1 PRELIMINARIES
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
Bill No. 1
PRELIMINARIES
D NA
E
NA Item
J
The Contractor shall allow for all other obligations in
accordance with the contract not listed under this
section of Non-recurring Preliminary Costs at the
Commencement of the Works. The Contractor shall
detail below any such obligations together with the
Contract volume, section and clause reference as
applicable Item
To Collection QR
Recurring Preliminary Costs Incurred During the
Execution of the Works
A
Maintenance of Employer's Representative and
Engineer's site staff office, and all other facilities and
services including all fixtures, furniture and equipments Item
K
The Contractor shall allow for all other obligations in
accordance with the Contract not listed under this
section of Recurring Preliminary Costs During the
Progress of the Works. The Contractor shall detail
below any such obligations together with the Contract
volume, section and clause reference as applicable Item
To Collection QR
Non-Recurring Preliminary Costs (Demobilization)
Incurred at the Completion of the Works
D
Provision of all required as built drawings, operating
manuals, procedures, information and any other
documentation required in accordance with the Contract
to be handed over to the Employer's Representative Item
G
The Contractor shall allow for all other obligations in
accordance with the Contract not listed under this
section of Non-Recurring Preliminary Costs on
Completion of the Works. The Contractor shall detail
below any such obligations together with the Contract
clause reference as applicable Item
To Collection QR
PRELIMINARIES
QUANTITIES
TOTAL PRICE
(QR)
Bill No. 2 SITE WORKS
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
ITEM UNIT RATE
ITEM DESCRIPTION QUANTITY UNIT
REF. (QR)
Bill No. 2
SITE WORKS
SITE PREPARATION
A Allow for clearing the site of all rubbish and debris to the
satisfaction of the Engineer 1 Item
B
Anti-termite application complete as per specifications 1 Item
Note:
1. Excavation is measured NET without allowance to
working space, Contractor should allow the same on his
rate.
2. Contractor to visit site to determine actual scope of
works of this section.
To Collection QR
RKS
S
TOTAL PRICE
(QR)
Bill No. 3 CONCRETE
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
Bill No. 3
CONCRETE
PART A - VILLA
A footing
B column
C wall
SUNDRIES
K
Allow for structural joints as required
To Collection QR
TE
TOTAL PRICE
(QR)
Bill No. 4 MASONRY
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
Bill No. 4
MASONRY
MASONRY BLOCK
B 200 mm thick
C 150 mm thick
D 100 mm thick
F 200 mm thick
G 150 mm thick
H 100 mm thick
To Collection
M
A
M
A
M
A
B
C
C
D
D
To Collection QR
Bill No. 4
COLLECTION
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Carried To Summary QR
Y
TOTAL PRICE
(QR)
A
Bill No. 6 WOOD AND PLASTIC
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
Bill No. 6
KITCHEN CABINETS
Kitchen
CABINETS
To Collection QR
WARDROBE
TOTAL PRICE
(QR)
THERMAL & MOISTURE
Bill No. 7
VILLA RENOVATION - AL KHOR PROTECTION
BILL OF QUANTITIES
Bill No. 7
E thermal insulation
F vapor barrier
G vapor barrier
To Collection QR
To Collection QR
PART E - TOWNHOUSE
WATERPROOFING
To Collection QR
WATERPROOFING
G vapor barrier 77 m
To Collection QR
WATERPROOFING
WATERPROOFING
E thermal insulation 46 m2
F vapor barrier 46 m2
G vapor barrier 28 m
To Collection QR
WATERPROOFING
A __________________________________________
B __________________________________________
C __________________________________________
D __________________________________________
To Collection QR
Bill No. 7
COLLECTION
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Carried To Summary QR
L & MOISTURE
TION
S
TOTAL PRICE
(QR)
TH 3.4 0.3 2.04 10
Bill No. 8
DOORS
A Door Type D1
B Door Type D2
C Door Type D3
D Door Type D4
IRONMONGERY
ironmongery to doors
To Collection QR
WINDOWS
glazed windows
A Type AW01
B Type AW02
C Type AW03
D Type AW04
E Type AW05
F Type AW06
G Type AW07
H Type AW08
To Collection QR
& WINDOWS
S
TOTAL PRICE
(QR)
Bill No. 9 FINISHES
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
Bill No. 9
FINISHES
GENERAL
A
plaster to external walls&Internal walls to receive paint
PLASTER
to floors
B ceramic tiles
to walls
PAINTING
Paint on plaster
H
to external walls, to walls with groove, rendered plaster
J to internal walls
K to ceilings
To Collection QR
S
TOTAL PRICE
(QR)
BILL NO. 15B PLUMBING
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
UNIT
ITEM
ITEM DESCRIPTION QUANTITY UNIT RATE
REF.
(QR)
PLUMBING
N Fixing all the Bathroom & Kitchen fittings with necessary LOT
accessories
D
Carried To Mechanical Installations Collection QR
PLUMBING
QUANTITIES
TOTAL PRICE
(QR)
56,450.00
Bill No. 15C DRAINAGE INSTALLATION
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
UNIT
ITEM
ITEM DESCRIPTION QUANTITY UNIT RATE
REF.
(QR)
DRAINAGE INSTALLATION
C 50 mm Ø LOT M
D 75 mm Ø LOT M
E 110 mm Ø LOT M
F 150 mm Ø LOT M
G 50 mm Ø LOT M
H 50mm Ø LOT NR
Roof vent caps installed complete as specified and drawn
I 50mm Ø LOT NR
J 75mm Ø LOT NR
K 110mm Ø LOT NR
L 75 mm Ø LOT NR
M 110 mm Ø LOT NR
QUANTITIES
TOTAL PRICE
(QR)
32,650.00
BILL NO. 15D FIRE FIGHTING
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
ITEM UNIT RATE
ITEM DESCRIPTION QUANTITY UNIT
REF. (QR)
FIRE FIGHTING
CARRIED TO COLLECTION
FIRE FIGHTING
QUANTITIES
TOTAL PRICE
(QR)
950.00
Bill No. 16 ELECTRICAL INSTALLATIONS
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
Bill No. 16
ELECTRICAL INSTALLATIONS
POWER
Power Outlets
Switches
QR
Carried To Summary
QR
RICAL INSTALLATIONS
QUANTITIES
TOTAL PRICE
(QR)
97,500.00
Bill No. 17C NETWORKING & CCTV
VILLA RENOVATION - AL KHOR
BILL OF QUANTITIES
1 camera
2 Storage
4K HDCVI DVR
DVR 16 Channel Penta-brid Recorder
Support for 16 Channels
Smart H.265+ and Smart H.264+ Dual Codec
4K at 7 fps Recording Resolution on all HDCVI
Channels P2P 1 Item
Automatically Detects HDCVI, AHD, TVI, and CVBS
Inputs
64 Mbps Incoming Bandwidthwith 4 TB HD
3 Monitor
4 workstation
To Collection QR
MOI drawing preparation and approval LS
To Collection QR
CONTRACTOR'S ADJUSTMENT
Carried To Summary QR
TWORKING & CCTV
UANTITIES
TOTAL PRICE
(QR)
22,500.00
AL KHOR VILLA
SUMMARY
BILL NO. DESCRIPTION AMOUNT
Bill No. 1 PRELIMINARIES 7000.00 QAR
Bill No. 2 SITE WORKS 12500.00 QAR
Amount in Words:
(Carried to Form of Six hundred fourty seven thousand five hundred and fifty Qatari Riyals
Tender)