Professional Documents
Culture Documents
BBS PB1
BBS PB1
Shop Drawings
Raft Foundation
1'-8" 1'-8"
1 B1 #6 1 6" 70 70 38.00 2,660.00 34'-8"
1'-7" 1'-7"
2 B2 #6 1 6" 70 70 37.83 2,648.10 34''-8"
1'-8" 1'-8"
3 T2 #6 1 8" 53 53 38.00 2,014.00 34'-8"
1'-7" 1'-7"
4 T1 #6 1 8" 53 53 37.83 2,004.99 34'-8"
3'-9"
5 M1 #6 1 0 4 4 38.42 153.68 34'-8"
3'-9"
6 M2 #6 1 0 4 4 38.42 153.68 34'-8"
SUMMARY OF STEEL
Page 3 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member
4"
4"
2'-6"
Top extra bar
9"
9"
Stirrup at
PB1 Support #3 4 4" 36 144 4.00 576.00 3" 12"
#3@4" c/c
9"
Stirrup at
PB1 Mid #3 4 6" 18 72 4.00 288.00 3" 12"
#3@6" c/c
Page 4 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member
28'-9"
4"
4"
Top extra bar 2'-6"
PB1 at Support #6 4 2 8 3.25 26.00
9"
(C2)
9"
Stirrup at
PB1 Support #3 2 4 36 72 4.000 288.00 3" 12"
#3@4" c/c
9"
Stirrup at
PB1 Mid #3 2 4 22 44 4.000 176.00 3" 12"
#3@6" c/c
Page 5 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member
At Axis C/1-3
9" 9"
PB1 Mid bar #4 1 2 2 29.42 58.84
28'-8"
2'-9"
Top extra bar
9"
6'-6"
Top extra bar
PB1 at Mid #6 2 1 2 6.500 13.00
support (P1)
9"
Stirrup at
PB1 Support #3 1 4 36 36 4.000 144.00 3" 12"
#3@4" c/c
9"
Stirrup at
PB1 Support #3 1 4 22 22 4.000 88.00 3" 12"
#3@4" c/c
At Axis 1/A-C
Page 6 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member
28'-8"
2'-9"
Top extra bar
9"
PB1 at Support #6 2 1 2 3.500 7.00
(C2)
27'-9"
PB1 Mid Bar #4 1 2 2 28.42 56.84
4"
4"
9"
Stirrup at
PB1 Support #3 1 4 36 36 4.000 144.00 3" 12"
#3@4" c/c
9"
3" 12"
Stirrup at
PB1 Support #3 1 4 22 22 4.000 88.00
#3@4" c/c
At Axis 2/A-C
Page 7 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member
4"
4"
2'-42"
Top extra bar
9"
Page 8 of 11
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
No. of
Nos of Bar Bars in Total Cut Length Total Length
Sr. No. Location Bar Size Member C/C each Nos of of each Bar (ft.) Bar Shape
Bars (ft.)
member
Walls of UGWT
12"
8"
Main Bars
Walls #4 4 7" 84 336 12.25 4,116.00 11'-7"
2'-1" 27''-4"
Distribution
Inner Face #4 4 5" 31 124 29.41 3,646.84
Distribution 2'-1"
Outer Face #4 4 5" 31 124 30.75 3,813.00 28''-8"
SUMMARY OF STEEL
Size of Bar #6 #4 Total (kgs)
Unit Weight 0.681 0.302
Total Length 2,520.00 11,575.84 5,212.02
Weight (Kgs) 1,716.12 3,495.90
30167.8
Bar Dia Wt (lbs/ft) Wt (kg/ft)
#3 0.376 0.171
#4 0.668 0.303
#5 1.043 0.473
#6 1.502 0.681
#7 2.044 0.927
#8 2.67 1.211
SUMMARY OF STEEL
Total
Size of Bar #6
(Tons)=
Unit Weight 0.681
Total Length 2,217.83 1.51
Weight (Kgs) 1,510.34
SUMMARY OF STEEL
Total
Size of Bar #4
(kgs)=
Unit Weight 0.302
Total Length 586.40 177.09
Weight (Kgs) 177.09
SUMMARY OF STEEL
Total
Size of Bar #3
(kgs)=
Unit Weight 0.171
Total Length = #VALUE!