Solar Projects being imp

Sr. No. Project ID Name of Project Developer

2000 MW IST
Megasolis Renewables Private
Limited (formerly known as
1 SPD-ISTS-T1-MSPL-P1-250RJ
Mahindra Renewables Private
Limited)

Adani Solar Energy Four Pvt


2 SPD-ISTS-T1-MSUPPL-P1-50RJ Ltd( earlier known as Kilaj Solar
(Maharashtra) Pvt. Ltd)
ACME Raisar Solar Energy Private
3 SPD-ISTS-T1-ASHL-P1-300RJ
Limited
ACME Phalodi Solar Energy Private
4 SPD-ISTS-T1-ASHL-P2-300RJ
Limited

Azure Power Forty Three Private


5 SPD-ISTS-T1-APIPL-P1-300
Limited

Azure Power Forty Three Private


6 SPD-ISTS-T1-APIPL-P2-300
Limited

7 SPD-ISTS-T1-HSEPL-P1-250RJ Clean Solar Power (Jodhpur) Pvt. Ltd

8 SPD-ISTS-T1-SPICCPL-P1-250TN Arina Solar Private Limited


3000 MW ISTS
ACME Deoghar Solar Power Pvt.
1 SPD-ISTS-T2-ASHL-P1-300
Ltd.
2 SPD-ISTS-T2-ASHL-P2-300 ACME Dhaulpur Powertech Pvt. Ltd.
750 MW Grid Conne
ACME Aklera Power Technology
1 SPD-STU-RJ750-T1-ASHL-P1-250
Pvt. Ltd
Sprng Solar Plus Private Limited
2 SPD-STU-RJ750-T1-FSPPL-P1-250 (Formerly, Fortum Solar Plus Private
Limited)
ReNew Solar Energy (Jharkhand
3 SPD-STU-RJ750-T1-RSPPL-P1-110
Five) Pvt. Ltd
4 SPD-STU-RJ750-T1-SSEPL-P1-100 Sitara Solar Energy Pvt. Ltd.

5 SPD-STU-RJ750-T1-PSHPL-P1-20 Palimarwar Solar House Pvt. Ltd.

6 SPD-STU-RJ750-T1-FSPPL-P2-20 Palimarwar Solar House Pvt. Ltd.


150 MW (50 MW x 3) Grid Connecte
1 SPD-FLOATING-UP-RSPPL-A-50 Auxo Sunlight Pvt. Ltd.
2 SPD-FLOATING-UP-RSPPL-C-50 ReNew Sun Power Pvt. Ltd.
3 SPD-FLOATING-UP-RSPPL-B-50 Rihand Floating Solar Pvt. Ltd.
1200 MW
SBSR Power Cleantech Eleven Pvt.
1 SPD-ISTS-T3-SPCEPL-P1-300RJ
Ltd.

2 SPD-ISTS-T3-RSEJFPL-P1-300RJ ReNew Sun Waves Pvt. Ltd.

3 SPD-ISTS-T3-ERCPL-P1-300RJ Eden Renewable Cite Pvt. Ltd.

4 SPD-ISTS-T3-APIPL-P1-300RJ Azure Power Forty One Pvt. Ltd.

1200 MW

Ayana Renewable Power One Pvt.


1 SPD-ISTS-T4-ARPPL-P1-300RJ
Ltd.

Renew Solar Energy (Jharkhand


2 SPD-ISTS-T4-RSPPL-P1-300RJ
Three) Pvt. Ltd.

3 SPD-ISTS-T4-APMPL-P1-300RJ Azure Power Maple Pvt. Ltd.

4 SPD-ISTS-T4-MSPL-P1-250RJ Mega SuryaUrja Pvt. Ltd.

750 MW Grid Conne

1 SPD-STU-RJ750-T2-NTPCL-P1-160 NTPC Limited

Emergent Solren Private Limited


2 SPD-STU-RJ750-T2-MSPL-P1-200 (Formerly, Mahindra Susten Pvt.
Ltd.)

Clean Solar Power (BHAINSADA)


