PROJECT : PROPOSED DESIGN AND BUILD CONTRACT FOR THE DESIGN, DEMOLISH
AND REINSTATEMENT OF EXISTING FABER BUILDING PREVIOUSLY
OCCUPIED BY SAJIAN KEMBARA (PRINCETON ENGINEERING SDN BHD)
AT AYER KEROH REST AND SERVICE AREA SOUTHBOUND (“AYER KEROH
RSA SB”)
UNTUK : PLUS MALAYSIA BERHAD
1.0 INTRODUCTION
1.1 GENERAL
This report summarizes design criteria, assumption and approach, for Structural and Civil
engineering. The values have been established as being the most appropriate for this
project, giving all the objective of the consideration and constraints associated with the
project. The primary objective of this report is to define a clear and feasible design
approach with all design parameter well defined.
2.4 FOUNDATIONS
The Minimum safe bearing capacities (kN/m2) of the foundation material, adopted for
footing designs are as follow:
The modeling and analyze are done using computer aided engineering ESTEEM INTEGRATED V6.
The analysis of the structure per various loads and combination for member’s design and beam’s
deflection check under operational condition as shown in attached output file. The section and design
construction is satisfactory.
BEAM MARK: GB4
DESIGN THE SUPPORT MOMENT FOR MOST CRITICAL LIVE LOAD PATTERN
Beam Self-Weight
Section Begin Dist. End Dist. Unit DL LL
1 0.0 4050.0 kN 6.1 0
2 4050.0 8250.0 kN 6.3 0
3 8250.0 10950.0 kN 4.1 0
4 10950.0 12450.0 kN 2.3 0
82 82 82
157 157 157
0.25% 0.25% 0.25%
2T10 2T10 2T10
87 87 87
157 157 157
0.25% 0.25% 0.25%
2T10 2T10 2T10
82 82 82
157 157 157
0.25% 0.25% 0.25%
2T10 2T10 2T10
82 82 82
157 157 157
0.25% 0.25% 0.25%
2T10 2T10 2T10
AsReq : Area of Steel Required (mm²), AsProv : Area of Steel Provided (mm²), %Steel : Percentage of Steel Area Provided / Concrete Area
(%)
Design for Shear and Torsion Reinforcement
Distance Concrete Strength Stress Required Rebar
Span Section Zone
Start End νcs νt,min νss νst SAs/Sv TAs/Sv Provided
1 0 1013 0.44 0.37 0.06 0.00 0.24 0.00 R6-225
1 1 2 1013 3038 0.44 0.37 0.06 0.00 0.24 0.00 R6-225
3 3038 4050 0.44 0.37 0.09 0.00 0.24 0.00 R6-225
1 0 1050 0.42 0.37 0.08 0.00 0.24 0.00 R6-225
2 2 2 1050 3150 0.41 0.37 0.05 0.00 0.24 0.00 R6-225
3 3150 4200 0.42 0.37 0.08 0.00 0.24 0.00 R6-225
1 0 1050 0.44 0.37 0.11 0.00 0.24 0.00 R6-225
3
3 2 1050 2700 0.44 0.37 0.06 0.00 0.24 0.00 R6-225
4 1 0 1500 0.44 0.37 0.08 0.00 0.24 0.00 R6-225
Distance : Distance from left grid of section (mm)
νcs : Concrete Shear Strength (N/mm²), νt,min :Torsion Strength contributed by concrete (N/mm²)
νss : Concrete Shear Stress (N/mm²), νst : Concrete Torsion Stress (N/mm²) - Only BS, CP and EC2
SAs/Sv : Shear Steel Area/Spacing Ratio Required for Stirrup, TAs/Sv : Torsion Steel Area/Spacing Ratio Required for Stirrup
Beam Self-Weight
Section Begin Dist. End Dist. Unit DL LL
1 0.0 4050.0 kN 6.1 0
2 4050.0 8250.0 kN 6.3 0
3 8250.0 10950.0 kN 4.1 0
4 10950.0 12450.0 kN 2.3 0
82 82 82
157 157 157
0.25% 0.25% 0.25%
2T10 2T10 2T10
83 83 83
157 157 157
0.25% 0.25% 0.25%
2T10 2T10 2T10
82 2T10 82 2T10 82 2T10
157 157 157
0.25% 0.25% 0.25%
82 82 82
157 157 157
0.25% 0.25% 0.25%
2T10 2T10 2T10
82 82 82
157 157 157
0.25% 0.25% 0.25%
2T10 2T10 2T10
AsReq : Area of Steel Required (mm²), AsProv : Area of Steel Provided (mm²), %Steel : Percentage of Steel Area Provided / Concrete Area
(%)
Beam Self-Weight
Section Begin Dist. End Dist. Unit DL LL
1 0.0 3600.0 kN 4.9 0
74 106 74
157 157 157
0.28% 0.28% 0.28%
2T10 2T10 2T10
AsReq : Area of Steel Required (mm²), AsProv : Area of Steel Provided (mm²), %Steel : Percentage of Steel Area Provided / Concrete Area
(%)
========================================================================
1 13.4 0.0
2 13.4 0.0
1 0.42 0.21 0.42 0.46 0.46 0.46 1R 6-200 1R 6-200 1R 6-200 6.09
========================================================================
Column Fixity: Top X = Fixed; Top Y = Fixed; Bottom X = Fixed; Bottom Y = Fixed
Column Effective Height Coefficient: X = 0.75; Y = 0.75
nXYIt XIt YIt MLayer SLayer Nos As % Nuz Alpha Mx Mux RX My Muy RY Ratio
3 2 2 1x 2T12 1x 2T12 4 452 1.6 497 1.00 1 18 0.03 1 7 0.16 0.19
Because of Tension force due to Transfer Wall --> Shear Capacity = 0.000 N/mm^2
The Following Design Parameters are used for Bending Moment Design:
Maximum Concrete strain, Ecc = 0.0035
Average Concrete Stress Above Neutral Axis, k1 = 10.20 N/mm^2
Concrete Lever Arm Factor, k2 = 0.4557
Limiting Effective Depth Factor, cb = 0.50
Limiting Concrete Moment Capacity Factor, kk1
= cb*k1*(1-cb*k2) = 0.50*10.20(1-0.50*0.4557) = 3.9379 N/mm^2
k2/k1 Factor, kkk = 0.0447
Summary: Effective depth for Punching Shear Stump Shear Flexural Shear
170 68 100
Moment along Y-axis = Wu*X^2/8 = 0.13*1350*1350/8000 = 29.4 kNm/m
Moment along X-axis = Wu*Y^2/8 = 0.13*1350*1350/8000 = 29.4 kNm/m
For Footing Design, limit Mu/bd^2 < 0.5*kk1: Mu/bd^2 = 0.960 ; 0.5*kk1 = 1.969
Mu/bd^2 = 0.960 < 1.969 -->O.K. !
For Footing Design, limit Mu/bd^2 < 0.5*kk1: Mu/bd^2 = 0.960 ; 0.5*kk1 = 1.969
Mu/bd^2 = 0.960 < 1.969 -->O.K. !