Design and Project Management

Engineering Co. (DPME)

Drawing Review Form


HV-F-05/E
(Design Plan Drawing)
Project Name: ……………………………………………………………………….….. Project No. : ……….

Location: …………………………………………….…. Date: …/… / ……..

Document to be reviewed  Drawings  Document

 Frame & Panda  Frame size & Scale


 Project Name
 Owner; Names, addresses & Logos
 Consultant; Names, addresses & Logos
 Contractor; Names, addresses & Logos
 Team Work Names
 Dates
 Sheet number & number of sheet
 Drawings title
 Text height
 Dimension style & text height
 Key plan matching with the drawings
 Revision and table of revision
 Text style and text conflicting
Coincident with design
 Inside Drawing  Data in Drawing 
criteria
 True
 Satisfactory
 Congregated
 Clear project data
 Logic data
 Architecture  Axis
 Opening and shafts
 M/C rooms dimensions
 M/C rooms Accessibility
 False ceiling height
 False ceiling pattern
 Structure  Opening and shafts
 Columns distribution
 Beams heights
Equipment Maintenance
 
distribution considerations
 Capacity
 ID compatibility
 Access doors
 Handling

U46//conversion/tmp/activity_task_scratch/770611424.doc Page 1 of 4
Design and Project Management
Engineering Co. (DPME)

Drawing Review Form


HV-F-05/E
(Design Plan Drawing)
Project Name: ……………………………………………………………………….….. Project No. : ……….

Location: …………………………………………….…. Date: …/… / ……..

Document to be reviewed  Drawings  Document

 Heights
 Tag number
 Hook-up in/out
Equipment steel or

concrete basis
 Basis dimensions & height
 Type of machine  Chillers  Type
 Capacity
 Matching
 Pumps  Type
 Capacity
 Matching
Cooling
  Type
Tower
 Capacity
 Matching
 Split unit  Type
 Capacity
 Matching
 AHU  Type
 Capacity
 Matching
 FCU  Type
 Capacity
 Matching
Exp.
  Type
Tank
 Capacity
 Matching
Chem.
  Type
Unit
 Capacity
 Matching
 Fans  Type
 Capacity
 Matching

U46//conversion/tmp/activity_task_scratch/770611424.doc Page 2 of 4
Design and Project Management
Engineering Co. (DPME)

Drawing Review Form


HV-F-05/E
(Design Plan Drawing)
Project Name: ……………………………………………………………………….….. Project No. : ……….

Location: …………………………………………….…. Date: …/… / ……..

Document to be reviewed  Drawings  Document

 Valves  Type
 Matching
 Insulation  Type
 Matching
 Outlets  Type
 Matching
 Control  Type
 Matching
 Electrical  Type
 Matching
 Duct routing  Design main velocities
 Design friction rate
 Duct sizes
Duct height matching with

false ceiling height
 Duct logic routing
Elbows, splitters and take-

off direction
 Volume & fire dampers
 Reducers lengths
 Take-off height
 internal insulation
 External insulation
 Supports spans
 Construction manners
 Plenum boxes dimensions
Plenum boxes internal

insulation
Chilled water
  Design main velocities
piping routing
 Design friction rate
 Pipe size
Piping sizes matching with

false ceiling height
 Piping logic routing
 Elbows and tees direction
 Take-off height
 Insulation

U46//conversion/tmp/activity_task_scratch/770611424.doc Page 3 of 4
Design and Project Management
Engineering Co. (DPME)

Drawing Review Form


HV-F-05/E
(Design Plan Drawing)
Project Name: ……………………………………………………………………….….. Project No. : ……….

Location: …………………………………………….…. Date: …/… / ……..

Document to be reviewed  Drawings  Document

 Supports spans
 Construction manners
 Valves on all branches
 Measurement devices
 Air outlets  Outlets sizes
 Face velocity
 Distribution
Matched with false ceiling

and ID
 Quantities & numbers
 Text on drawing
Coordinated with other

disciplines

Reviewer Comments:
………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………….
………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………
………..
………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………

Drawing Review Evaluation  Very Good  Good  Fair


Design Review Evaluation  Very Good  Good  Fair
Review Start Date … / … / …….. Review End Date … / … / ……..
Reviewer ……………………………… Signature …………………………….