1224- SD Treatment Plant (STP) with Buried Reinf.doc.pdf PLUMBING January 18, 2024
2694.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-045 Sheet 1 of 2 with CP Comments.pdf January 18, 2024
2695.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-045 Sheet 2 of 2 with CP Comments.pdf January 18, 2024
2696.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1225- Lighting layout for the Ambient Warehouse.pdf ELECTRICAL January 19, 2024
2697.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-LTR-225.pdf January 19, 2024
2698.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1227 - SD-Stair 51 Details at Main Lobby R3.pdf CSA January 22, 2024
2699.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-036-3_Approved.pdf January 22, 2024
2700.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1229- SD Typ. Mounting Det. of Disconnect Sw ELECTRICAL January 23, 2024
2701.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1228- SD for Panel PP2 UME R1 Sheet 5 ELECTRICAL January 23, 2024
2702.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1230- SD Prop. Battery Recharge Room Fire Pro ELECTRICAL January 23, 2024
2703.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1231- SD for Permanent Water Line Layout PLUMBING January 23, 2024
2704.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1232- MS Installation of Radiator Ducting R1 MECHANICAL January 23, 2024
2705.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1234- MT 8mm Deformed Rebars (Halcon).pdf CSA January 25, 2024
2706.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-236-0_Approved.pdf January 25, 2024
2707.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1236- SD for Inbound Dock Office Power Layout ELECTRICAL January 26, 2024
2708.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1235- SD for Main Office Level 1 Power Layout R3 ELECTRICAL January 26, 2024
2709.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1237- SD BA14 Pre Painted Guardrails R2.doc.pdf CSA January 26, 2024
2710.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-028_rev.2 Sheet 1 OF 3.pdf January 26, 2024
2711.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-028_rev.2 Sheet 2 OF 3.pdf January 26, 2024
2712.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-028_rev.2 Sheet 3 OF 3.pdf January 26, 2024
2713.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1239 - MT Transformer (500 KVA Dry Type) ELECTRICAL January 29, 2024
2714.0 No. Transmittal; copy sent Through Email IR for waste toner.jpg January 30, 2024
2715.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1240 - Non-Conformance Report (NCR- 027).pdf January 30, 2024
2716.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1244- ITP for Electrical Communication Piping Review ELECTRICAL January 30, 2024
2717.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1245- SD MO IB OB Fire Detection and Alarm System FIRE PRO January 30, 2024
2718.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1246- SD Hand Hole 1, 2 & 3 Typical Details and Typical Ins MECHANICAL January 30, 2024
2719.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1247- Revised Inbound Dock Level 2 ACMV Layout MECHANICAL January 30, 2024
2720.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1248- SD for Revised Inbound Dock Office Level 3 MECHANICAL January 30, 2024
2721.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1249- SD Prop IB Dock Off. Roof Deck Level Pad Equi. Layout MECHANICAL January 30, 2024
2722.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1250- SD Flood Light Loading Dock Area &Typ. Inst. Det ELECTRICAL January 30, 2024
2723.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1251- Louver Deletion at Roofdeck MECHANICAL January 31, 2024
2724.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-454 - Additional Wall Cladding at Dock Area.pdf CSA January 31, 2024
2725.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1252- Supplemental Inst,. Add wall Claddingat DA.pdf CSA January 31, 2024
2726.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1253- Catch Basin at MRF & Utility Bldg. PLUMBING February 01, 2024
2727.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-238_0.xlsx February 01, 2024 superseded
2728.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1254- MT Aeroduct (Flexible Duct with 2” Insulation).pdf MECHANICAL February 01, 2024 superseded
2729.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-238_0.xlsx February 01, 2024
2730.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1254- MT Aeroduct (Flexible Duct with 2” Insulation).pdf MECHANICAL February 01, 2024
2731.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-239_0.xlsx February 01, 2024
2732.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1255 - MT Aeroseal (Adhesive for Insulation).pdf MECHANICAL February 01, 2024
2733.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-240_0.xlsx February 01, 2024
2734.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1256 - MT Grooved Fittings LUYUAN.pdf MECHANICAL February 01, 2024
2735.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1257 - MS Inta, Exhaust Pipe&Mufflers MECHANICAL February 01, 2024
2736.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1258- SD Prop Battery Re Charge Room ACMW MECHANICAL February 01, 2024
2737.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1259- Const. of FN-05 Wall type on the unfenced area G1 CSA February 01, 2024
2738.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1260- Scope Removal of IT System and VE on PA Comm Sys ELECTRONICS February 01, 2024
2739.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1262- SD Prop.Loading Area Ceiling Level Fire Pro.pdf February 02, 2024
2740.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-FP-013-1_Approved.zip February 02, 2024
2741.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-047_0.xlsx February 02, 2024
2742.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1263- SD MAERSK Signage at Fence, West Side& East Side.pdf CSA February 02, 2024
2743.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-047 Sheet 1 of4.pdf February 02, 2024
2744.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-047 Sheet 2 of4.pdf February 02, 2024
2745.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-047 Sheet 4 of4.pdf February 02, 2024
2746.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1264-SGI-MW-SCIC-SCH-007 Impacted Schedule Rev.3 Cancelled February 02, 2024
2747.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-081_0.xlsx February 05, 2024
2748.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1265- SD Pull Box and Wire Gutter.pdf ELECTRICAL February 05, 2024
2749.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-081-0_1-7_Commented AOC.pdf February 05, 2024
2750.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1266- SD Typical Toilet Detail Water Proofing.pdf PLUMBING February 05, 2024
2751.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-053-0_Commented R & R.pdf February 05, 2024
2752.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1267- SD for Vas Mezzanine Fire Pro Layout Review FIRE PRO February 05, 2024
2753.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-FP-016-0.xlsx February 06, 2024
2754.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1269- SD AW Ceiling Level Fire Pro. Layout - Overall.pdf FIRE PRO February 06, 2024
2755.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1270- SD Prop. Warehouse Fire Protection Layout FIRE PRO February 07, 2024
2756.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1271- MT B.I. Pipes (SUPREME) Review FIRE PRO February 07, 2024
2757.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1272- SD for Auxilliary Duct Bank Pipe Route Details ELECTRICAL February 07, 2024
2758.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-076 .xlsx February 07, 2024
2759.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1273- SD Typ.Insta Det.ShutterDBC, DSP &PS.pdf February 07, 2024
2760.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1274- SD for Prop Supervisory Switch Piping Layout February 07, 2024
2761.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1275- SD Vas Mezzanine Fire Detection and Alarm Sys FIRE PRO February 07, 2024
2762.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1276- SD Proposed Fire Protection ITC Layout FIRE PRO February 07, 2024
2763.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1277- ITP for Public Address Review ELECTRONICS February 07, 2024
2764.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1278- SD Proposed Fire Pump System,Blockout & Mounting FIRE PRO February 07, 2024
2765.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-005_ Sht.5_2.xlsx February 07, 2024
2766.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1279- SD Facility Fuel Oil Piping Layout .pdf ELECTRICAL February 07, 2024
2767.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1280- SD for Dock Office Feeder Route Sec. & Details ELECTRICAL February 07, 2024
2768.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-242-0.xlsx February 07, 2024
2769.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1281- MT Brass Valve & Strainer Review.pdf PLUMBING February 07, 2024
2770.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1282- SD Comp. Layout Power & Control Wiring ELECTRICAL February 07, 2024
2771.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1283- MT Full Threaded Down Rod ELECTRICAL February 07, 2024
2772.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1284- MT Rockwool Blanket Review CSA February 07, 2024
2773.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-244_0.xlsx February 07, 2024
2774.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1285- MT Boysen Quick Drying Enamel (Chocolate Brown).pdf CSA February 07, 2024
2775.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-244-0_Commented R & R.pdf February 07, 2024
2776.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-243.xlsx February 07, 2024
2777.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1286- MT for Glazer Galva Plus Epoxy Primer & Catalyst.pdf CSA February 07, 2024
2778.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-243-0_Commented AOC.pdf February 07, 2024
2779.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1288- MT Interior&Exterior Painting Works &Jotamastic.pdf CSA February 07, 2024
2780.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-157-0_Approved.pdf February 07, 2024
2781.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-230-0_Approved.pdf February 07, 2024
2782.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1287- MT MT Base Coarse (PATAVIUM) R1 Review.pdf CSA February 07, 2024
2783.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-213-1_Approved.pdf February 07, 2024
2784.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1289- Interior and Exterior Painting Works - Top Coat.pdf CSA February 07, 2024
2785.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-148-1_Approved.pdf February 07, 2024
2786.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-079-0.xlsx February 07, 2024
2787.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1290- SD IB Office Feeder Line Route&Wire Gutter.pdf ELECTRICAL February 07, 2024
2788.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1291- Pavement Adjustment at Car Parking Area CSA February 07, 2024
2789.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1292- MW Contrator - Renewal of Bond Renewal of Bond February 08, 2024
2790.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1239 - MT Transformer (500 KVA Dry Type).pdf ELECTRICAL February 08, 2024
2791.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1293- Warranty Commencement -Transformer 500KVA.pdf ELECTRICAL February 08, 2024
2792.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-237[BECA Reviewed].pdf February 08, 2024
2793.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1294- SD Prop.Admin LVSG Room ACMV Riser Layout MECHANICAL February 12, 2024
2794.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1295- SD Proposed Genset Room ACMV Riser Layout MECHANICAL February 12, 2024
2795.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1296- SD Prop.Switchgear&Trans. Vault Room ACMV (1) MECHANICAL February 12, 2024
2796.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1297- SD Prop Genset Room Exhaust Fan Wall Mounted ELECTRICAL February 12, 2024
2797.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-080_1_0.xlsx February 12, 2024
2798.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1298- SD Typical Insta. Det. for Panel Bracke.pdf ELECTRICAL February 12, 2024
2799.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1299- MT Gal Iron GA #18 for Radiator Ducting MECHANICAL February 12, 2024
2800.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1300- MT for Angle Bar (Regan).pdf CSA February 12, 2024
2801.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-245-0_Approved.pdf February 12, 2024
2802.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1301- MT SW Beam Clamp (20mm & 32mm) ELECTRICAL February 12, 2024
2803.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1302- SD for Panel PP1 - AWH R1 Review ELECTRICAL February 13, 2024
2804.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1303-RetainScope_- Vasbuilt Type Fence Along Sagara.doc CSA February 13, 2024
2805.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1304- Substitute Fastening Material (Teckscrew).doc CSA February 13, 2024