3 SPD-STU-RJ750-T2-HSEPL-P1-250
Pvt. Ltd.
1200 MW
SPD-ISTS-T5-GRTJIPL-P1-150TN GRT Jewellers (India) Pvt. Ltd.

Adani Solar Energy RJ Two Private


Limited (earlier known as SBE
2 SPD-ISTS-T5-SBERSPL-P2-150RJ
Renewables Sixteen Projects Private
Limited)
Adani Solar Energy RJ Two Private
Limited (earlier known as SBE
3 SPD-ISTS-T5-SBERSPL-P1-180RJ
Renewables Sixteen Projects Private
Limited)
1200 MW

Avaada Sustainable RJProject Private


1 SPD-ISTS-T6-AEPL-P1-300RJ
Limited

2 SPD-ISTS-T6-MSEPL-P1-300MP Masaya Solar Energy Private Limited

3 SPD-ISTS-T6-RSPPL-P1-300RJ ReNew Solar Urja Private Limited

1070 MW Grid Connected Solar P


Pavni (Raj) Solar Private Limited
SPD-STU-RJ1070-T3-AEWC-P1-
1 (Formerly, AEW India North One
200MW
Private Limited)
Green Infra Wind Energy Limited
SPD-STU-RJ1070-T3-GIWEL-P1-
2 (Formerly, Green Infra Renewable
400MW
Projects Limited)
SPD-STU-RJ1070-T3-NTPCL-P1-
3 NTPC Renewable Energy Limited
320MW
SPD-STU-RJ1070-T3-NTPCL-P2-
4 NTPC Renewable Energy Limited
150MW
CPSU

1 SPD-CPSU-T1-NTPCL-769MW NTPC Limited

2 SPD-CPSU-T1-NHDCL-25MW NHDC LTD


The singareni Collieries Company
3 SPD-CPSU-T1-SCCL-90MW
limited

Assam power Distribution Company


4 SPD-CPSU-T1-APDCL-30MW
Limited

5 SPD-CPSU-T1-DMRCL-3MW Delhi Metro Rail Corporation Limited

6 SPD-CPSU-T1-NU-5MW Nalanda University


CPSU

1 SPD-CPSU-T2-NTPC-923MW NTPC Limited

The Singareni Collieries Company


2 SPD-CPSU-T2-SCCL-81MW
Limited

3 SPD-CPSU-T2-IMC-100MW Indore Municipal Corporation


12
Adani Solar Energy Jodhpur Six Pvt
Ltd (earlier known as SBE
1 SPD-ISTS-T8-SBERFPL-P1-300RJ
Renewables Twenty Four Projects
Pvt. Ltd.)
Adani Solar Energy Jodhpur Six Pvt
Ltd (earlier known as SBE
2 SPD-ISTS-T8-SBERFPL-P2-300RJ
Renewables Twenty Four Projects
Pvt. Ltd.)

3 SPD-ISTS-T8-RSPPL-P1-200RJ ReNew Surya Vihaan Pvt. Ltd.

4 SPD-ISTS-T8-ERAPL-P1-300RJ Eden Renewable Alma Pvt. Ltd.

1 SPD-ISTS-T9-ASIPL-P1-3000MW Thar Surya 1 Pvt. Ltd.

SPD-ISTS-T9-AMPEGPL-P1-
2 AMP Energy Green Five Pvt. Ltd.
100MW
Ayana Renewable Power Three Pvt.
3 SPD-ISTS-T9-ARPPL-P1-300MW
Ltd.
4 SPD-ISTS-T9-ERBPL-P1-300MW Eden Renewable Bercy Pvt. Ltd.

