MOHAMMED ABDUL QADEER ADIL

Senior Structural Engineer.

WORK EXPERIENCE
IMAAR LandWorx (JV) Trading & Contracting Co.W.LL Qatar (2019-2023).

Project (3) : Completed.


PROFILE SUMMARY CP10G1- Waterfront Residential & Pedestrian Access.
PROFESSIONALLY POSSESS 18 CP10H3 - Qetaifan Island Outer Promenade Simplified Landscape works.
YEARS OF EXPERIENCE IN QATAR. CP10B3A- Wadi Park Zone 3A.
CONTACT CP10E3A - Fox Hills Car Parking Works.
PHONE: 66962391 Client : Lusail Estate Development Company (W.L.L.).
Consultant : Parsons International Limited (PIL).
CURRENT RESIDENCE: QATAR.

EMAIL: Project (2): Completed.


Construction Packages 07-CA,C5 & C6, Landscape works Commercial Boulevard
mohd_qadeeradil@yahoo.co.in
RoadA4, Linear Parks and Road A3 AND D3.
NOC & DRIVING LICENCE : Client : Lusail Real state Development Company.
● NOC - Available. Project Management Consultant (PMC) : Parsons international Limited.
● Driving License - Light Vehicle. Supervision Consultant : Dorsch Qatar.
Design Consultant : HOK London.
SOFTWARE SKILLS : Contractor : Al Jaber & Partners.
● PMP & Structural Design Course.
● Diploma Hardware & Software. Project (1) : Completed .
● Institute Leadership Management Public Ream Design North Residential (CP5A) & West Waterfront(CP6A), Lusail City Qatar.
(ILM). Property : Qatari Diar & Lusail Real Estate Development Co.
● AutoCAD. Client : Alijarah Property.
● MS office, Outlook, Aconex.
Consultant: Aecom.
PERSONAL DETAILS
RESPONSIBILITIES:
Name : M.A.Qadeer Adil.
• Responsible for the day-to-day Supervision structural works associated with
Date of Birth : 27-02-1985 over ground stations, Underground stations, Expo station, Architectural Works or
Nationality : Indian others as directed by Construction Director and in accordance with Project
Religion : Islam requirements in the General and Particular Specifications.
Languages : English, Arabic
• Monitoring Civil & structural work administration activities.

• Manage pre-construction planning activities, review and comment on the


Contractor’s construction schedules, method statements, and risk assessments for
the structural works.

• Participate in Prequalification review of proposed structural suppliers,


fabricators and attend factory visits as required during the approval consideration
process.

Page 1 of 6
• Ensure the Contractor’s proposed temporary works are sufficiently detailed and
checked by the Independent Checking Engineer to ensure the safe erection of the
permanent structural steel work.

• Administrating contract works, and assisting the Resident Engineer (RE) with
prompt exchange of correspondence, submittals, relating to all Structural work.

• Assigning and supervising & inspections on a daily basis so that all contractor
activities are adequately covered.

• Supervising and remaining vigilant regarding all aspects of the structural work
construction activities.

• Responding with appropriate, necessary levels of supervision to provide quality


assurance in accordance with contract documents.

• Assisting the RE and Project Controls Team in any issues from the contractor
regarding claims, etc.

• Reviewing the contractor’s progress at all times. Oversee the recording and
regular updating of the progress of the works. Records are available to indicate
the progress of the works at all stages of the contract.

• Monitoring the material incorporated in the work, the materials stored at the site,
and the contractor’s manpower and equipment.

• Attending weekly, monthly, and other progress & technical meetings held at the
site as required by the Resident Engineer/Construction Director. Identifying
constraints and recommending corrective measures.

• Reviewing inspector’s daily reports and generally overseeing the inspector’s


daily activities including works assignments, on-site performance, and
supervising the contractor’s operations.

• Coordinating with contractor’s supervisory personnel regarding schedule,


sequence, and method of work.

• Maintenance of the filing system to record all inspection reports. Ensure the
assigned inspectors file all RFI’s (Requests for Inspection) and other
correspondence relating to any inspection of the works at the end of each working
day.

• Schedule the duties of the inspectors to avoid any undue delay to the
Contractors work on site. Inform the Contractor of any instances of
noncompliance work using standard QA protocols.

• Work with the Safety Engineer to monitor the Contractors safety arrangements
and respond promptly to any safety concerns raised by the Safety Engineer.

• Assist the RE in reviewing materials submittals, shop drawings, method


statements, as-built drawings, manuals, etc. related to the structural steel works
and ensures that the submittals are responded to in a timely manner.

• Review and timely response to materials submittals, shop drawings, method


statements, as built drawings, manuals, etc.

Page 2 of 6
• Oversee and maintain the tracking and filing of all quality records during the
construction supervision phase, as per the Quality Management System.

• Prepare daily progress reports are filed for future reference and readily available
in records.