2806.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1305- Additional Load Requirement for Temporary Power ( GSTS ).doc ELECTRICAL February 13, 2024

2807.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-014_37-40a Sheets_1.xlsx February 13, 2024
2808.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1306- SD for Panel Emergency Low Voltage Switchgear Review.pdf ELECTRICAL February 13, 2024
2809.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1307- MT Rockwool Insulator (IMC)& Ficem Board .pdf CSA February 13, 2024
2810.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-126-1_Approved.pdf CSA February 13, 2024
2811.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-186-0_Approved.pdf CSA February 13, 2024
2812.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1308- Vas Mez Flooring Cutting along Stair 33 CSA February 15, 2024
2813.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1309- SD for Revised Main Office Level 2 ACMV Layout.pdf MECHANICAL February 15, 2024
2814.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-045-0_Approved.pdf MECHANICAL February 15, 2024
2815.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1310- Additional Power Outlet for IDF-AWH.pdf ELECTRONICS February 17, 2024
2816.0 No. Transmittal; copy sent Through Email WAREHOUSE (IDF LOCATION) SIGNED.pdf ELECTRONICS February 17, 2024
2817.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1311- SD Equip. Elec. Supply Admin Roof Deck, Pipe Sup ELECTRICAL February 19, 2024
2818.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1312- SD Main Office Level 1 & 2 Overall Plan, Device Layout ELECTRONICS February 19, 2024

2819.0 No. Transmittal; copy sent Through Email Project Optimus - Outbound Dock Office RCP 010524_SGI-PTDC-AA-3351.dwg CSA February 20, 2024