5 SPD-ISTS-T9-IBVSPL-P1-300MW IB Vogt Solar Seven Pvt. Ltd.

6 SPD-ISTS-T9-RSPPL-P1-300MW ReNew Surya Aayan Pvt. Ltd.

7 SPD-ISTS-T9-RSPPL-P2-100MW ReNew Surya Vihaan Pvt. Ltd.


SPD-ISTS-T9-P1-SCTSA-P1-
8 Gorbea Solar Pvt. Ltd.
300MW

ISTS Solar PV Pl

SPD-MANUFACTURING-ISTS-
Adani Green Energy Twenty Six A
1 AGEFL-A1-2000:500-P1
Limited
SPD-MANUFACTURING-ISTS-
Adani Green Energy Twenty Six
2 AGEFL-A1-2000:500-P2
Limited

SPD-MANUFACTURING-ISTS-
Adani Green Energy Twenty Seven
3 AGEFL-A1-2000:500-P3
Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Seven


4
AGEFL-A1-2000:500-P4 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Six


5
AGEFL-A1-2000:500-P5 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Six A


6
AGEFL-A1-2000:500-P6 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Six A


7
AGEFL-A1-2000:500-P7 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Six A


8
AGEFL-A1-2000:500-P8 Limited

SPD-MANUFACTURING-ISTS-
9 Azure Power Fifty one Pvt. Ltd.
APIPL-A1-2000:500-P1

SPD-MANUFACTURING-ISTS-
10 Azure Power Fifty Two Pvt. Ltd.
APIPL-A1-2000:500-P2

SPD-MANUFACTURING-ISTS-
11 Azure Power Fifty Two Pvt. Ltd.
APIPL-A1-2000:500-P3
SPD-MANUFACTURING-ISTS- Azure Power Fifty One Private
12
APIPL-A1-2000:500-P4 Limited

SPD-MANUFACTURING-ISTS- Azure Power Fifty One Private


13
APIPL-A1-2000:500-P5 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Four A


14
AGEFL-A2-2000:500-P5 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Four A


15
AGEFL-A2-2000:500-P6 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Four B


16
AGEFL-A2-2000:500-P7 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Four B


17
AGEFL-A2-2000:500-P8 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Four


18
AGEFL-A2-2000:500-P1 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Four


19
AGEFL-A2-2000:500-P2 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Five


20
AGEFL-A2-2000:500-P3 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Five


21
AGEFL-A2-2000:500-P4 Limited
SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Four C
22
AGEFL-A3-2000:500-P1 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Four C


23
AGEFL-A3-2000:500-P2 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Five A


24
AGEFL-A3-2000:500-P3 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Five A


25
AGEFL-A3-2000:500-P4 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Five B


26
AGEFL-A3-2000:500-P5 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Five B


27
AGEFL-A3-2000:500-P6 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Five C


28
AGEFL-A3-2000:500-P7 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Five C


29
AGEFL-A3-2000:500-P8 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Nine


30
AGEFL-A3-2333:583-P9 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Seven A


31
AGEFL-A4-2000:500-P1 Limited
SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Seven A
32
AGEFL-A4-2000:500-P2 Limited

SPD-MANUFACTURING-ISTS- Adani Green Energy Twenty Six B


33
AGEFL-A4-2000:500-P3 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Five


34
AGEFL-A4-2000:500-P4 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Five


35
AGEFL-A4-2000:500-P5 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Five


36
AGEFL-A4-2000:500-P6 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Six


37
AGEFL-A4-2000:500-P7 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Six


38
AGEFL-A4-2000:500-P8 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Six


39
AGEFL-A4-2000:500-P9 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Seven


40
AGEFL-A4-2000:500-P10 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Seven


41
AGEFL-A4-2000:500-P11 Limited
SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Seven
42
AGEFL-A4-2000:500-P12 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Eight


43
AGEFL-A4-2000:500-P13 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Eight


44
AGEFL-A4-2000:500-P14 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Nine


45
AGEFL-A4-2333:583-P15 Limited

SPD-MANUFACTURING-ISTS- Adani Renewable Energy Fifty Nine


46
AGEFL-A4-2333:583-P16 Limited

1785
ReNew Solar Photovoltaic Privte
SPD-STU-RJ1785-T4-ASHPL-P1-
1 (Formerly, ACME Photovoltaic Solar
375MW
Private Limited)
SPD-STU-RJ1785-T4-CSSEPL-P1- Calpine Subsico Solar Energy Private
2
90MW Limited
SPD-STU-RJ1785-T4-RSPPL-P1-
3 Renew Hans Urja Private Limited
300MW
SPD-STU-RJ1785-T4-RSPPL-P2-
4 Renew Hans Urja Private Limited
300MW
SPD-STU-RJ1785-T4-SNPSPL-P1- Sprng Natural Power Source Private
5
200MW Limited
SPD-STU-RJ1785-T4-MESH3PL-P1-
6 Hera Sun Power Private Limited
20MW
SPD-STU-RJ1785-T4-NTPCREL-P1-
7 NTPC Renewable Energy Limited
500MW
2000 MW ISTS-co

