Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 4

Validate Print Help Percentage BoQ

Tender Inviting Authority: Executive Engineer, Maharashtra Jeevan Pradhikaran, Water Management Division Nagpur
Name of Work : M & R to Wena Water Supply Scheme. - Replace of Shrouding Material of Filter Bed - 3 Nos.
Contract No: E-Tender Notice No. 01 of 2024-25
Bidder 123
Name :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for
this tender. Bidders are allowed to enter the Bidder Name and Values only )

NUMBER TEXT # NUMBER # TEXT # NUMBER NUMBER # TEXT #


#
Sl. Item Description Quantity Units Estimated TOTAL AMOUNT TOTAL AMOUNT
No. Rate In Words

1 2 3 4 5 6 7
1 Item No-1: Excavation foundation / pipe trenches in hard murum
including removing the excavated material upto a distamce of 50 m and
lifts as below, stacking and spreading as directed by Engineer-in- 192.00 Cum 206.04 #VALUE! #VALUE!
charge, normal dewatering, preparing the bed for foundation and
excluding backfilling, etc. complete
Item No-2: Dewatering the excavated trenches and pools of water in
the building trenches / pipeline trenches, well works by using pumps
1.01 and other devices including disposing off water to safe distance as 600.00 BP/Hr 90.78 #VALUE! #VALUE!
directed by Engineer-in-charge (including of cost of machinery, labour,
fuel) etc. complete.
Item No-3 : Providing, supply shrouding material at filter bed of WTP.
1.02 334.80 Cum 5694.92 #VALUE! #VALUE!

Item No-4 : Cleaning the base of filter bed wall and withdraw of old AC
1.03 224.00 Manday 634.44 #VALUE! #VALUE!
Pipe.
Item No-5 : Providing and applying epoxy paint of approved make
(Shalimar, Ciba or Mahindra & Mahindra) concrete surface for RCC
ESR or GSR or any other structure including cleaning the surface by
scrapping and air blowers to the satisfaction of Engineer-in-charge,
1.04 necessary scaffolding etc.compete will all leads and lifts and giving 296.75 Sqm 930.24 #VALUE! #VALUE!
satisfactory hydraulic test for water tightness as per I.S.Codes.
Sl. Item Description Quantity Units Estimated TOTAL AMOUNT TOTAL AMOUNT
No. Rate In Words

Item No-6 : Filling in plinth and floors with approved excavated material
1.05 in 15 cm to 20 cm layters including watering and compacting etc. 187.20 Cum 124.80 #VALUE! #VALUE!
complete.
Item No-7 : Spreading dry / trap / granite / quartzite / gneiss rubble
1.06 stone soling 15 cm to 20 cm thick including hand packiing and 70.90 Cum 449.28 #VALUE! #VALUE!
compacting etc. complete.

Total in Figures #VALUE! #VALUE!

Quoted Rate in Figures Less (-) 7.5000% #VALUE! #VALUE!

Quoted Rate in Words


#VALUE!
Please Enable Macros to View BoQ information
Q information

You might also like