2820.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1313- Outbound RCP drawings.doc.pdf CSA February 20, 2024
2821.0 No. Transmittal; copy sent Through Email SGI-PTDC-AA-3351.pdf CSA February 20, 2024
2822.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1314- AW Doors for Rectification.doc CSA February 20, 2024 superseded due to it being resolved already
2823.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1315- SD Outdoor Lighting Post Foundation Detail R1 ELECTRICAL February 20, 2024
2824.0 No. Transmittal; copy sent Through Email SCIC-SD-EL-001_ Proposed Additional Conduits for Telco_R1.pdf ELECTRICAL February 20, 2024
2825.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-861- Addtional 4 Conduit Ductbank for Telco.pdf ELECTRICAL February 20, 2024
2826.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1316- Ammendment-Add.l 4 Conduit Ductbank Materials.doc.pdf ELECTRICAL February 20, 2024
2827.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-052-1.pdf February 21, 2024
2828.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-052-1.xlsx February 21, 2024
2829.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1317- SD for Irrigation and Portable PH R1.doc.pdf PLUMBING February 21, 2024
2830.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-052_rev.1_with CP Comments.pdf February 21, 2024
2831.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1318- Response to Renewal of Bond.doc February 23, 2024
2832.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1319- Change Material For Sleeve PLUMBING February 23, 2024
2833.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1320- RE to Letter # 268-Add. Power Outlets for IDF-A ELECTRICAL February 23, 2024
2834.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1321- SD Typ. Mounting Det.Dis. Switch & Dock Lvr ELECTRICAL February 26, 2024
2835.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1322- SD Typ.Insta Det.ShutterDBC, DSP &PS R1 ELECTRICAL February 26, 2024
2836.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1323- SD for Proposed Main Office Level 1 ACMV Layout MECHANICAL February 26, 2024
2837.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1325- SD MO Level 1 and 2 Public Address Sys. Over ELECTRONICS February 26, 2024
2838.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1326- SD 17-Units of Disc Switch 40A, 3P+G Typ ELECTRICAL February 26, 2024
2839.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1327- Outbound Submetering Requirement ELECTRICAL February 27, 2024
2840.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-054-0.xlsx PLUMBING February 27, 2024
2841.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1324- SD Proposed New Manhole Near Ramp 05.pdf PLUMBING February 27, 2024
2842.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-054-0_Commented R&R.pdf PLUMBING February 27, 2024
2843.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-MT-253-0.xlsx ELECTRICAL February 28, 2024
2844.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1329- MT for Wall Fan (Genset Room OA-GEF-1) Review.pdf ELECTRICAL February 28, 2024
2845.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1328- SD of Panel LP2-MO ELECTRICAL February 29, 2024
2846.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1330- SD VAS Mez. Cable Tray Layout, Main Feeder&Branch Supply ELECTRICAL February 29, 2024
2847.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-254.xlsx February 29, 2024
2848.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1331- MT Class 1 Division 1 Materials for Battery Room.pdf ELECTRICAL February 29, 2024
2849.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1332- Sectional Door at Gridline G42 CSA March 01, 2024
2850.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1132 - SD for Schedule of Loads R3 Review.pdf ELECTRICAL March 04, 2024
2851.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1333 - SD Schedule of Loads R3 required resubmission.pdf ELECTRICAL March 04, 2024
2852.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051_Combined_23-12-11_AS.pdf ELECTRICAL March 04, 2024
2853.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1335- Provide 3 nos of Hosebibs.doc PLUMBING March 04, 2024
2854.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1334- MW Contractor House Keeping March 04, 2024
2855.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-032.pdf March 04, 2024
2856.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1336- Inbound Office Level 1, 2 & 3 - Electronics Re.pdf ELECTRONICS March 04, 2024
2857.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-032-0_Approved.pdf March 04, 2024
2858.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ME-005_3.xlsx March 04, 2024
2859.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1337- SD Facility Fuel Oil Piping Layout R3 Review.pdf PLUMBING March 04, 2024
2860.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-005-3_Commented R & R.pdf March 04, 2024
2861.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-PL-043.xlsx March 05, 2024
2862.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-PL-043.pdf March 05, 2024
2863.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1338 - SD for SMH Guard House B.pdf PLUMBING March 05, 2024
2864.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1339- SD MO Bldg.Male & Female Toilet Water Line Layo PLUMBING March 05, 2024 superseded
2865.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1340- SD for Rain Water and Filtration System PLUMBING March 05, 2024
2866.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1341- Proposed IB OB & MO Fire Hose Cabinet Layout&Mounti ELECTRONICS March 05, 2024
2867.0 No. Transmittal; copy sent Through Email EA-1C PROPOSED MANHOLE GRID D,33.pdf March 06, 2024
2868.0 No. Transmittal; copy sent Through Email EA-1D PROPOSED MANHOLE GRID D,21.pdf March 06, 2024
2869.0 No. Transmittal; copy sent Through Email EA-1E PROPOSED MANHOLE GRID D,11.pdf March 06, 2024
2870.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1342- RNT Request Manholes Location.pdf ELECTRONICS March 06, 2024
2871.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1343- Add Instruction Fire-Rated Wall.pdf CSA March 06, 2024
2872.0 No. Transmittal; copy sent Through Email STAIR 31 TURNSTILE PROPOSED LAYOUTS.dwg March 13, 2024
2873.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1344- Utilization of Rainwater Harvester Tank March 13, 2024
2874.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-244_1.pdf March 13, 2024
2875.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1348- MT for Boysen Quick Drying Enamel (Chocolate Brown).pdf CSA March 13, 2024
2876.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-244-1_Approved.pdf March 13, 2024
2877.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1351- MT Fastening of Exhaust Pipe for Gen..doc ELECTRICAL March 13, 2024
2878.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1352- MT for Boysen Quick Drying Enamel (Chocolate Brown) CSA March 13, 2024
2879.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-250_0.xlsx March 13, 2024
2880.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1353- Alum. GA #22 for Exhaust Cladding.doc.pdf MECHANICAL March 13, 2024
2881.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-251_0.pdf March 13, 2024
2882.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1354- MT Guilder Epoxy Primer “Gray”.pdf CSA March 13, 2024
2883.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-251-0_Approved.pdf March 13, 2024
2884.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1355- SD for Proposed Preaction System Layout.doc ELECTRONICS March 13, 2024
2885.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1356- Prop. OB Dock Office Roof Deck Level Pad Eq.doc CSA March 13, 2024
2886.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1357- SD Prop Loc.Thermostat at IB Dock Office.doc.pdf MECHANICAL March 13, 2024
2887.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-044-0_Approved.pdf March 13, 2024
2888.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-052-2.xlsx March 13, 2024
2889.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1358- SD for Irrigation and Portable PH R2.doc.pdf PLUMBING March 13, 2024
2890.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-052-2_Commented AOC.pdf March 13, 2024
2891.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-033_0.pdf March 13, 2024
2892.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1359-SD- MO Level 1 & 2 FDAS, CCTV Room, ACS.pdf ELECTRONICS March 13, 2024