1 SPD-ISTS-T11-SAELIL-P1-300 MW SAEL SOLAR MHP1 Pvt. Ltd.

2 SPD-ISTS-T11-SAELIL-P2-300 MW SAEL SOLAR MHP2 Pvt. Ltd.

3 SPD-ISTS-T11-SCIL-P1-100 MW MRS Green Energy Private Limited


4 SPD-ISTS-T11-JL-P1-200 MW-A1 JGRJ One Solar Private Limited

5 SPD-ISTS-T11-RSPPL-P1-300MW Renew Solar Piyush Private Limited

2000 MW ISTS-co

1 SPD-ISTS-T12-SEPL-P1-250MW Sprng Power Earth Private Limited

2 SPD-ISTS-T12-AEPL-P1-300MW Avaada GJ Green Private Limited

3 SPD-ISTS-T12-RSPPL-P1-300MW Renew Solar Stellar Private Limited

Solarcraft Power India 17 Private


4 SPD-ISTS-T12-SPI8PL-P1-150MW
Limited
Solar Projects being implemented under schemes operated by SECI
Project
Date of issuance of LOA Capacity Project Location (State) Effective Date of PPA
(MW)
Solar Tenders under SBG
2000 MW ISTS Connected Solar PV Projects (ISTS-I)

Vill-Bhiv Ji ka Gaon, Tehsil-Bap, Dist.-


27-Jul-18 250 25-Oct-18
Jodhpur

27-Jul-18 50 Vill:, Nure Ki Bhurj/Sihra, Dist: Jodhpur 25-Oct-18

Village-Sanwara, Tehsil-Pokhran, Dist.-


27-Jul-18 300 25-Oct-18
Jaisalmer, Rajasthan
Village-Sanwara, Tehsil-Pokhran, Dist.-
27-Jul-18 300 25-Oct-18
Jaisalmer, Rajasthan

Village Jagdev wala and Daudsar, Tehsil


27-Jul-18 300 25-Oct-18
Bikaner, District Bikaner

Village Jagdev wala and Daudsar, Tehsil


27-Jul-18 300 25-Oct-18
Bikaner, District Bikaner

27-Jul-18 250 Vill-Noore Bhurj, Tehsil-Bap-Dist.-Jodhpur 25-Oct-18


Vill-Ettayapuram, Dist.-Thoothukudi,
27-Jul-18 250 25-Oct-18
Tamilnadu
3000 MW ISTS Connected Solar PV Projects (ISTS-II)
Village-Sanwara, Tehsil-Pokhran, Dist.-
10-Aug-18 300 8-Nov-18
Jaisalmer, Rajasthan
Village-Sanwara, Tehsil-Pokhran, Dist.-
10-Aug-18 300 8-Nov-18
Jaisalmer, Rajasthan
750 MW Grid Connected in Rajasthan Tranche-I (non-solar park)
Vill: Arang & Rathkuria, Tehsil: Shiv, Dist:
2-Mar-19 250 2-Jun-19
Badmer, State Rajasthan

Vill: Bainsada , Tehsil: Pokhran, Dist:


2-Mar-19 250 2-Jun-19
Jaisalmer, State Rajasthan

Vill: Bhainsara, Tehsil: Fatehgarh, Dist:


