Quotation Date : 03-Jul-2024

Quotation Num : SMY-QO-22121788


Quotation For : Manual Excavation & Backfilling.

Company Name : China Railway Construction Corporation Limited Saudi Branch


Company Address : 3508 Prince Abdullah Bin Saud Bin Abdullah Snatan Street, As Sahafah, Riyadh 13321,KSA

QUANTITY UNIT PRICE SUBTOTAL PRICE


S/N Item Description Remarks
Cubic Meter (SAR/CUM) (SAR)

Cutting & Removal of existing Asphalt.


1 290.00 LM 285.00 82,650.00

Manual Excavation including disposal of


2 290.00 Cm3 360.00 104,400.00
excavated material.

-
In-Total: 187,050.00

Notes:
1- Above mentioned price is exclusive of V.A.T
2- Payment shall be based on actual quantification, duly measured / verified / agreed by SUBCONTRACTOR and Contractor.
3- Duly measurement & Verification of actual Quantity shall be carried out on daily basis & will be considered as final quantity to be
billed
4- WPR shall be provided by Contractor.
5- Any backfilling required because of any change order by Contractor will be Charged Extra.
6-Invoice shall be submitted to Contractor on daily basis & Payment to subcontractor should be done within 20 days after the
submission of undisputed invoice.
7- All incidental works necessary for completion of work shall be carried out by the Subcontractor at no extra cost.
8- Contractor will be responsible for providing work location access of subcontractor Manpower & vehicles or Equipments required at
work location.
9- The amount inserted in the BOQ will be used to value any variation of the works, whether omissions or additions.

Signature & Stamp