2893.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-033-0 Sht1-24_Various Comments.pdf March 13, 2024

2894.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1360- Abortive and Rectification 3 Hec Bndry CSA March 14, 2024
2895.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1361- 4-way light Switch for the Warehouse Above Ceiling ELECTRICAL March 14, 2024
2896.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1362- LPG Tank Housing Technical Description MECHANICAL March 14, 2024
2897.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1363- Dividing The Two Existing Client Offices CSA March 14, 2024
2898.0 No. Transmittal; copy sent Through Email RNT EA-1B_Power Supply.pdf March 14, 2024

2899.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-106_ Supply and Install of Electrical Wiring-Ins for Ambient Warehouse IT-IDFs.pdf ELECTRICAL March 14, 2024

2900.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1363- SD for Metal Doors Batch Additional Review.pdf CSA March 18, 2024
2901.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1367- SD Main, OB &IB Offices Fire Det.&Alarm Sys . Review.pdf FIRE PRO March 18, 2024
2902.0 No. Transmittal; copy sent Through Email DRCS-SSGI-MW-SCIC-SD-EL-086_0.pdf March 19, 2024
2903.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1369- SD Flood Light Mounting and Equipment Supply .pdf ELECTRICAL March 19, 2024
2904.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-086-0_Commented AOC.pdf March 19, 2024
2905.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-082-1.pdf March 19, 2024
2906.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1370- MS for Public Address Termination of Devices R1.pdf ELECTRONICS March 19, 2024
2907.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-082-1_Approved.pdf March 19, 2024
2908.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-061_1.pdf March 19, 2024
2909.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1371- MS Public Add,TelephoneData Inst.Box SettingR1.pdf ELECTRONICS March 19, 2024
2910.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-061-1_Approved.pdf March 19, 2024
2911.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1390- SD for SMH Guard House B.doc PLUMBING March 22, 2024
2912.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-088-0_0.xlsx March 22, 2024
2913.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1391- SD for Cable Tray -ELVSG-Feeder Line Etc. .pdf ELECTRICAL March 22, 2024
2914.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1392- Div of Feeder Lines Serving Bat. Chargers&Equp ELECTRICAL March 22, 2024
2915.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1393- MS Installation of Fire Water Pump and Jockey FIRE PRO March 22, 2024
2916.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1392- Diversion of Feeder Line Supplying RT and CB Bat ELECTRICAL March 26, 2024
2917.0 No. Transmittal; copy sent Through Email Fire Exit Section + Additional Steps (Blow-up) (Mar25-2024) CSA April 01, 2024
2918.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1407- RE_LTR-0279_ Add. Power Outlets for IDF-AWH ELECTRICAL April 01, 2024
2919.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-110- Corner Lot T-Junction Road Markings CSA April 03, 2024
2920.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-109_ Fire Protection System Sequence of Operation FIRE PRO April 03, 2024
2921.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1413- RFI 53 EE Panel Room Door Type and Detail Resp.pdf ELECTRICAL April 05, 2024
2922.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-RFI-053_With CP Comments.pdf April 05, 2024
2923.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-041-1.xlsx April 05, 2024
2924.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1412- SD for Utility Building Louver Plan and Detail.pdf MECHANICAL April 05, 2024
2925.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-041_rev.1_With CP Comment.pdf April 05, 2024
2926.0 No. Transmittal; copy sent Through Email FW_ SOLID LF MW PROJECT- CI Ref. No._ SGI-CON-MW-SCIC-CI-1132 (Revision 3 SD Schedule of Loads).eml April 05, 2024
2927.0 No. Transmittal; copy sent Through Email FW_ SOLID LF MW PROJECT- CI Ref. No._ SGI-CON-MW-SCIC-CI-1132 (Revision 3 SD Schedule of Loads)_1.eml April 05, 2024
2928.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1132 -SD for Schedule of Loads R3 Review.pdf April 05, 2024
2929.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1132 - SD for Schedule of Loads R3 Review_1.pdf ELECTRICAL April 05, 2024
2930.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1333 - SD Schedule of Loads R3 required resubmission.pdf ELECTRICAL April 05, 2024
2931.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1414- Urgent Resumission of Commented Schedule of Load R3.pdf April 05, 2024
2932.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051_Combined_23-12-11_AS.pdf April 05, 2024
2933.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051_Combined_23-12-11_AS_1.pdf April 05, 2024

2934.0 No. Transmittal; copy sent Through Email SOLID LF MW PROJECT- CI Ref. No._ SGI-CON-MW-SCIC-CI-1333 (SD for Schedule of Loads Revision 3 April 05, 2024
Required Resubmission ).eml
2935.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-043-1.xlsx April 05, 2024
2936.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1415- SD of Louver Windows R1 Review.doc.pdf MECHANICAL April 05, 2024
2937.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-043_rev.1 Sheet 2 of 8_With CP Comments.pdf April 05, 2024

2938.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-043_rev.1 Sheet 3 of 8_With CP Comments.pdf April 05, 2024

2939.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-043_rev.1 Sheet 4 of 8_With CP Comments.pdf April 05, 2024

2940.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-043_rev.1 Sheet 5 of 8_With CP Comments.pdf April 05, 2024

2941.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-043_rev.1 Sheet 6 of 8_With CP Comments.pdf April 05, 2024

2942.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-043_rev.1 Sheet 7 of 8_With CP Comments.pdf April 05, 2024

2943.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-043_rev.1 Sheet 8 of 8_With CP Comments.pdf April 05, 2024
2944.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1416- New Location of Window W2-65-H.doc CSA April 05, 2024
2945.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-112_ VAS Mezzanine Pallet Gate Clear Width Dimension CSA April 10, 2024
2946.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-111_ Finger Dock Height Adjustment and Wheel Stopper.pdf CSA April 10, 2024

2947.0 No. Transmittal; copy sent Through Email SK41 - FINGER DOCK ADJUSTMENT AA-3118 IFC REV3 (Revised).pdf CSA April 10, 2024

