JI-2026-LEAD-1179-0103_Rev A - CANCELED
JI-2026-LEAD-1179-0103_Rev A - CANCELED
Status
Status Code Description
Code
APPROVED WITHOUT COMMENTS. (SUPPLIER can proceed with the subsequent
1
work)
APPROVED WITH MINOR COMMENTS. (SUPPLIER can proceed with the
2 subsequent work if SUPPLIER agrees to the comments; SUPPLIER to revise and
resubmit for approval in code ‘A’)
NOT ACCEPTABLE. (SUPPLIER shall rework / redesign / re-specify the contents
3
of documents according to PIUL’s comments.)
4 NOT SUBJECT FOR APPROVAL (PIUL does not foresee need of approval.)
5 Cancelled / Deleted
Reviewing Engineer’s Name, Sign and Date
PetroPCS ITR
No. Project ITR No. Description
No.
This document is based on GRN Project specifications, widely used international codes, standards and good
engineering practices that are applied in Oil & Gas Projects and is intended to highlight the minimum tests and
inspections to ensure quality requirements are fulfilled within the scope of the document.
This ITP serves primarily as a plan and it shall NOT be used to obtain signatures. Acceptance Signatures shall be
obtained on the referenced inspection and test records, which shall form generic records to be handed over to the
Client.
The referenced inspection and test records (ITR’s) are controlled independently. Therefore, the latest revision of
these ITR’s, at the time of initiation of the ITR’s, shall be utilized.
When filling ITR’s do not leave any blanks. If any item/activity is not applicable for the case denote as N/A.
If any correction is required, strike once, correct and counter sign. Use of correction fluid on ITR is forbidden.
ITR number suffixed with letter “X” are classified as in-process Site/Field Quality Records and will not be part of the
Turnover System Process where as ITR number suffixed with letter “A” are part of the Turnover Process and Turnover
Records.
REGGANE NORDDEVLOPMENT PROJECT
SURFACE FACILITIES,ALGERIA
PETROFAC PROJECT NO. : JI-2026
INSPECTION & TEST PLAN
ROADS AND PAVEMENT
Reference Documents
PS-0000-1151-0320-E Scope of Work
JI-2026-LEAD-1179 -0009 QCP - Procedure for Control of Non-Conforming Products and Services
ASTM D2166:2006 Standard test method for Unconfined Compressive strength of Soil
Standard Test Method for Water Content of Soil and Rock in Place by
ASTM D3017:2005
Nuclear Methods (Shallow Depth)
Methods of test for soils for Civil Engineering Purposes Part 3 : Chemical and
BS 1377 Part3:1990
Electro Chemical tests.
ASTM D4318:2005 Standard test method for Liquid limit, Plastic limit and Plasticity Index of Soils
ASTM D5874:2002 Standard Test Method for Determination of the Impact Value (IV) of a Soil
Standard Test Method for In-Place Density and Water Content of Soil and
ASTM D6938:2010
Soil-Aggregate by Nuclear Methods (Shallow Depth)
REGGANE NORDDEVLOPMENT PROJECT
SURFACE FACILITIES,ALGERIA
PETROFAC PROJECT NO. : JI-2026
INSPECTION & TEST PLAN
ROADS AND PAVEMENT
Definitions/Abbreviations
An inspection where PIUL/ISG plans to audit, monitor or witness the activity in
RI-Random Inspection : process on random or periodic basis. No formal notification (RFI) required to
inspection parties.
An activity that requires the review and acceptance of the Subcontractor’s
R- Review Point : documentation. No formal notification (RFI) required to inspection parties.
Monitoring or observation to verify whether or not materials, items, or
installation conform to specified requirements. Surveillance activity may include
S- Surveillance : audit, inspection, witness of testing, review of quality documentation and
personnel qualification, and evaluation of personnel performance. No formal
notification (RFI) required to inspection parties.
An activity that requires witnessing by inspection parties as indicated in this ITP.
The Subcontractor shall notify PIUL QC/ISG 24hrs in advance. After proper
W-Witness Point : notification has been provided, the PIUL is not obliged to hold further processing
if the ISG Inspector is not available to attend or to witness the activity on the
date & time notified. Formal notification (RFI) required to inspection parties.