INTERPERSONAL SKILLS
 Flourish in a team work, environment also work independently.
 Empathic listener and persuasive speaker.
 Can be counted on to achieve results in emergency situations.
 Displays a strong personal commitment to successfully
completing of all projects.
 Demonstrate effective delegation techniques.
 Control the quality of the most crucial variables contributing to
the realization of departmental goals and objectives.
 Solid understanding of industry and regulatory standards.

AL Ryum Group of Companies, Doha-Qatar (2014- 2019).


Project : Crescent Park(CP10E2)Development Lusail City, Qatar.
Contract Value : 400 Million.
Client : Lusail Real Estate Development Co.
Project Management : Parsons.
Consultant : Dorsch.

Samsung C&T Engineering and Construction Co.W.LL, Qatar (2013-2014).


Client : Qatari Diar.
Project : Lusail Development CP5B Project Doha-Qatar.
Lusail Development Light Rail Transit System, Under Pass A1 Road,
Tunnels & Utilities.

Qatari Diar Vinci Construction (QDVC), Qatar (2010-2013).


Client : Qatari Diar.
Consultant : Parsons.
Project : Lusail Development Light Rail Transit System.
Lusail Development Light Rail Transit System on the basis of a design and
build contract the project is part of the overall Lusail Project being
developed by Qatari Diar to create a new city of 200,000 people on 35
square kilometres of land to the north of Doha-Qatar.

The Lusail LRT comprises the following works:

 4 tramway operating lines.


 17.8km of double track at grade.
 8.2km of single track at grade.
 6.6km of underground double track in cut and cover tunnel.
 22 stations at grade.
 7 underground stations:
 1 viaduct crossing over the North Road and the regional railway
including an elevated interconnection station.
 1 depot, maintenance / storage facility and test track.
 30 tramway vehicles utilizing catenary free technology.
 1 Pearl Station (PEA01) excavation & earth works.
Page 3 of 6
STRABAG & ZUBLIN International Construction W.L.L, Doha (2006-2009).
Client : AL-Misnad.
Consultant : Al-Manna & Partners.
Project : Residential B1, 2, G+44 Floors West Bay Tower, Qatar.

Building Projects at Pearl GTL, Ras-laffan Industrial City, Qatar.


Client : Qatar Gas, Pearl GTL, Ras-Laffan.
Project : G+1 Shell (KBR/JCC/STRABAG).
Project Cost: QAR 332 Million.

 Construction of HVAC Building


 Main Electrical Substation Buildings.
 Construction of Central Control Building
 Construction of Ware house & Work shop building.
 Construction of Plant office Building.
 Construction of Prayer Building.
 Construction of Staff, labours accommodations, materials storage &
stocking laydowns Areas.

Projects Completed for Residential Villas, Buildings (Package 1, 2) Maiseed, Qatar.


Client : Qatar Petroleum (Q.P).
Project : G+1 &2 Residential Villas & Buildings.

 Construction of Villas & Swimming Pools.


 Construction of Car Parking Area.
 Construction of Mechanical building.
 Construction of Electrical building.
 Construction of Main Security building.
 Construction of Prayer Building, Store Rooms.
 Construction of Guess Hall & Rooms.

Page 4 of 6
Academic Additional Trainings & Courses :

B.Tech (Civil Engineering) JNTU, India.

 Diploma in Computer Application & Multi-lingual DTP, India

 Diploma in Computer Hardware, India.

 Certificate In Auto-Cad 2D & 3D commands from AL-Tech Universal


Solutions, India

 Supervisors Leadership training from Institute of Leadership &


management (ILM) Pearl village training center–Raslaffan industrial
city, Qatar.

 ORCHESTRA TRAINING SITE PREPARATION &


SCHEDULING (LARGE STRUCTURE BUILDING) QDVC, Qatar.

 Basic Scaffolding Safety Inspector Awareness Course from TUV SUD


Middle East L.L.C, Qatar.

 Incident & Injury-free Safety from JMJ Associates, Qatar.

 Temporary work Inspector trainings from Qatari Diar Vinci


Construction (QDVC) Qatar.

 Advance Auto-cad 3D viewer from Qatari Diar Vinci Construction


(QDVC) Qatar.

 Advanced Lifting Supervisor Training Course From UAQ Training


Centre, Qatar.

 CPR, BLS & First Aid for Adults Training Course, From UAQ Training
Centre, Qatar.

 Appreciation 2 Million Safe Man Hours Without Lost Time Incident


(LTI) from Alryum, Qatar.

 Safety Supervisor Training Course from UAQ Training & Consultancy


Qatar.

 Permit to Work (Responsible Person) Training Course from Vibrant


Consultancy WLL, Qatar.

Page 5 of 6
TRAINING AT PEARL GAS TO OIL PROJ ECT (SHELL, KBR/JCC)
ILM (International Leadership Management) from STRABAG W.L.L, Qatar.

(1) Introduction to HSE & Leadership.

(2) Incident, injury free & Supervision.

(3) Practical Leadership & Communication Skills.

(4) Cultural awareness & Flawless startup.

(5) Permit to Work.

(6) Quality control.

(7) Life Critical Activity & Hot work,

(8) Confined Space,

(9) Hot Work & TSTI.

(10) Planning & Organizing.