DEVELOPMENT OF NOOR CITY- CONSTRUCTION OF

97 RESIDENTIAL BUILDINGS
Table of Contents:
1- 97 Residential Buildings Shop Drawings and Materials Status.

1.1- Materials Status.


1.1.1- Materials Infrastructure Status
1.2- Shop drawings Status.
1.2.1- Structural shop drawings Status.
1.2.2- Architectural shop drawings Status.
1.2.3- Infrastructure shop drawings Status.
1.2.4- Landscape shop drawings Status.
1.2.5- Roads Shop Drawing Status.
1.3.1- RFA Status .
1.3.2- RFA Landscape Status .
1.3.3- RFA Infrastructure Status .
1.4- RFIs Status .
1.1- Materials Status.
No. Submittal Ref. REV. Description Received Date Remarks
Grout For Ceramic Tiles , Manufacturer : 09-06-2024
01 SUB-MAT-AR-0440 01 Araco , Product : Araco Tile Grout (Pending)
02-06-2024
02 SUB-MAT-AR-1998 01 Aluminium Louvers
(Pending)
26-03-2024
03 SUB-MAT-ME-2010 04 Fire Hose Cabinet , ( WATANIA )
(Pending)
Decorative Glass Handrail Assembler &
19-12-2023
04 SUB-MAT-AR-2353 00 Installer Alex Const. Application Area
Balconies (Pending)
Post Installed Anchor Bolts Manufactured
02-06-2024
05 SUB-MAT-AR-2683 01 by ETACO Applied for Aluminium Louvers
Installation (Pending)

Pipe Rubber Clamp For All Plumbing Pipe’S 05-06-2024


06 SUB-MAT-PB-2749 00 Diameters) - Speed Fix Company (Pending)

TERRAZZO TILES PRODUCT 30x30x3 cm


08-06-2024
07 SUB-MAT-EL-2757 00 MANUFACTURER ElBaraka FACTORY
APPLICATION ROOFS & SHAFTS (Pending)
1.1.1- Materials Infrastructure Status.

No. Submittal Ref. REV. Description Received Date Remarks

Street Lighting Fixtures


23-12-2023
01 SUB-MAT-EL-2009 01 Supl : EL Nassera Group
-Lighting Fixtures Type F1 (94W) (RAMSIS ) (Pending)

Infrastructure
Pressure networks
Materials : Telescopic Extension Spindle 25-03-2024
02 SUB-MAT-WN-2631 00 MANUFACTURER : AL Andalus BIMIX (Pending)
Applied for : Water & irrigation , fire fighting
Networks.

Street Lighting Pole And Fixture


Supplier : NASSERA GROUP 30-05-2024
03 SUB-MAT-EL-2751 00 Pole 5m:Karna-3modules-58.5W-2200K (Pending)
Pole 8m:Karna-6modules-117W-2200K
1.2.1- Structural SDW Status.
No. Submittal Ref. REV. Description Type Received Date Remarks
Stair 2 Details Plans 10-06-2024
01 SUB-SDW-AR-2758 00 Stair 2 Details Sections A1
(Pending)

1.2.2- Architecture SDW Status.


No. Submittal Ref. REV. Description Type Received Date Remarks
10-12-2023
01 SUB-SDW-AR-2302 00 Glass Handrail Detail 1&2 E
(Pending)

1.2.3- Infrastructure SDW Status.


No. Submittal Ref. REV. Description Received Date Remarks
Infrastructure Subsoil Network Layout & Profile 27-11-2023
01 SUB-SDW-SUS-2093 01 for Subsoil Building 28 (Pending)
1.2.4- Landscape SDW Status.

No. Submittal Ref. REV. Description Received Date Remarks


Key Plan Typical Details
Typical Details ( Pavement 1.2M & Protect
Pavement )
06-06-2024
01 SUB-SDW-AR-2275 01 Hardscape Details ( 2M Walkway & 0.8 Private
Garden Walkway ) (Pending)
Hardscape Details ( Main Walkway )
Hardscape Details ( Main Enterance )
05-06-2024
02 SUB-SDW-ST-2746 00 Concrete Dimensions For Fence RC Strip Footing
(Pending)

1.2.5- Roads SDW Status.

No. Submittal Ref. REV. Description Received Date Remarks


Spot Elevation & Low Point Of Park (B1-P49)
Setting Out Of Park (B1-P49) 10-06-2024
01 SUB-SDW-SUR-2759 00 Profile Of Park (B1-P49) (Pending)
Storm Water Drainage Of Park (B1-P49)
1.3.1- RFA & RFP AND SKETCH Status .
No. Submittal Ref. REV. Description Received Date Remarks
Request For Alternative Modification OF Glass Handrail All 23-11-2023
01 SUB-RFA-SKT-1076 02 Types
(Pending)
22-05-2024
02 SUB-RFA-AR-2650 02 Request For Alternative Entrance looking up – Type E
(Pending)

Request For Proposed Change in the Main Entrance wall 22-05-2024


03 SUB-RFP-AR-2737 00 mounted handrail
(Pending)
Request For Proposed Change Embedded AC drainage pipes 28-05-2024
04 SUB-RFP-AR-2739 00 Type A1
(Pending)

Request for Alternative


Item : Material of Metal Flashing
Proposed : Aluminium Flashing 0.50 mm th. Instead of 28-05-2024
05 SUB-RFA-MAT-2742 00 stainless steel Flashing 1.00 mnm th. (as specified) (Pending)
Applied for: separation line between internal face of roof
parapet and sloped skirting

10-06-2024
06 SUB-RFP-AR-2761 00 Request For Proposed Change Shaft Louvers All Types
(Pending)
1.3.2- RFA & RFP AND SKETCH Status (Landscape).
No. Submittal Ref. REV. Description Received Date Remarks
Request For Alternative 05-05-2024
01 SUB-RFA-AR-2699 00 Private Garden Modification in Landscape B.NO (49)
(Pending)
Request For Proposed Change Subsoil Network I.F.C in 10-06-2024
02 SUB-RFP-AR-2764 00 Landscape
(Pending)

1.3.3- RFA & RFP AND SKETCH Status (Infrastructure).


No. Submittal Ref. REV. Description Received Date Remarks
Request for alternative
infrastucture networks 20-02-2024
01 SUB-RFA-MAT-2567 00 Material: Labels on the internal face of the surface box cover. (Pending)
applied for : water-Irrigation-Fire Fighting networks
1.4- RFIs Status .
No. Submittal Ref. Description Received Date Remarks

07-04-2024
01 RFI-AR-0209-REV.1 Thickness of marble become 20mm ( Landscape)
(Pending)

26-02-2024
01 RFI-EL-0215 The Apartment Smart City Requirements -For Noor Buildings
(Pending)

15-05-2024
02 RFI-AR-0221 Composite As-built B . No.(23-29)
(Pending)

UPVC Fittings of back drop for gravity networks (sewage & storm ) 16-05-2024
03 RFI-WN-0222 networks (Pending)

16-05-2024
05 RFI-AR-0223 Landscape Modification B.NO (23-29)
(Pending)

04-06-2024
06 RFI-WN-0225 Change In Thrust Block For Hdpe Pipes
(Pending)