An activity that requires inspection/verification and acceptance by inspection
parties as indicated in this ITP before any further processing is permitted.
Subcontractor shall notify PUIL QC/ISG 24hrs in advance. The Subcontractor shall
H-Hold Point : not proceed with further activities beyond the HOLD point unless the responsible
inspector’s acceptance has been obtained. Formal notification (RFI) required to
inspection parties.
SC : Construction Subcontractor
PIUL : Petrofac International (UAE) LLC
ISG : Groupement Reggane
ARA : Algerian Regulatory Authorities.
QA/QC : Quality Assurance/ Quality Control
RFI : Request for Inspection.
ITR : Inspection & Test Record
IM&TE : Inspection, Measuring & Test Equipment
IFC AFC issued : Approved For Construction
LTPS : Laboratorie des Travaux Publics du Sud
LMDD : Laboratory Maximum Dry Density
CBR : California Bearing Ratio.
NA : Not Applicable
PetroPCS : Petrofac’s Project Completion System
REGGANE NORDDEVLOPMENT PROJECT SURFACE FACILITIES,ALGERIA
PETROFAC PROJECT NO. : JI-2026
Construction method
Review of applicable
statement Site
Construction Construction
Procedures/Drawings/ JI-2026-LEAD-1179- Complies with AFC Engineer NIL S S S NA
1.0 Procedures, Drawings
Documents and ensure that 0304 document register Civil
and Documents status
latest revision is available at Inspector
Relevant AFC
site
drawings
PD-00000-1162-0016-B Testing equipment
shall be in good
working condition.
Testing equipments Testing
Verification of test equipment
QCP-On site civil shall be in accordance Contractor laboratory
calibration certificates and
with relevant test appointed audit report
validity. material testing
Civil Material testing standard(ASTM) testing or evidence
2.0 H H W NA
Laboratory laboratory working Test equipments laboratory of
Laboratory test equipment list operated by companies
procedure calibration certificates s
and maintenance register to be LTPS approval of
shall be current.
maintained. test house.
Testing laboratory
shall be approved by None
PIUL QC prior to use
course shall be
minimum 60mm
Asphalt surface course shall be 100mm thick
thick.
Asphalt shall be laid
in correct required
thickness. So that
shall be in
accordance with
standard detail of 2 cores or nuclear gauge tests shall be
road.
taken per 1000meter compacted asphalt
Acceptance criteria road
for asphalt
compaction test Asphalt mix shall be compacted to
shall be in 95% of bulk density.
accordance with
local regulations.
Lests for asphalt mix Tests for asphalt mix laid shall be
shall comply with carried out by LTPS laboratory
local regulations.
Inspection of completed
Road specification- Site
asphalt road Asphalting shall be
Asphalting / Asphalt Engineer.
PS-00000-1162-0013-E in accordance with
11.0 Repairs / Final Completion of Asphalting JI-2026-ITR- H W W NA
Clause 8. standard detail of
Inspection Road section Civil C-0302A
road.
Final inspection PD-00000-1162-0016-B Inspector H
IFC drawing for road Material used for Site
Road Signs and Verification of Road signs and signs and markings. road marking shall Engineer. JI-2026-ITR-
12.0 H W RI NA
marking marking be in accordance C-0301X
Item # 12 should be before Item # 11 Road specification- with IFC drawing. Civil
REGGANE NORDDEVLOPMENT PROJECT SURFACE FACILITIES,ALGERIA
PETROFAC PROJECT NO. : JI-2026
PS-00000-1162-0013-E Inspector
Road signs written in
Clause 3.1. French must comply
with the
All road signs shall
International comply with local
standards and good regulations
engineering
practice.
Site
Documentation review All QC record shall be Engineer.
13.0 and final acceptance PetroPCS signed off by relevant Ji-2026-ITR- H R R NA
Compiling all QC records.
of road works. QC personnel. Civil C-0302A
Inspector
NOTE: Prior to start of physical activity at site, Pre-Construction QC Meeting with the Sub-Contractor shall be conducted by PIUL
and ISG shall be invited.
