Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)

Contract Package KA-1


Rehabilitating Water Supply and Sewerage in Soba Nagar
Bar Bending Schedule of Raft Foundation

Ref construction drawings

Shop Drawings

Sr# DESCRIPTION STEEL IN KG

SUMMARY FOR STEEL

1 Total Bar # 3 in Kg………………………………………………………………………………………………………… -

2 Total Bar # 4 in Kg…………………………………………………………………………………………………………

3 Total Bar # 5 in Kg…………………………………………………………………………………………………………… -

4 Total Bar # 6 in Kg …………………………………………………………………………………………………………

5 Total Bar # 8 in Kg ………………………………………………………………………………………………………… -

TOTAL STEEL (IN KG) -

SUBMITTED BY: HSAB APPROVED BY: NESPAK

NAME: …………………………………………. NAME: .…………………………………………………..

SIGNATURE: ……………………………….. SIGNATURE: ……………………………………………


DATE: ………………………………………… DATE: ……………………………………………………..
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
Water Storage Tanks
Bar Bending Schedule of Raft Foundation

No. of Bars Total


Location Bar Nos of Bar Total Nos Cut Length
Sr. No. in each Bar Length Bar Shape
Top/Bottom Size Member C/C of Bars of each
member (ft.) (ft.)

Raft Foundation

1'-8" 1'-8"
1 B1 #6 1 6" 70 70 38.00 2,660.00 34'-8"

1'-7" 1'-7"
2 B2 #6 1 6" 70 70 37.83 2,648.10 34''-8"

1'-8" 1'-8"
3 T2 #6 1 8" 53 53 38.00 2,014.00 34'-8"

1'-7" 1'-7"
4 T1 #6 1 8" 53 53 37.83 2,004.99 34'-8"

3'-9"
5 M1 #6 1 0 4 4 38.42 153.68 34'-8"

3'-9"
6 M2 #6 1 0 4 4 38.42 153.68 34'-8"

SUMMARY OF STEEL

Size of Bar #6 Total (kgs)=

Unit Weight 0.681

Total Length 9,634.45 6,561.06

Weight (Kgs) 6,561.06

Page 3 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar

Water Storage Tanks


Bar Bending Schedule of Plinth beam 1 ( 0.00)

No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member

PB1 (1'x1'-3") on P1 GRID A-C/1-3 & 1,3/A-C (4 NOS)

PB1 Top bar #6 4 2 8 30.25 242.00 9" 28'-9" 9"

9" 28'-9" 9"


PB1 Bottom bar #6 4 4 16 30.25 484.00

PB1 Mid bar #4 4 2 8 29.42 235.36 28'-9"

4"

4"
2'-6"
Top extra bar
9"

PB1 at Support #6 12 2 24 3.25 78.00


(C2) at L/3

Top extra bar


PB1 at Mid #6 8 2 16 6.17 98.72 6'-2"
Support (P1)

Top extra bar


PB1 at Mid #6 4 2 8 5.00 40.00 5'
Support (C1)

9"
Stirrup at
PB1 Support #3 4 4" 36 144 4.00 576.00 3" 12"
#3@4" c/c

9"
Stirrup at
PB1 Mid #3 4 6" 18 72 4.00 288.00 3" 12"
#3@6" c/c

Page 4 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar

Water Storage Tanks


Bar Bending Schedule of Plinth beam 1 ( 0.00)

No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member

PB1 (1'x1'-3") on C1 B-C/1-3 & 2/A-B (2 NOS)

PB1 Top bar #6 2 2 4 30.25 121.00


9" 28'-9" 9"

PB1 Bottom bar #6 2 4 8 30.25 242.00


9" 9"

28'-9"

PB1 Mid bar #4 2 2 4 29.42 117.68 28'-9"

4"

4"
Top extra bar 2'-6"
PB1 at Support #6 4 2 8 3.25 26.00
9"

(C2)

Top extra bar 5'2"


at Mid
PB1 Support (L/R #6 4 2 8 5.17 41.36
C1)

Top extra bar


PB1 at Mid #6 2 2 4 6.00 24.00
Support 6'
(Centre C1)

9"
Stirrup at
PB1 Support #3 2 4 36 72 4.000 288.00 3" 12"
#3@4" c/c

9"
Stirrup at
PB1 Mid #3 2 4 22 44 4.000 176.00 3" 12"
#3@6" c/c

Page 5 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar

Water Storage Tanks


Bar Bending Schedule of Plinth beam 1 ( 0.00)