2948.0 No. Transmittal; copy sent Through Email SK41 - FINGER DOCK ADJUSTMENT plan (Revised).pdf CSA April 10, 2024
2949.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-056_0.xlsx CSA April 12, 2024
2950.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1431- SD Gate 3 Details at Guard House C.doc.pdf CSA April 12, 2024
2951.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-AR-056_wth FF comments.pdf CSA April 12, 2024
2952.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-055-0.xlsx CSA April 12, 2024
2953.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1432-SD for Wheel Stopper Details.pdf CSA April 12, 2024
2954.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ST-055-0Commened FF.pdf CSA April 12, 2024
2955.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-084-0.xlsx ELECTRICAL April 18, 2024
2956.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1446- UFO Type &Liniar Type Lighting Typ. Mounting .pdf ELECTRICAL April 18, 2024
2957.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-084_Approved_R&R.pdf ELECTRICAL April 18, 2024
2958.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1457- SD MO Dock Office Smoke Exhaust Dock Riser Layou.doc MECHANICAL April 19, 2024
2959.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1456- SD IB Dock Office Smoke Exh. Dock Riser Layout.doc MECHANICAL April 19, 2024
2960.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-GEN-005_0-Sht. 1 & 2.pdf ELECTRICAL April 20, 2024
2961.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-GEN-005_0-Sht. 1 & 2.xlsx ELECTRICAL April 20, 2024
2962.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1458- Prop. AS BUILT Title Block Template&Cover.pdf ELECTRICAL April 20, 2024
2963.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-GEN-004 rev.1_ AS BUILT Title Block Template.pdf ELECTRICAL April 20, 2024
2964.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-GEN-004_AS BUILT Cover Page.pdf ELECTRICAL April 20, 2024
2965.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-059 -0.xlsx April 22, 2024
2966.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1465- SD Doors Type D, E and F Review.pdf CSA April 22, 2024
2967.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1466- SD SD OB Dock Office Smoke Exhaust Dock Riser Layout.doc ELECTRICAL April 22, 2024
2968.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1468- Sd Pro. MRF Room ACMV Riser Layout.doc MECHANICAL April 22, 2024
2969.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-1469- SD VAS Mez. Cable Tray Layout, Main Feeder ELECTRICAL April 22, 2024
2970.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1470- SD Ambient Warehouse Fire Detection & Alarm System R1 FIRE PRO April 22, 2024
2971.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1471- SD AWH FDAS -ELV Devices Plan Ref at Racking Sys ELECTRONICS April 22, 2024
2972.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1472- SD Pro. Outbound Dock Office Level 1 ACMV Layout MECHANICAL April 22, 2024
2973.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1473- SD Revised Outbound Dock Office Level 2 ACMV Layout MECHANICAL April 22, 2024
2974.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1474- SD for Prop Rej. Goods Storage Rm ACMV Riser Layout MECHANICAL April 22, 2024
2975.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1475 - IB & OB Dock Office Add. Catch Basin&Sec.Det. R1.doc PLUMBING April 22, 2024
2976.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCSIC-SD-CV-028-1.xlsx April 29, 2024
2977.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1489- SD for Site Fence Stationing of FN06 at East Side R1.pdf CSA April 29, 2024
2978.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-113_ Back-up Air-condition Unit for ITServer Room MECHANICAL April 29, 2024
2979.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1493- Removal of Glass Balustrade of Stair-51 CSA May 2, 2024
2980.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-267_0.xlsx CSA May 6, 2024
2981.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1501- Material Submittal for Wall Hung Lavatory w.pdf CSA May 6, 2024
2982.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1502 - Making ITServer Room on 2nd Floor Level Ad CSA May 6, 2024
2983.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-261.xlsx CSA May 9, 2024
2984.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1513- MT SIKAFLEX-140 Construction.pdf CSA May 9, 2024
2985.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-030.xlsx CSA May 9, 2024
2986.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1512- SD for Pavement Joint Layout Review.pdf CSA May 9, 2024
2987.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1511- ITP Insta. of Devices and Acc. for PA Voice and Data CSA May 9, 2024
2988.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1514 - SD Typ. Detail of Sawn Joint - Type 3C Const. R3 CSA May 9, 2024
2989.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1523 - RE. LTR-0320-Add. Inst. for the Rec of Fire-Rated Walls CSA May 13, 2024
2990.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1547 - MEPF FAT - Manufacturers ELECTRICAL May 17, 2024
2991.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1548 - Door Panel and Jamb Color CSA May 17, 2024
2992.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1549 - ESSCOR Electrical Panel Connection.pdf ELECTRONICS May 17, 2024

2993.0 No. Transmittal; copy sent Through Email ESSCOR CCTV Schematic Layout & Electrical Panel Connection signed.pdf May 17, 2024

2994.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1554- Inspection and Test Plan for LV Cable Wire Insulation Resistance Testing.pdf ELECTRONICS May 20,2024

2995.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-066-0_Approved.pdf May 20,2024

2996.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1555- Material Submittal for 1-Gang Switch, 2-Gang Switch, 3-Gang Switch etc..pdf ELECTRICAL May 20,2024

2997.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-277 -0_Approved.pdf May 20,2024
2998.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-051_6.xlsx May 22, 2024

2999.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1556- Shop Drawing of Schedule of Loads - LP1-AWH, LP2-AWH and LP3-AWH (Sheet 13 of ELECTRICAL May 22, 2024
13).pdf
3000.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-030-1.pdf May 22, 2024
3001.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1557- Shop Drawing of Pavement Joint Layout Rev.1.pdf STRUCTURAL May 22, 2024
3002.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-CV-016-2.pdf May 22, 2024
3003.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1558- Shop Drawing of Ramp 01 Details Rev.2.pdf STRUCTURAL May 22, 2024
3004.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-041-1.pdf May 22, 2024

3005.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1559- Shop Drawing of Purlins Connection Detail for Guardhouse B.pdf CSA May 22, 2024

3006.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1559- Shop Drawing of Purlins Connection Detail for Guardhouse B CSA May 23, 2024

3007.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1560- SD for Proposed Guard House B ACMV and Refrigerant Layout, Section View and MECHANICAL May 23, 2024
Miscellaneous Detail Rev. 1 .pdf
3008.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-066-1_Approved.pdf MECHANICAL May 23, 2024
3009.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-MT-280.xlsx

3010.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1561- Material Submittal for Funnel Drains Fisher Fire Stopper (FIAM 600).pdf FIRE PRO May 23, 2024

3011.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-280-0_AOC.pdf May 23, 2024
3012.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-ITP-067.xlsx May 23, 2024

3013.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1562- Inspection and Test Plan for Installation of FM 200 Fire Suppression System.pdf FIRE PRO May 23, 2024

