Professional Documents
Culture Documents
12.2 FOUNDATION CONCRETE CHECK LIST
12.2 FOUNDATION CONCRETE CHECK LIST
12.2 FOUNDATION CONCRETE CHECK LIST
Module 4, Seventh Floor, Block B, Phase II, IIT Madras Research Park,
Kanagam Road, Taramani, Chennai 600113, Tamil Nadu, India.
Ph: +91 98848 01235 | +91 87544 34872 |
Website: www.NeXHS.com | Email: info@NeXHS.com
`
Grade of concrete:
Concrete cover:
Grade of cement:
Details of admixture added (if any):
Expiry date of admixture:
Water cement ratio:
PH value of water:
Batching Report:
Pour card details:
Transporting time of concrete:
Temperature condition:
Cube test:
(Cubes samples shall be marked with location number, date and identification number)
Slump test:
(Slump test shall be carried out for each and every truck and record it in specified format)
Casting Start Date and Time:
Casting End Date and Time:
SI Verification
Description Remarks
No Yes No
1 Check surface preparation
105 | P a g e
NEXHS RENEWABLES PRIVATE LIMITED
Module 4, Seventh Floor, Block B, Phase II, IIT Madras Research Park,
Kanagam Road, Taramani, Chennai 600113, Tamil Nadu, India.
Ph: +91 98848 01235 | +91 87544 34872 |
Website: www.NeXHS.com | Email: info@NeXHS.com
`
10 Check Plumb
106 | P a g e