ITR- C-0102X
Project No:JI-2026
EARTH WORK SURVEY REPORT
Record No:
Structure/member
Area
Signature
Date
ITR No : C-0301X
Reggane Nord Development Project Surface
Project ITR No:
Facilities, Algeria JI-2026-ITR-C-301X
Rev : 1
Location
Inspection findings
Sl.no Description of Inspection Activity Remarks
Satisfactory Unsatisfactory
1 Survey report verified
Sub-grade compaction and formation
2 Sub grade compaction tests and CBR tests are satisfactory
surface preparation verified
3 Road base test
base course certificates
material verification
test reports verified and found satisfactory
4 Road base material thickness verified
Base course thickness is satisfactory
5 Sub-base material test certificate verified
6 Sub base material thickness verified
Sub-grade and road base compaction test
7
reports verified
8
Tack Seal coat application verified is satisfactory
9 Prime coat application verified is satisfactory
10 Asphalt mix design approval verified and found satisfactory
11 Asphalt thickness verified and found satisfactory
12 Asphalt compaction test satisfactory
Road marking and road signs installation
13
verified and found satisfactory
14 % of optimum moisture content
Remark :
Signature
Date
ITR-C-0302A
Reggane Nord Development Project Surface
Facilities, Algeria Project ITR number:
JI-2026-ITR-C-0302A
Rev : 0
Road works completion
Project No: JI 2008
SPACE RESERVED FOR BARCODE
SUB-SYSTEM No:
Structure/member
Area description :
Confirm the Road is constructed to the correct finished elevation and coordinates is as
1
per IFC drawing.
Confirm that compaction test reports for all layers of Road material filling is
2
satisfactory
Confirm that fill material used for filling for road work is in accordance with project
3
specification for earth works and all test records available.
4 Confirm the road sub grade is of required CBR as per IFC drawing
Confirm that used road base and sub base material thickness and quality is in
5
accordance with IFC drawing
Confirm that compaction test reports for all layers of road base and sub base material
6
is satisfactory.
7 Confirm that asphalt test reports are available satisfactory
8 Confirm that road markings and crash barriers are as per IFC drawing
installed
9 Construction debris is removed from the completed Road.
10 Confirm that all Quality Records have been completed and accepted
Remark :
Signature
Date
ITR-C-0303X
REGGANE NORD DEVELOPMENT PROJECT
Project document number:
SURFACE FACILITIES, ALGERIA
JI-2026-ITR-C-0303X
GENERAL INFORMATION
What is the approximate quantity (tons) of asphalt required
A.
for this project?
What is the approximate distance (in kilometers) from the
B.
proposed asphalt plant to the jobsite?
What is the approximate travel time (in minutes) of trucks
C.
transit time from the proposed batch plant to the jobsite?
D. Is the batch plant central mixing?
Is the Asphalt plant equipped with quality control
E.
laboratory?
F. Approximate completion date of the project.
I. GENERAL
1.1 Plant Type/ Model
1.2 Capacity (tons/batch,
tons/hour)
1.3 Plant Manager
1.4 QC Engineer
Page 1 of 4
ITR-C-0303X
REGGANE NORD DEVELOPMENT PROJECT
Project document number:
SURFACE FACILITIES, ALGERIA
JI-2026-ITR-C-0303X
III. PLANT SCALES CALIBRATION (Attach valid calibration certificates from approved
calibration agency.
Page 2 of 4
ITR-C-0303X
REGGANE NORD DEVELOPMENT PROJECT
Project document number:
SURFACE FACILITIES, ALGERIA
JI-2026-ITR-C-0303X
1
IX. CENTRAL MIXER
Mixer Type Capacity Condition of Drum Condition of Blades
Page 3 of 4
ITR-C-0303X
REGGANE NORD DEVELOPMENT PROJECT
Project document number:
SURFACE FACILITIES, ALGERIA
JI-2026-ITR-C-0303X
Based on actual plant inspection, It is confirmed that the subject asphalt batch plant
meets the requirements of project specification. In addition, perform the required
QA/QC tests in the batch plant during asphalt production and on-site during
placement, as per contract requirements.
---------------------------------
Print Name and Signature
( Petrofac QC in charge)
---------------------------------
Print Name and Signature
( COMPANY representative)
Page 4 of 4