3014.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-067-0_AOC.pdf May 23, 2024
3015.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-MS-107.xlsx May 24, 2024
3016.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1566- Method Statement for Genset Start-up and Endurance Test.pdf MECHANICAL May 24, 2024
3017.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-107-0_AOC.pdf May 24, 2024
3018.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-MS-105.xlsx May 24, 2024

3019.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1565- Method Statement for the Installation and Commissioning of FM200.pdf FIRE PRO May 24, 2024

3020.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-105-0_AOC.pdf May 24, 2024
3021.0 No. Transmittal; copy sent Through Email FM200 NEW LOCATION.pdf May 24, 2024
3022.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1567- Relocation of FM200 to One Glance Area.pdf FIRE PRO May 24, 2024
3023.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-109-0.xlsx May 27, 2024

3024.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1569- Shop Drawing for Flood Light Loading Dock Area Typical Installation Details.pdf ELECTRICAL May 27, 2024

3025.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-109-0_Approved & AOC.pdf May 27, 2024
3026.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1568- Inspection and Test Plan for Cable Tray Installation.pdf ELECTRICAL May 27, 2024
3027.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-068-0_Approved.pdf May 27, 2024
3028.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-051_7.xlsx May 27, 2024

3029.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1570- Shop Drawing for Schedule of Loads - LP1-AWH, LP2-AWH and LP3-AWH rev.1.pdf ELECTRICAL May 27, 2024

3030.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051-1_AOC.pdf May 27, 2024

3031.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1572- Damage in Roof Deck Polyurethane Waterproofing Caused by Solid LF Fit-Out CSA May 27, 2024
Contractor Drilling Works.pdf
3032.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-LTR-331.pdf May 27, 2024
3033.0 No. Transmittal; copy sent Through Email GF Floor and Furniture Plan.png May 28, 2024
3034.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1574- Tiling Work Stoppage on Inbound Building.pdf CSA May 28, 2024
3035.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-108-0.xlsx May 28, 2024

3036.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1575- Shop Drawing for Below Ceiling Conduit Lighting Switch Mounting Details.pdf ELECTRICAL May 28, 2024

3037.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-108-0_AOC.pdf May 28, 2024
3038.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-014_1.pdf May 28, 2024
3039.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1578- Method Statement for Roughing-in Works for Electrical Rev.1 .pdf ELECTRICAL May 28, 2024
3040.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-014-1_Approved.pdf May 28, 2024

3041.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1579- Shop Drawing of Proposed Linear Return Air Grille at Main Office Level 2 Layout and MECHANICAL May 28, 2024
Miscellaneous Detail.pdf

3042.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-073-0_Approved.pdf ELECTRICAL May 28, 2024
3043.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1580- Comments EL ITP's.pdf ELECTRICAL May 28, 2024
3044.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-069_Approved.pdf ELECTRICAL May 28, 2024
3045.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-070_Approved.pdf ELECTRICAL May 28, 2024
3046.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-070_Approved.pdf ELECTRICAL May 28, 2024
3047.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-279_Approved ELECTRICAL May 28, 2024
3048.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1581- MT Lighting Fixtures with Sample Board Lloyd ELECTRICAL May 28, 2024
3049.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-TS-1582- Modification of Guardhouse B Power LAyout.pdf ELECTRICAL May 28, 2024
3050.0 No. Transmittal; copy sent Through Email SGI-MW-SCIS-SD-EL-004_rev.4 Sheet 1-Commented R & R.pdf ELECTRICAL May 28, 2024
3051.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-104.xlsx ELECTRICAL May 28, 2024
3052.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-108.xlsx ELECTRICAL May 28, 2024
3053.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-109.xlsx ELECTRICAL May 28, 2024
3054.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-110.xlsx ELECTRICAL May 28, 2024
3055.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-111.xlsx ELECTRICAL May 28, 2024
3056.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MS-112.xlsx ELECTRICAL May 28, 2024
3057.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1584- Electrical Method Statement as per List.pdf ELECTRICAL May 28, 2024
3058.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-104-0_AOC.pdf ELECTRICAL May 28, 2024
3059.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-108-0_AOC.pdf ELECTRICAL May 28, 2024
3060.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-109-0_AOC.pdf ELECTRICAL May 28, 2024
3061.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-110-0_AOC.pdf ELECTRICAL May 28, 2024
3062.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-111-0_AOC.pdf ELECTRICAL May 28, 2024
3063.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-112-0_AOC.pdf ELECTRICAL May 28, 2024
3064.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1583- Handover of Completed Works LP2 to LP5 Power Supply.pdf ELECTRICAL May 28, 2024
3065.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-003-0_Approved.pdf ELECTRICAL May 28, 2024
3066.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1585-NCR-032 (Basecourse at Pedestrian Walkway - East Side) CSA May 28, 2024
3067.0 No. Transmittal; copy sent Through Email SCIC-NCR-032 CSA May 28, 2024
3068.0 No. Transmittal; copy sent Through Email 2790300-SE-0210 R1 EXTERIOR PAVEMENT CONSTRUCTION DETAILS CSA May 28, 2024
3069.0 No. Transmittal; copy sent Through Email 2790300-CA-2032 r1 pavement joint layout sheet CSA May 28, 2024

3070.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1586- SD of Proposed Main Office Level 1 PWD Toilet ACMV Layout and Section View.pdf MECHANICAL May 29, 2024

3071.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-072-0_Approved.pdf MECHANICAL May 29, 2024
3072.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ELC-043.xlsx ELECTRICAL May 29, 2024
3073.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1587- Shop Drawing for Guard House B.pdf ELECTRICAL May 29, 2024
3074.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ELC-043-0_A & AOC.pdf ELECTRICAL May 29, 2024

3075.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1588- MT of Stainless Steel Railings (Grade 304) with Handrail Bracket and Clear Tempered CSA May 29, 2024
Glass with Sample Board
3076.0 No. Transmittal; copy sent Through Email Calibration Report (CRACL-2404-170).pdf.pdf May 29, 2024
3077.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1589- Calibration Report (CRACL-2404-170).pdf ELECTRICAL May 29, 2024
3078.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-051_8.xlsx May 30, 2024

3079.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1590- Shop Drawing of Schedule of Loads - LP4 to LP8 - AWH (Sheets 16 to 20).pdf ELECTRICAL May 30, 2024

3080.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051-16 to 20-0_AOC.pdf May 30, 2024
3081.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-088-2.pdf ELECTRONICS May 30, 2024