No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member

At Axis C/1-3

PB1 Top bar #6 1 2 2 30.17 60.34 9" 28'-8" 9"

9" 28'-8" 9"


PB1 Bottom bar #6 1 4 4 30.17 120.67

9" 9"
PB1 Mid bar #4 1 2 2 29.42 58.84
28'-8"

2'-9"
Top extra bar
9"

PB1 at Support #6 1 2 2 3.50 7.00


(C2)

6'-6"
Top extra bar
PB1 at Mid #6 2 1 2 6.500 13.00
support (P1)

Top extra bar 5'


at Mid #6 1 1 1 5.000 5.00
support (C1)

9"
Stirrup at
PB1 Support #3 1 4 36 36 4.000 144.00 3" 12"
#3@4" c/c

9"
Stirrup at
PB1 Support #3 1 4 22 22 4.000 88.00 3" 12"
#3@4" c/c

At Axis 1/A-C

Page 6 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar

Water Storage Tanks


Bar Bending Schedule of Plinth beam 1 ( 0.00)

No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member

28'-8"

PB1 Top Bar #6 1 2 2 30.17 60.34 9" 9"

9" 28'-8" 9"


PB1 Bottom bar #6 1 4 4 30.17 120.67

2'-9"
Top extra bar

9"
PB1 at Support #6 2 1 2 3.500 7.00
(C2)

Top extra bar


PB1 at Mid #6 2 1 2 6.180 12.36 6'-2"
Support (P1)

Top extra bar 5'


PB1 at Mid #6 1 1 1 5.00 5.00
Support (C1)

27'-9"
PB1 Mid Bar #4 1 2 2 28.42 56.84
4"

4"

9"
Stirrup at
PB1 Support #3 1 4 36 36 4.000 144.00 3" 12"
#3@4" c/c

9"

3" 12"
Stirrup at
PB1 Support #3 1 4 22 22 4.000 88.00
#3@4" c/c

At Axis 2/A-C

Page 7 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar

Water Storage Tanks


Bar Bending Schedule of Plinth beam 1 ( 0.00)

No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member

PB1 Top bar #6 1 2 2 30.17 60.34 9" 28'-8" 9"

9" 28'-8" 9"


PB1 Bottom bar #6 1 4 4 30.17 120.67

PB1 Mid bar #4 1 2 2 29.42 58.84 28'-9"

4"

4"
2'-42"
Top extra bar
9"

PB1 at Support #6 2 1 2 3.17 6.34


(C2)

Page 8 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)

Contract Package KA-1


Rehabilitating Water Supply and Sewerage in Soba Nagar
Water Storage Tanks

Bar Bending Schedule of UGWT Walls

No. of
Nos of Bar Bars in Total Cut Length Total Length
Sr. No. Location Bar Size Member C/C each Nos of of each Bar (ft.) Bar Shape
Bars (ft.)
member

Walls of UGWT

Main Bars 6'-6"


Walls #6 4 7" 84 336 7.50 2,520.00

12"

8"
Main Bars
Walls #4 4 7" 84 336 12.25 4,116.00 11'-7"

2'-1" 27''-4"
Distribution
Inner Face #4 4 5" 31 124 29.41 3,646.84

Distribution 2'-1"
Outer Face #4 4 5" 31 124 30.75 3,813.00 28''-8"

SUMMARY OF STEEL
Size of Bar #6 #4 Total (kgs)
Unit Weight 0.681 0.302
Total Length 2,520.00 11,575.84 5,212.02
Weight (Kgs) 1,716.12 3,495.90
30167.8
Bar Dia Wt (lbs/ft) Wt (kg/ft)
#3 0.376 0.171
#4 0.668 0.303
#5 1.043 0.473
#6 1.502 0.681
#7 2.044 0.927
#8 2.67 1.211
SUMMARY OF STEEL
Total
Size of Bar #6
(Tons)=
Unit Weight 0.681
Total Length 2,217.83 1.51
Weight (Kgs) 1,510.34

SUMMARY OF STEEL
Total
Size of Bar #4
(kgs)=
Unit Weight 0.302
Total Length 586.40 177.09
Weight (Kgs) 177.09

SUMMARY OF STEEL
Total
Size of Bar #3
(kgs)=
Unit Weight 0.171
Total Length = #VALUE!
Weight (Kgs) #VALUE!