GROUND FLOOR
No. Item description Quantity Unit Unit rate (taka) Cost (taka)
1 COLUMN
Concrete
MS rod
2 BEAM
Concrete
MS rod
3 SLAB
Concrete
MS rod
5 PLASTER
MS rod
7 TILES
Floor
cement 136 bag 510 69360
Toilet(wall)
Kitchen(wall)
8 D00R
9 GRILL
10 THAI
11 STAIR
Concrete
MS rod
10mm 80 kg 95 7600
13 PAINT
Concrete
MS rod
ELEC.
18 5% 299076.55
WORK
TOTAL= 6280607.55