3082.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1591- SD of AWH Cable Tray Layout, Cross Section and Typical Mounting Detail, ELVSGM-02 ELECTRONICS May 30, 2024
to DT-4 & Genset to Sync Panel Cable Tray.pdf
3083.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-088-2_Approved.pdf ELECTRONICS May 30, 2024

3084.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1592- Key plan and Calibration Report Related to SGI-CON-MW-SCIC-CI-1583 & SGI-CON- ELECTRICAL May 30, 2024
MW-SCIC-CI-1590.pdf
3085.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-003-0_Approved.pdf May 30, 2024
3086.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-107-0 and Calibration Report_Approved.pdf May 30, 2024
3087.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051-16 to 20-0_AOC.pdf May 30, 2024
3088.0 No. Transmittal; copy sent Through Email SGI-GEN-RFI-LFL-116_ Prop. AC Environ. for GH-B Lobby & Corridor Area MECHANICAL June 4, 2024
3089.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-ST-058 -1_FF.xlsx June 5, 2024
3090.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1595- SD Detail Connection of Lightning Arrester Base Sup. .pdf ELECTRICAL June 5, 2024
3091.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1596- MT for Sikaflex-Pro 3 CSA June 5, 2024
3092.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-255 CSA June 5, 2024
3093.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-051_9.xlsx June 5, 2024
3094.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1597- Shop Drawing of Schedule of Loads (Sheet 21 TO 31).pdf ELECTRICAL June 5, 2024
3095.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051-21 to 31-0_AOC.pdf June 5, 2024
3096.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1598- SD for Outbound, Inbound and Battery & Guard CSA June 5, 2024
House B Shutter Door and Dock Leveler Power Layout.pdf
3097.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-110-0_Approved.pdf June 5, 2024

3098.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1599- Shop Drawing of Exhaust Fan Control Layout, EMT Pipe to Control Panel and Pull Box ELECTRICAL June 5, 2024
Details.pdf
3099.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-111-0_Approved.pdf June 5, 2024

3100.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1600- SD of Truck Power Supply Enclosure Circuit Breaker Location Plan and Elevation ELECTRICAL June 5, 2024
Details and Typical Installation Details .pdf
3101.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-113-0_Approved.pdf June 5, 2024
3102.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1603- Method Statement for GENSET Synchronization.pdf ELECTRICAL June 7, 2024
3103.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-106-0_R&R.pdf June 7, 2024
3104.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-106-0_R&R_1.pdf June 7, 2024
3105.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-AR-065-0.xlsx June 7, 2024

3106.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1604- Shop Drawing for Proposed Additional Framing Support for Glass Roof.pdf CSA June 7, 2024

3107.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1602- SD of Proposed FAHU-02 Ducting Riser Layout at Main Office, Section View and MECHANICAL June 7, 2024
Miscellaneous Detail.pdf
3108.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-060-0_Approved.pdf June 7, 2024
3109.0 No. Transmittal; copy sent Through Email DOOR D1-136-R.pdf June 7, 2024
3110.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1601- Rectification of Door Elevation – D1-136-R.pdf CSA June 7, 2024
3111.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1605-Photos.pdf June 7, 2024
3112.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1605- Seismic Gap on Hallway Ceiling at Inbound Office.pdf CSA June 8, 2024
3113.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1606- DOMESTIC PUMP FOR RELOCATION.pdf MECHANICAL June 8, 2024
3114.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1606-Reference Dox.pdf June 8, 2024
3115.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1607- IRRIGATION PUMPS FOR RELOCATION.pdf MECHANICAL June 8, 2024
3116.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1607-Reference Dox.pdf June 8, 2024
3117.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1610- Hand Over of Completed Works (HO-004, HO-005 and HO-006).pdf MECHANICAL June 11, 2024
3118.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-004-0_Approved.pdf June 11, 2024
3119.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-005-0_Approved.pdf June 11, 2024
3120.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-006-0_Approved.pdf June 11, 2024
3121.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1611- Short circuit LP2 MO Incident Report ELECTRICAL June 11, 2024

3122.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1612- Concrete Chipping to Embed Existing Electrical Conduits by 25mm At Handwashing ELECTRICAL June 13, 2024
Area Level 3 IB

3123.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1613- Hand Over of Completed Works (HO-007 and HO-008).pdf ELECTRICAL June 13, 2024

3124.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-007-0_Approved.pdf June 13, 2024
3125.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-008-0_Approved.pdf June 13, 2024
3126.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1614- ADDITIONAL 5KVA POWER SUPPLY FOR DATA CENTER ELECTRICAL June 14, 2024
3127.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1617- Trench Drain at Guardhouse-B Ramp.pdf PLUMBING June 20, 2024

3128.0 No. Transmittal; copy sent Through Email Trench Drain at Guardhouse-B Ramp Photo.pdf June 20, 2024
3129.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1618- Water Line Crossing Inside Drainage Manhole.pdf PLUMBING June 20, 2024
3130.0 No. Transmittal; copy sent Through Email Water Line Crossing Inside Drainage Manhole Photo.pdf June 20, 2024
3131.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-051_10.xlsx June 20, 2024
3132.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1619- Shop Drawing for Schedule of Loads (Sheets 5, 32, 33 and 34) .pdf ELECTRICAL June 20, 2024
3133.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-051-6_AOC.pdf June 20, 2024
3134.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1620_Photo1.pdf June 21, 2024
3135.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1620_Photo2.pdf June 21, 2024
3136.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1620_Photo3.pdf June 21, 2024
3137.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1620- Asymmetrical Misaligned Concrete Curb & Light Post Pedestal.pdf ELECTRICAL June 21, 2024

3138.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1621- Hand Over of Completed Works Continuity and Insulation Resistance Test at PP1-MO, ELECTRICAL June 21, 2024
PP2-MO and LP1-MO (HO-009).pdf

3139.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-009-0_Approved.pdf June 21, 2024
3140.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-ITP-074.xlsx June 21, 2024
3141.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-ITP-075.xlsx June 21, 2024
3142.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-ITP-076.xlsx June 21, 2024
3143.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1622- Inspection and Test Plan.pdf ELECTRICAL June 21, 2024
3144.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-074-0_AOC.pdf June 21, 2024
3145.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-075-0_AOC.pdf June 21, 2024
3146.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-076-0_AOC.pdf June 21, 2024

