PROJECT POLICIES
( SCE / EAR & CAR )
INDEX :-
. GENERAL
EXCLUSIONS
PERIOD
RATING
PROVISIONS TO SEC. I
SUM INSURED
PREMIUM ADJUSTMENT
AOG Claims
& Major Peril Claims
BY D.KAUSHAL
PROJECT POLICIES
( SCE / EAR & CAR )
A. GENERAL
e.g.
CAR POLICY
MCE POLICY
CAR POLICY For covering Civil Engg. Works ( e.g construction of bridges,flyovers etc )
EAR ( Erecrtion All For covering erection / installation of plant & machineries.
Risk) or
SCE ( Storage cum
Erection ) Policy
MCE ( Marine cum Combines marine / transit risk & erection risk under single policy.
Erection ) Policy
Marine cover is as per All Risk cover under ICC A & / or Inland transit
Rail / Road Cl. A ( with same provisions as in marine policy clauses )
NOTE :- Most coverages , extensions , exclusions ,provisions etc are same for SCE &
CAR policies ( with only some differences )
Hence, the details for two policies are mentioned below side by side .
SECTION I( MD )
COVERAGE :- All Risk cover except for certain All Risk cover except for certain
exceptions specified in policy exceptions specified in policy
COVERING PERILS :- During storage , erection , testing. During storage & construction /
erection .
( & during maintenance if opted ( & during maintenance if
at extra premium ). opted at extra premium ).
for Zone III & IV covered without – for Zone III & IV covered
additional premium without additional premium
For Zone I & II by additional For Zone I & II by additional
premium ( optional ) premium ( optional )
SECTION II ( TPL ) - COVERAGE - same for both EAR & CAR POLICIES :-
Also payable are : Litigation expenses recovered by third party from insured
& other expenses incurred with Cos consent .
- only if S.I for AOA / AOP is upto 10 % of SCE S.I. ( i.e. project value ) or Rs. 10 Crore whichever less
- & if S.I. exceeds above limit TPL cover to be given by separate Liability policy’ under miscll. deptt.
SCE ( EAR ) / CAR 6
EXCLUSIONS :-
EXCLUSIONS 3 types –
a) General exclusions - for both SecI Same 3 types in CAR also.
& II ( MD & TPL
e) not excluded in
c) Wilful act / willful CAR
negligence
of insured
EAR CAR
EAR CAR
Other Exclusions
Excess , SAME
for Sec I only
( MD ) Inventory losses , AS IN
d) damage to Property of
contractors ,
principals or
connected firm
or their employees
PERIOD
SCE ( EAR ) / CAR 9
PERIOD From - time of unloading ( i.e. arrival ) of From - time of unloading ( i.e.
first material at site arrival ) of first material at site
( LIABILITY ) :-
Until after - First Test operation Until -
or Test loading whichever earlier contract work taken over
or
but not beyond - 4 weeks from date of Trial put into service by principal
Running
or Readiness of work declared or expiry date
whichever earlier .
whichever is earlier .
or policy expiry date if earlier to
above .
NOTES :-
a) Above period of 4 weeks of trial run
can be extended by extra premium .
b) Period bPeriod
SUM INSURED :- S.I. to be-Completely Erected Value. S.I. to be-Completely Erected Value.
To include :- To include :-
a) Cost of Material & Machinery a) Cost of Material & Machinery
( including : Freight , Insurance ( including : Freight , Insurance
Custom duty Custom duty
Handling charges) Handling charges)
CIVIL
ENGG.WORK :
( permanent & - to be necessarily covered ( i.e. its N.A.
temporary ) value to be taken in S.I. for SCE ).
PREMIUM
- At completion of project . - At completion of project .
ADJUSTMENT
- On basis of Actual Completely - On basis of Actual Completely
Erected Value (Vs. S.I. ) Erected Value (Vs. S.I. )
& premium adjustment only if differ. & premium adjustment only if differ. in
in actual value & S.I. is due to actual value & S.I. is due to
factors like Erection cost factors like construction cost
Freight, Handling Chrgs Freight, Handling Chrgs
Custom dues . Custom dues .
