Professional Documents
Culture Documents
ANNEX R - Responsibility Matrix Optimisation_Sudan_Final
ANNEX R - Responsibility Matrix Optimisation_Sudan_Final
Transmission Optimization
Radio Optimization
ANNEX R
Page 1 of 3
Supplier
Item Description Customer Comments
Company
LAC/RAC Boundary Audit and Paging Statistics
27 I R
Analysis.
28 Frequency re-farming R R
29 Frequency Optimization I R
30 Wi-Fi Optimization ( Frequency/KPI) I R
31 Customer Complaints Handling. I R
32 Generate daily, weekly and monthly radio KPIs reports. I R
33 Activity Log (all network changes) I R
34 Request/ Motivate Allocation of Mobile BTS's (CoW's) A R
Site Prioritization & Management (i.e. VIP, High Priority,
35 R R Quarterly
etc)
Special Optimization due to network /marketing events
36 S R
or Promotion.
First Node and any major new
New Feature Implementation (excluding first node feature upgrade implementation
37 A R
implementations and major new feature upgrade) shall be undertaken by
respective vendor.
38 New sites Optimization, post PAC I R
New frequency assignment will
be done by joint team from
39 New site/Expansion frequency assignment S R
Supplier Company MS and
Customer planning department
40 2G Frequency re-planning I R Yearly
41 Site Audits R Yearly
SIM card with enough credit for drive test (routine &
42 benchmarking) provision. Supplier Company to ensure R I
appropriate usage of SIM cards.
43 External Interference clearance R S
Radio Performance Acceptance after Vender to Vender
44 I R
Swap, Validating KPIs & DT
45 3G SC Audit & re-planning I R Bi-yearly
Core Optimization
Provide inputs about Core Network elements in the
46 R I
network
Review current Capacity limits and Bottlenecks for the
47 I R
core network and suggest recommendations
Focus on the following KPI's and others not stated in the
network:
• 2G & 3G Paging Success Rate.
• Inter MSC Incoming/Outgoing HO Success Rate.
• Location Update Success Rate.
• Signaling load (NSL/HSL/SIGTRAN)
48 • TDM/IP/ATM Termination Success Rate. I R
• Monitoring the Network Transponders Capacities &
performance
• 2G & 3G IP throughput (including End-2-End).
• 2G & 3G IP Latency
• 2G & 3G Attached Success Rate
• 2G & 3G PDP Context Activation Success Rate.
49 Review recommendations from Venders R S
50 Implement agreed on Recommendations S R
51 Wi-Fi core monitoring & Optimization ( Routes and KPIs) I R
ANNEX R
Page 2 of 3
Supplier
Item Description Customer Comments
Company
Capacity Management
As per Customer standard
52 Monitor and report system capacity and grade of service R
procedure
Monitoring of performance and
capacity trends through weekly,
monthly and ad hoc reports and
notification to the Customer in
advance of required capacity
53 Propose capacity enhancements R increases as per headroom
below:
• Core hardware: 6 month
• Core software: 3 month
• BSS: 3 month
• Transport: 6 months
Other
54 Monitoring End-to-End KPI's I R
Parameter Checking E2E (RAN, RAN Core, Core
55 I R Bi-yearly
(CS&PS), IP, Optical, Microwave, Infrastructure, etc)
Network health check (RAN, RAN Core, Core (CS&PS),
56 I R Bi-yearly
IP, Optical, Microwave, Infrastructure, etc)
Network Documentation E2E ~ Network designs,
57 topologies, etc (RAN, RAN Core, Core (CS&PS), IP, I R Bi-yearly
Optical, Microwave, Infrastructure, etc)
End-to-End Network Audits (RAN, RAN Core, Core
58 I R Bi-yearly
(CS&PS), IP, Optical, Microwave, Infrastructure, etc)
59 End-to-End Service Resiliency/Redundancy Testing I R Quarterly
R Responsibility
A Approval
S Support
I Information
ANNEX R
Page 3 of 3