BBS Raft Foundation
BBS Raft Foundation
Shop Drawings
BOTTOM BAR
8.5" 8.5"
1 B1 #4 1 6" 52 52 30.17 1,568.84 28'-9"
8.5" 8.5"
2 B2 #4 1 6" 52 52 30.17 1,568.84 28'-9"
8"
3 Extra bar #4 1 6" 208 208 9.17 1,907.36 8'-6"
TOP BAR
8.5" 8.5"
1 T1 #4 1 8" 40 40 30.17 1,206.80 28'-9"
8.5" 8.5"
2 T2 #4 1 8" 40 40 30.17 1,206.80 28'-9"
8"
3 Extra bar #4 1 8" 160 160 9.170 1,467.20 8'-6"
Page 4 of 40
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member
17'-9" 13"
1 Bar Mark 1 #8 4 4 16 19.920 318.72 13"
12"
Stirrup
5 #4@4" c/c at #4 8 4" 17 136 5.00 680.00 3" 15"
(L/4)
Page 5 of 40
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member
3'-7.5"
Bar Mark 4
8 #8 4 2 8 4.625 37.00
9"
@ support 13"
6'-0"
Bar Mark 4
9 #8 2 2 4 6.00 24.00
@ Mid span
12"
Stirrup
10 #3@4" c/c at #3 4 4" 11 44 5.00 220.00 3" 15"
(L/4)
12"
Page 6 of 40
N (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Project Implementation Unit
o
. Contract Package KA-1
o
Rehabilitating Water Supply and Sewerage in Soba Nagar
f
Water Storage Tanks
B
a
Bar Bending Schedule of UGWT Walls
r
s
Nos of Bar i
Sr. No. Location Bar Size Member C/C n Total Nos of Bars Cut Length of each Bar (ft.) Bar Shape
e
Walls of UGWT a
c
h
m
Main Bars e 6'-6"
Walls #6 4 7" ###
m 336 7.50
b
e
r 12"
8"
Main Bars
Walls #4 4 7" ### 336 12.25 11'-7"
11'-7"
2'-1" 27''-4"
Distribution
Inner Face #4 4 5" ### 124 29.41
Distribution 2'-1"
Outer Face #4 4 5" ### 124 30.75 28''-8"
SUMMARY OF STEEL
Size of Bar #6 #4 #3 Total (kgs)
Unit Weight 0.681 0.302 0.171
Total Length #REF! #REF! #REF!
Weight (Kgs) #REF! #REF!
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
Water Storage Tanks
STEEL SUMMARY OF PLINTH BEAM (Pages 1 & 2)
Size of Bar #6
Unit Weight 0.681
Total Length #VALUE!
Weight (Kgs) #VALUE!
SUMMARY OF STEEL
Size of Bar #4
Unit Weight 0.302
Total Length 355.72
Weight (Kgs) 107.43
SUMMARY OF STEEL
Size of Bar #3
Unit Weight 0.170
Total Length #VALUE!
Weight (Kgs) #VALUE!
orporation (KW&SC)
Total (kgs)=
#VALUE!
Total (kgs)=
107.4300
Total (kgs)=
#VALUE!
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
Water Storage Tanks
Bar Bending Schedule of Slab at FFL (0'-0")
BOTTOM BAR
8.5" 8.5"
1 B1 #4 1 6" 52 52 30.17 1,568.84 28'-9"
8.5" 8.5"
2 B2 #4 1 6" 52 52 30.17 1,568.84 28'-9"
8"
3 Extra bar #4 1 6" 208 208 9.17 1,907.36 8'-6"
TOP BAR
8.5" 8.5"
1 T1 #4 1 8" 40 40 30.17 1,206.80 28'-9"
8.5" 8.5"
2 T2 #4 1 8" 40 40 30.17 1,206.80 28'-9"
8"
3 Extra bar #4 1 8" 160 160 9.170 1,467.20 8'-6"
Page 34 of 40
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
Water Storage Tanks
Bar Bending Schedule of Plinth beam 1 ( 0.00)
Bottom
PB1 #6 4 4 16 30.25 484.00
bar 9"
Top
extra bar
at
PB1 #6 12 2 24 3.25 78.00
Support
(C2) at
L/3
Top
extra bar
PB1 at Mid #6 8 2 16 6.17 98.72
Support
(P1)
Top
extra bar
PB1 at Mid #6 4 2 8 5.00 40.00
Support
(C1)
Stirrup
at
PB1 Support #3 4 4" 36 144 4.00 576.00
#3@4"
c/c
Stirrup at
Mid
PB1 #3 4 6" 18 72 4.00 288.00
#3@6"
c/c
PB1 (1'x1'-3") on C1 B-C/1-3 & 2/A-B (2 NOS)
Bottom
PB1 #6 2 4 8 30.25 242.00
bar
9"
Top
extra bar
PB1 at #6 4 2 8 3.25 26.00
Support
(C2)
Top
extra bar
PB1 at Mid #6 4 2 8 5.17 41.36
Support
(L/R C1)
Top
extra bar
at Mid
PB1 #6 2 2 4 6.00 24.00
Support
(Centre
C1)
Stirrup
at
PB1 Support #3 2 4 36 72 4.000 288.00
#3@4"
c/c
Stirrup
at Mid
PB1 #3 2 4 22 44 4.000 176.00
#3@6"
c/c
rage Corporation (KW&SC)
a Nagar
0.00)
Bar Shape
28'-9"
4"
4"
2'-6"
9"
6'-2"
5'
9"
3" 12"
9"
3" 12"
9" 9"
28'-9"
28'-9"
4"
4"
2'-6"
9"
9"
5'2"
6'
9"
3" 12"
9"
3" 12"