2-Mar-19 110 2-Jun-19
Jaisalmer, State Rajasthan
Vill: Kanasar, Tehsil: Bap, Dist: Jodhpur,
2-Mar-19 100 2-Jun-19
State Rajasthan
Vill: Hariyasar, Tehsil: Pokhran, Dist:
2-Mar-19 20 2-Jun-19
Jaisalmer, State Rajasthan
Vill: Hariyasar, Tehsil: Pokhran, Dist:
2-Mar-19 20 2-Jun-19
Jaisalmer, State Rajasthan
150 MW (50 MW x 3) Grid Connected Floating Solar Power Project to be installed at Rihand Dam
5-Sep-19 50 Rihand Dam, Sonbhadra Dist. UP 4-Dec-19
5-Sep-19 50 Rihand Dam, Sonbhadra Dist. UP 4-Dec-19
5-Sep-19 50 Rihand Dam, Sonbhadra Dist. UP 4-Dec-19
1200 MW ISTS Connected Projects (ISTS-III)
Vill: Lalsar & Hapasar, Tehsil: Bikaner,
1-Mar-19 300 3-Jul-19
Dist: Bikaner, State Rajasthan

Vill: Mandhopura, Tehsil: Fatehgarh, Dist:


1-Mar-19 300 20-Jun-19
Jaisalmer, State Rajasthan

Vill:Lakhasar, Tehsil: Pokhran, Dist:


1-Mar-19 300 24-Jun-19
Jaisalmer, State Rajasthan

Vill: Noore Ki Bhurj, Khakhuri, Dedasari,


1-Mar-19 300 Kushla Ram ki Basti, Ismail ki Dhani, 29-Aug-19
Tehsil: Bap, Dist: Jodhpur, Rajasthan

1200 MW ISTS Connected Projects (ISTS-IV)

25-Jul-19 300 Vill: Khichiya, Bikaner Dist., Rajasthan 23-Oct-19

Vil: Mandhopura, Tehsil: Fatehgarh, Dist


25-Jul-19 300 23-Oct-19
Jaisalmer, Rajasthan

Vill: Sonanda, Shekhar, Bandhari &


25-Jul-19 300 Kesarapura Teshsil: Bap, Dist. Jodhpur, 23-Oct-19
Rajasthan

25-Jul-19 250 Jodhpur Dist., Rajasthan 25-Mar-20

750 MW Grid Connected in Rajasthan Tranche-II (non-solar park)


Vill: Jetsar, Dist. Sri Ganga Nagar,
16-Sep-19 160 16-Oct-19
Rajasthan

16-Sep-19 200 Bikaner Dist. Rajasthan 16-Oct-19

Vill: Bhainsada, Amarsar/Balwantgarh,


16-Sep-19 250 Tehsil: Bhaniyana, Dist: Jaisalmer, 16-Oct-19
Rajasthan
1200 MW ISTS Connected Projects (ISTS-V)
Taluka: Ettayapuram, Kayathar, District:
28-Sep-19 150 11-Feb-20
Thoothukkudi, Tamil Nadu

Village: Ugraas, Nagnechi nagar and Dadhu,


28-Sep-19 150 Tehsil: Phalodi, District: Jodhpur, State: 11-Feb-20
Rajasthan

Village: Devikot, Tehsil: Fatehgarh, District:


28-Sep-19 180 11-Feb-20
Jaisalmer, State: Rajasthan

1200 MW ISTS Connected Projects (ISTS-VI)

Village: Noorsar, Tehsil: Bikaner in Bikaner,


25-Nov-19 300 11-May-20
Rajasthan

25-Nov-19 300 Khandwa, Madhya Pradesh 11-May-20

Village Mandhopura, Tehsil Fatehgarh,


25-Nov-19 300 11-May-20
District Jaisalmer, State Rajasthan

1070 MW Grid Connected Solar PV Power Projects in Rajasthan Tranche-III (non-solar park)
Village: Aarang, Tehsil: Sheo, District:
28-Dec-20 200 27-Jan-21
Barmer

28-Dec-20 400 Jaisalmer District, Rajasthan 27-Jan-21

28-Dec-20 320 Chhatargarh, Bikaner, Rajasthan 27-Jan-21

28-Dec-20 150 Bhainsara, Jaisalmer, Rajasthan 27-Jan-21


CPSU Scheme (Tranche-I, 2000 MW)

