1st floor
1st floor
PROPOSED BUILDING ON DAG NO-C.S & S.A-1082, R.S-786, DHAKA CITY JARIP-4401, KHATIAN NO-
5-208, S.A-290, R.S-68, DHAKA CITY JARIP-3298, J.L NO-C.S-318, S.A-143, R.S-13, DHAKA CITY JARIP-6,
MOUZA- DAKHINGAON, KUSHUMBAGH, SABUJBAGH, DHAKA-1214
No. Item description Quantity Unit Unit rate (taka) Cost (taka)
1 COLUMN
Concrete
MS rod
2 BEAM
Concrete
MS rod
3 SLAB
Concrete
MS rod
4 BRICK WORK
5 PLASTER
MS rod
8mm 80 kg 90 7200
7 TILES
Floor
Toilet(wall)
Kitchen(wall)
8 D00R
10 GRILL
11 THAI
12 STAIR
Concrete
MS rod
10mm 80 kg 95 7600
SANITARY WORK
13 PAINT
Celling paint 5244 sft 9 47196
ELEC.
14 5% 407672.4
WORK
TOTAL= 8561120.4