12.2 FOUNDATION CONCRETE CHECK LIST

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

NEXHS RENEWABLES PRIVATE LIMITED

Module 4, Seventh Floor, Block B, Phase II, IIT Madras Research Park,
Kanagam Road, Taramani, Chennai 600113, Tamil Nadu, India.
Ph: +91 98848 01235 | +91 87544 34872 |
Website: www.NeXHS.com | Email: info@NeXHS.com
`

Date: FOUNDATION CONCRETE CHECK LIST Location:

Grade of concrete:
Concrete cover:
Grade of cement:
Details of admixture added (if any):
Expiry date of admixture:
Water cement ratio:
PH value of water:
Batching Report:
Pour card details:
Transporting time of concrete:
Temperature condition:
Cube test:
(Cubes samples shall be marked with location number, date and identification number)
Slump test:
(Slump test shall be carried out for each and every truck and record it in specified format)
Casting Start Date and Time:
Casting End Date and Time:

SI Verification
Description Remarks
No Yes No
1 Check surface preparation

2 Check for Form work and stagging

3 Conduits/ Ducts opening/ Insert Plates provided?

105 | P a g e
NEXHS RENEWABLES PRIVATE LIMITED
Module 4, Seventh Floor, Block B, Phase II, IIT Madras Research Park,
Kanagam Road, Taramani, Chennai 600113, Tamil Nadu, India.
Ph: +91 98848 01235 | +91 87544 34872 |
Website: www.NeXHS.com | Email: info@NeXHS.com
`

4 Check for provision of vibrators?


Working condition of mixer/ vibrators checked
5 and gaps between plates in mixer drum to be
checked?
Access platform and walkways (if required)
6
provided?
7 Check reinforcement as per drawings

8 Check Embedded parts

9 Check cover to Reinforcement

10 Check Plumb

11 Check Reduced levels

12 Concrete Trail Mix Report


All materials for concrete are batched as per
13 approved design mix in suitable weigh batcher of
adequate capacity and approved design
The mixers are operated at the speed and time
14
recommended by their manufactures
The batching reports and trail mix reports are
15
verified and checked.
16 Check for Concrete (Pour card)
Slump test is carried out in RMC Plant & site
17
location
Cube test with required numbers of cubes as per
18
IS
Boom Placer Maintain 1M Height from Pouring
19
Area.

Contractor: Quality Engineer: Customer:

Signature: Signature: Signature:

106 | P a g e

You might also like