28-Sep-19 769 Rajasthan & Tamilnadu NA

28-Sep-19 25 Madhya pradesh NA


28-Sep-19 90 Various of Areas of SCCL NA

Lower Assam zone, 2. Central Assam


28-Sep-19 30 NA
Zone,3 cachar,karimganj, Hailakandi Assam

28-Sep-19 3 Metro Station Depots etc.of DMRC, Delhi NA

28-Sep-19 5 Nalanda University, Rajgir NA


CPSU Scheme (Tranche-II, 1500 MW)

25-Nov-19 923 Rajasthan & Gujarat NA

25-Nov-19 81 Various of Areas of SCCL NA

Yaswnath Sagar Dam Reservoir,Hatod


25-Nov-19 100 NA
Village, Indore District,Madhya Pradesh
1200 MW ISTS Tranche-VIII
Village- Khavda, Tehsil- Bhuj, Dist.-
6-Apr-20 300 20-Jan-23
Kutchh, Gujarat

Village- Khavda, Tehsil- Bhuj, Dist.-


6-Apr-20 300 20-Jan-23
Kutchh, Gujarat

Vill: Madhopura, Tehsil: Fatehgarh,


6-Apr-20 200 20-Oct-23
Dist:Jaisalmer, Rajasthan

Vilage: Kansingh ki seer (sid), Tehsil: Bap,


6-Apr-20 300 20-Oct-23
Dist: Jodhpur, Rajasthan

2000 MW ISTS Tranche-IX

Vill: Dholera 1, Jamsar, Dist: Bikaner,


15-Jul-20 300 27-Jul-21
Rajasthan

Village: Badi Seed & Ranjeet Nagar,


15-Jul-20 100 11-Apr-22
Tehsil: Bap, Distt: Jodhpur State: Rajasthan
15-Jul-20 300 Bikaner District, Rajasthan 11-Apr-22
Vill: Pusar/Pushad, Tehsil: Sheo, Barmer,
15-Jul-20 300 11-Apr-22
Rajasthan
Jaisalmer (near villages Neemba, Deora),
Tehsil: Fatehgarh,
15-Jul-20 300 11-Apr-22
Distt: Jaisalmer,
State: Rajasthan
Village - Neebma, Tehsil - Fatehgarh, Dist. -
15-Jul-20 300 28-Apr-22
Jaisalmer, State - Rajasthan
Village - Neebma, Tehsil - Fatehgarh, Dist. -
15-Jul-20 100 1-Apr-22
Jaisalmer, State - Rajasthan
Vill: Bari Seer, Tehsil: Baap, Dist: Jodhpur,
15-Jul-20 300 30-Dec-23
Rajasthan

ISTS Solar PV Plant linked with Solar Manufacturing Plant


LOA: 10/12/2019
Addendum to LoA:
08/06/2020 200 Kutchh, Gujarat 1-Oct-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 167 Kutchh, Gujarat 13-Oct-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Jaisalmer, Rajasthan 13-Oct-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Jaisalmer, Rajasthan 13-Oct-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 333 Khavda, Kutchh, Gujarat 17-Nov-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 50 Khavda, Kutchh, Gujarat 10-Feb-22
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 50 Khavda, Kutchh, Gujarat 20-Jul-22
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
Village- Khavda, Tehsil- Bhuj, District-
08/06/2020 234 9-Dec-22
Kutchh, Gujarat
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
23/07/2020 100 Bap, Distt. - Jodhpur, Rajasthan 11-Nov-21
Addendum-2 to LoA:
18/03/2024
LOA: 10/12/2019
Addendum to LoA:
23/07/2020 333 Bap, Distt. - Jodhpur, Rajasthan 11-Nov-21
Addendum-2 to LoA:
18/03/2024
LOA: 10/12/2019
Addendum to LoA:
23/07/2020 167 Bap, Distt. - Jodhpur, Rajasthan 17-Nov-21
Addendum-2 to LoA:
18/03/2024
LOA: 10/12/2019
Addendum to LoA:
23/07/2020 50 Bap, Distt. - Jodhpur, Rajasthan 10-Feb-22
Addendum-2 to LoA:
18/03/2024
LOA: 10/12/2019
Addendum to LoA:
23/07/2020 50 Bap, Distt. - Jodhpur, Rajasthan 20-Jul-22
Addendum-2 to LoA:
18/03/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Fatehgarh, Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Fatehgarh, Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Fatehgarh, Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Fatehgarh, Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Fatehgarh, Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Fatehgarh, Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Pokhran, Jaislmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Pokhran, Jaislmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Fatehgarh, Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Fatehgarh, Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Ramgarh/Mohangarh Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Ramgarh/Mohangarh Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Ramgarh/Mohangarh Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Ramgarh/Mohangarh Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Ramgarh/Mohangarh Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Ramgarh/Mohangarh Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
Village- Khavda, Tehsil- Bhuj, District-
08/06/2020 250 13-Mar-24
Kutchh, Gujarat
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 167 Jaisalmer, Rajasthan 1-Dec-21
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 150 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 100 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 150 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 100 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 250 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 150 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 100 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 200 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 99 Khavda, Kutchh, Gujarat 26-Dec-23
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 150 Khavda, Kutchh, Gujarat 13-Mar-24
Addendum-2 to LoA:
23/02/2024
LOA: 10/12/2019
Addendum to LoA:
08/06/2020 134 Khavda, Kutchh, Gujarat 13-Mar-24
Addendum-2 to LoA:
23/02/2024
1785 MW Rajasthan (Tranche-IV)