MEMO -
( Same as for EAR ) :-
Loss to Loss to
Property Property
COVERS:-
- belonging to / in custody - belonging to / in custody
of Principals or Contractors of Principals or Contractors
AOG Claims - in - Earthquake ( Fire & Shock ) - Earthquake ( Fire & Shock )
Ear
- Landslide / Rockslide / Subsidence - Landslide / Rockslide / Subsidence
& Major Perils
SCE ( EAR ) / CAR 13
- Collapse
NOTE : - Collapse & Water damage NOTE : - Collapse & Water damage
for Wet risks for Wet risks
not included under this head included under this head
of AOG claims ( in EAR ) of major peril claims
( in CAR )
NOTE:- These Claims have higher NOTE:- These Claims have higher
Excess Excess
SOME OTHER a)Express Freight(excluding Air frt. ) a)Express Freight(excluding Air frt. )
EXTENSIONS
b) Air freight only b) Air freight only
ARE :-
( by extra c)Work on Holidays & Overtime rates c)Work on Holidays & Overtime rates
premium ) of wages of wages
b) Covering solely -
& loss to property
caused by contractor ( i.e. contractor doing maintenance work )
in course of
carrying operations for complying maintenance provisions .
SCE ( EAR ) / CAR 15
B ) EXTENDED
MAINTENANCE
B ) EXTENDED MAINTENANCE :-
B) Covering -
loss to property (which may arise in 2 ways )
( Sometimes a loss may have been caused during erection period but it
manifests ( i.e. occurs ) sometimes later during maintenance period . Such loss is
covered only under EXTENDED MAINTENANCE extension.
DEBRIS - Cover for removal & clearance of Cover for removal & clearance of
Debris - Addl. Premium @ SCE rate Debris - Addl. Premium @ CAR rate
REMOVAL
on its selected S.I. on its selected S.I.
- If project is mix of old & new - If project is mix of old & new
machinery EAR rate for new machinery EAR rate for new M/C
M/C applicable on this extn. applicable on this extn.
To remember D S U E or D S A E
- excess is Lower for Normal period - Higher Excess for AOG / collapse
SCE ( EAR ) / CAR 17
DEFINITION OF
‘ONE INCIDENT
FOR PURPOSE OF AOG Excess is per incident
EXCESS FOR
AOG / MAJOR - Single incident not terminated
PERILS : until 7 consecutive days freedom
from such peril .
- i.e. only if incident is repeated
after 7 consecutive free days, it
will be new incident & fresh
excess will apply.
- But not allowed for Sec II ( TPL) - But not allowed for Sec II ( TPL)
SCE ( EAR ) / CAR 19
NOTE : - No Fire policy can be issued during Testing period for items covered under EAR policy.
a) Operational testing :-
i) Checking parts under NO LOAD condition. i) Checking of parts under LOAD condition.
( i.e under Operating condition )
ii) Without involving
operation of Furnances, ii) It involves
use of Heat , operation of Furnances,
use of Feedstock use of Heat ,
or use of Processing material use of Feedstock
or use of Processing material
j) Commissioning testing :-
In Hot testing :-
plant is exposed to Full Load Conditions for the
first time & hence there is uncertainty & hence more
risk for insurers.
SCE ( EAR ) / CAR 20
d) Notice for early completion in advance & in any case not later than 7 days from
start of testing .
From - date of synchronization of Turbo-Gen. set with Grid system / bus bar
provided date of synchronization within 72 Hrs. from introduction of Steam
into Turbine
or from date of introduction of Steam into Turbine, in case above date of
synchronization is after 72 hrs.
Till - T.G set operates at full load capacity for continuous 72 Hrs.
Or expiry of testing period under policy whichever earlier.
Test operation is deemed to have started from 12.05.09 ( i.e. dt. of synchronization )
But
b) if date of above synchronization is - 15.05.09.
i.e. 5 Days (i.e. not within 72 Hrs )
Test operation is deemed to have started from 10.05.09 ( i.e. dt. of introduction of
Steam )
are those plant where both GTs & STs ( Gas turbines & Steam turbines ) are