PROPOSED BUILDING ON DAG NO-C.S & S.A-1082, R.S-786, DHAKA CITY
JARIP-4401, KHATIAN NO- 5-208, S.A-290, R.S-68, DHAKA CITY JARIP-3298, J.L
NO-C.S-318, S.A-143, R.S-13, DHAKA CITY JARIP-6, MOUZA- DAKHINGAON,
KUSHUMBAGH, SABUJBAGH, DHAKA-1214

No. Item description Quantity Unit Unit rate Cost (taka)


(taka)
1 COLUMN
Concrete
cement 177 bag 510 97350
sand 362 cft 65 23530
stone 724 cft 240 173760
MS rod
20mm 3000 kg 95 270000
12mm 150 kg 95 13500
10mm 15000 kg 95 1350000
2 BEAM
Concrete
cement 184 bag 510 101200
sand 377 cft 65 24505
stone 754 cft 240 180960
MS rod
20mm 3500 kg 90 315000
16mm 1500 kg 90 135000
10mm 1500 kg 90 135000
3 SLAB
Concrete
cement 402 bag 510 221100
sand 1005 cft 65 65325
Khoa 2010 cft 120 241200
MS rod
12mm 1000 kg 95 90000
10mm 5000 kg 95 450000
4 BRICK WORK
cement 510 bag 510 264000
sand 2080 cft 25 52000
Brick 72000 pic 12 864000
No. Item description Quantity Unit Unit rate
(taka)
5 PLASTER
cement 420 bag 510 231000
sand 840 cft 25 21000
6 LINTEL &
FALSE SLAB
cement 70 bag 510 38500
sand 150 cft 25 3750
Khoa 300 cft 140 42000
MS rod
10mm 120 kg 90 10800
8mm 80 kg 90 7200
7 TILES
Floor
tiles 5244 sft 140 734160
cement 104 bag 550 57200
sand 200 cft 25 5000
Toilet(wall)
tiles 1968 sft 80 157440
cement 40 bag 510 22000
sand 80 cft 25 2000
Kitchen(wall)
tiles 790 sft 80 63200
cement 16 bag 510 8800
sand 50 cft 25 1250
8 D00R
Front door frame 4 pic 12000 48000
Room door frame 12 pic 4000 48000
Front door shutter 4 pic 20000 80000
Room door shutter 4 pic 7000 28000
PLASTIC door 20 pic 4500 90000
10 GRILL
Window grill 560 sft 180 100800
Toilet grill 18 sft 180 3240
Ver.grill 560 sft 330 184800
Stair railing 1 L.S. 12000 12000
11 THAI
Window thai 320 sft 350 112000
Toilet thai 20 sft 350 7000
Ver.sliding 700 sft 350 245000

No. Item description Quantity Unit Unit rate Cost (taka)


(taka)
12 STAIR
Concrete
cement 16 bag 510 8800
sand 45 cft 65 2925
stone 90 cft 240 21600
MS rod 0
10mm 80 kg 95 7200
12mm 300 kg 95 27000
0
SANITARY 0
WORK
Toilet 12 pic 12000 144000
Kitchen 4 pic 6000 24000
13 PAINT 0
Celling paint 5244 sft 9 47196
Wall paint 17192 sft 11 189112
Window&ver 1300 sft 15 19500
Door 450 sft 250 112500
Out-side paint 3960 sft 12 47520
16 LABOR CAST 5244 sft 205 1127460
Sub total: 9210383

14 ELEC. WORK 5% 460519.15

TOTAL 9670902.2