15-Feb-22 375 Jaisalmer, Rajasthan 16-Apr-22

Aau, Tehsil: Aau, District: Jodhpur,


15-Feb-22 90 16-Apr-22
Rajasthan
15-Feb-22 300 Jaisalmer, Rajasthan 16-Apr-22

15-Feb-22 300 Jaisalmer, Rajasthan 16-Apr-22

15-Feb-22 200 Barmer, Rajasthan 16-Apr-22


Village: Sawa, Tehsil: Chohtan, District:
15-Feb-22 20 16-Apr-22
Barmer, Rajasthan
15-Feb-22 500 Bhadla, District: Jodhpur, Rajasthan 16-Apr-22
2000 MW ISTS-connected Solar PV Power Projects (ISTS-XI)
Village: Thollamadugu and Korumanipalle,
28-Jul-23 300 Tehsil: Kolimigundla, District: Kurnool, 30-Dec-23
State: Andhra Pradesh

Village: Thollamadugu and Korumanipalle,


28-Jul-23 300 Tehsil: Kolimigundla, District: Kurnool, 30-Dec-23
State: Andhra Pradesh

Village:- Karnisar Bhatiyan,


Tehsil:- Pugal
28-Jul-23 100 9-Jan-24
District:- Bikaner
State:- Rajasthan
Village:- Karnisar Bhatiyan,
Tehsil:- Pugal
28-Jul-23 100 21-Feb-24
District:- Bikaner
State:- Rajasthan

Tehsil: Shiv, district: Barmer, State:


28-Jul-23 300 21-Feb-24
Rajasthan

2000 MW ISTS-connected Solar PV Power Projects (ISTS-XII)

Village: Padasan & Radosan, District:


01-Jan-24 250 31-Mar-24
Banaskantha, State-Gujarat

01-Jan-24 300 Tehsil-Bhuj, District-Kutch, State- Gujarat 31-Mar-24

01-Jan-24 300 Barmer, Rajasthan 31-Mar-24

Village: Mehrasar, District: Bikaner


01-Jan-24 150 31-Mar-24
Rajasthan
Total capacity commissioned
Actual Commissioning Date
as on date (MW)

14.05.2021 (100 MW)


07.06.2021 (60 MW)
250
23.07.2021 (50 MW)
17.08.2021 (40 MW)

17.04.2020 50

15.12.2020 (150 MW)


30.01.2021 (100 MW) 300
08.02.2021 (50 MW)
25.06.2021 (50 MW)
08.08.2021 (50 MW)
300
22.09.2021 (100 MW)
31.12.2021 (100 MW)
14.03.2022 (115 MW)
250
21.04.2022 (135 MW)
Under Litigation.