3147.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1623- Material Submittal for Axial Roof Fan WH-EF-01 to 28 (AXC-R 1250 – Systemair).pdf MECHANICAL June 26, 2024

3148.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-MT-283.xlsx June 26, 2024
3149.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-283-0_AOC.pdf June 26, 2024
3150.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MT-188-1_Approved.pdf June 26, 2024

3151.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1624- MT for Toilet Accessories – Sefa Liquid Dispenser, Tissue Dispenser and Jet Dryer Slim CSA June 26, 2024
(WILO).pdf

3152.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1625- Handover of Completed Works Continuity and Insulation Resistance Test HO-010.pdf ELECTRICAL June 26, 2024

3153.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-010-0_Approved.pdf June 26, 2024
3154.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1626- EXHAUST DUCT CANCELLATION (MRF & Rejected goods Area) MECHANICAL June 27, 2024
3155.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1627- Method Statement for GENSET Synchronization Rev.1.pdf June 28, 2024
3156.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-106-1_Approved.pdf June 28, 2024
3157.0 No. Transmittal; copy sent Through Email DRCS-SGI-MW-SCIC-SD-EL-110-1.pdf June 28, 2024

3158.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1628- SD for Outbound, Inbound and Battery & Guard House B Shutter Door and Dock CSA June 28, 2024
Leveler Power Layout (Sheet 1 of 5 to 5 of 5) .pdf

3159.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-110-1_Approved.pdf June 28, 2024
3160.0 No. Transmittal; copy sent Through Email SGI-GEN-TS-LFL-001_Attachment.pdf July 1, 2024
3161.0 No. Transmittal; copy sent Through Email SGI-GEN-TS-LFL-001_Received.pdf July 1, 2024

3162.0 No. Transmittal; copy sent Through Email SGI-GEN-TS-LFL-001- Male and Female Toilet at Admin Building 2nd Level (Partial Hand over).pdf CSA July 1, 2024

3163.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-SD-EL-116-0.xlsx July 1, 2024

3164.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1629- Shop Drawing of CPPS Pump, Irrigation Pump to PP-SE Panel Details .pdf ELECTRICAL July 1, 2024

3165.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-116-0_AOC.pdf July 1, 2024
3166.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1630-SD of VAS Mezzanine Cable Tray Layout, Main July 1, 2024
Feeder and Branch Supply Cable Tray and Support Elevation Details Rev.2.pdf
3167.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-090-2_Approved.pdf July 1, 2024

3168.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1631- SD of Proposed Outbound Dock Office Level 2 Chilled Water Piping Layout and MECHANICAL July 1, 2024
Miscellaneous Details Rev. 1.pdf

3169.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-ME-029-1_Approved.pdf July 1, 2024

3170.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1632- Method Statements (SGI-MW-SCIC-MS-077_1 SGI-MW-SCIC-MS-079_1 SGI-MW- MECHANICAL July 1, 2024
SCIC-MS-080_1).pdf
3171.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-077-1_Approved.pdf July 1, 2024
3172.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-079-1_Approved.pdf July 1, 2024
3173.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-080-1_Approved.pdf July 1, 2024
3174.0 No. Transmittal; copy sent Through Email PROPOSED NEW LAYOUT OF ROAD AT NORTH SIDE.pdf July 1, 2024

3175.0 No. Transmittal; copy sent Through Email PROPOSED NEW LAYOUT OF ROAD AT NORTH SIDE_commented.pdf July 1, 2024

3176.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1633- Proposed New Lay-out of Road-1 North section.pdf CIVIL July 1, 2024
3177.0 No. Transmittal; copy sent Through Email SGI-GEN-TS-LFL-002- Male Locker Room at Admin Building Ground Level (PH)_Received CSA July 1, 2024
3178.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1634- Handover of Completed Works-SGI-MW-SCIC-HO-PL-001.pdf CSA July 2, 2024
3179.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-PL-001-0_Approved.pdf July 2, 2024
3180.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1635- Inspection and Test Plan for Installation of Capacitor Bank .pdf ELECTRICAL July 2, 2024
3181.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-078-0_Approved.pdf July 2, 2024
3182.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1636- Handover of Completed Works-SGI-MW-SCIC-HO-FP-001.pdf ELECTRICAL July 2, 2024
3183.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-FP-001 -0_Approved.pdf July 2, 2024

3184.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1637- Handover of Completed Works-SGI-MW-SCIC-HO-ELC-001 and SGI-MW-SCIC-HO-ELC- FIRE PRO July 2, 2024
002.pdf
3185.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-ELC-001-0_Approved.pdf FIRE PRO July 2, 2024
3186.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-HO-ELC-002-0_Approved.pdf FIRE PRO July 2, 2024
3187.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1638- Method Statement of Installation of Capacitor Bank .pdf ELECTRICAL July 2, 2024
3188.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-MS-113-0_Approved.pdf July 2, 2024
3189.0 No. Transmittal; copy sent Through Email SGI-GEN-TS-LFL-003- Clinic and Lactation Room at Admin Building Ground level_Received CSA July 2, 2024
3190.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-SD-EL-101-0.xlsx July 3, 2024
3191.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1640- Shop Drawing for Outbound and Inbound Office Lighting Layout.pdf ELECTRICAL July 3, 2024
3192.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-101-0_AOC_Noted.pdf July 3, 2024
3193.0 No. Transmittal; copy sent Through Email DRCS-MW-SCIC-SD-EL-103-0.xlsx July 3, 2024

3194.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1641- Shop Drawing of Lighting Layout at Admin Office Level 1 and Level 2.pdf July 3, 2024

3195.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-SD-EL-103-0_AOC_Noted.pdf July 3, 2024

3196.0 No. Transmittal; copy sent Through Email SGI-CON-MW-SCIC-CI-1642- Inspection and Test Plan (SGI-MW-SCIC-ITP-077, SGI-MW-SCIC-ITP-079, SGI-MW- July 4, 2024
SCIC-ITP-080).pdf
3197.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-077-0_Approved.pdf July 4, 2024
3198.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-079-0_Approved.pdf July 4, 2024
3199.0 No. Transmittal; copy sent Through Email SGI-MW-SCIC-ITP-080-0_Approved.pdf July 4, 2024

LEGEND:
SD = SHOP DRAWING Prepared By:
FA = FOR APPROVAL
RFI = REQUEST FOR INFORMATION Guian Niko R. Cueno