20.07.2023 (200 MW)


250
06.01.2024 (50 MW)

19.03.2021 (150 MW)


250
01.05.2021 (100 MW)

04.02.2021 (50 MW)


110
11.03.2021 (60 MW)
20.05.2021 100

19.04.2021 (20 MW) 20

19.04.2021 (20 MW) 20


Dam
Under Litigation.
Under Litigation.
Under Litigation.
15.08.2021 (50 MW)
04.04.2022 (50 MW)
150
11.04.2022 (50 MW)
Under Litigation.

13.08.2021 (150 MW)


17.08.2021 (50 MW)
300
04.09.2021 (50 MW)
04.10.2021 (50 MW)

13.08.2021 (300 MW) 300

12.10.2021 (50 MW)


30.10.2021 (50 MW)
30.11.2021 (50MW)
300
24.12.2021 (50 MW)
31.01.2022 (50 MW)
07.03.2022 (50 MW)

25.11.2021 (100 MW)


07.12.2021 (50 MW) 300
22.12.2021 (150 MW)

02.09.2021 (150 MW)


27.09.2021 (50 MW)
300
04.10.2021 (50 MW)
09.12.2021 (50 MW)

14.02.2022 (53 MW)


30.03.2022 (204 MW) 300
31.03.2023 (43 MW)

175 MW: 20.05.2022


250
75 MW: 17.06.2022

22.10.2021 (80 MW)


25.03.2022 (80 MW) 160

14.10.2021 (200 MW) 200

05.04.2022 (150 MW)


250
05.05.2022 (100 MW)
30.03.2022 (50 MW)
13.04.2022 (50 MW) 150
17.06.2022 (50 MW)

23.02.2024 (59.95 MW)


165
21.03.2024 (105.05 MW)

14.01.2022 (100 MW)


07.02.2022 (50 MW)
300
12.04.2022 (50 MW)
11.05.2022 (100 MW)

21.06.2023 (150 MW)


08.09.2023 (100 MW) 300
50 MW: 18.03.2024
01.12.2021 (150 MW)
07.12.2021 (50 MW)
300
13.12.2021 (50 MW)
16.12.2021 (50 MW)
k)

70 MW: 21.02.2024
150
80 MW: 29.03.2024

250MW- 06.08.2022
150MW- 13.12.2022
230MW- 15.12.2022 769
100MW- 20.12.2022
39MW- 30.12.2022
04.08.2021 (28MW)
08.04.2021 (8.75 MW)
27.05.2021 (6.25MW)
90
05.06.2021 (10MW)
13.10.2021 (20.55MW)
03.11.2021 (16.45 MW)

01.02.2022 (0.3 MW)


26.08.2021 (0.3 MW)
08.07.2021 (0.3 MW)
31.05.2021 (0.3 MW)
31.05.2021 (0.3 MW)
3
09.08.2021 (0.3 MW)
06.11.2021 (0.3 MW)
08.07.2021 (0.3 MW)
08.07.2021 (0.3 MW)
08.07.2021 (0.3 MW)

19.09.2023 (5 MW) 5

30.12.2021 (49.92 MW)


05.02.2022 (74.88 MW)
05.03.2022 (74.88 MW)
19.06.2022 (47.52 MW)
05.08.2022 (48.80 MW)
14.05.2022 (20 MW)
15.06.2022 (15 MW)
15.08.2022 (21 MW)
773
23.08.2022 (10MW)
07.06.2023 (10MW)
29.09.2022 (150 MW)
13.12.2022 (90 MW)
30.12.2022 (11 MW)
16.02.2023 (50 MW)
01.04.2023 (50MW)
03.06.2023 (50MW)

22.01.2023 (5 MW)
19.02.2024 (8.5 MW) 15.5
26.04.2024 (2.0 MW)
23.03.2022 (54 MW)
23.06.2022 (54 MW)
09.08.2022 (54 MW) 300
11.10.2022 (74 MW)
24.11.2022 (64 MW)

290 MW: 28.03.2024 290

98 MW: 29.03.2024 98
PPA terminated due to non compliance of
Conditions Subsequent.

PPA terminated due to non compliance of


Conditions Subsequent.