Professional Documents
Culture Documents
For Pile Testing
For Pile Testing
E=100.00 E=159.99
N=150.00 5999
N=150.00
50 450 500 500 500 500 500 500 500 500 500 500 449 50
50
50
50
50
50
50
50
50
50
50
50
50
50
GENERAL NOTES :
435
575
515
50
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
1 50
0 SUBMISSION 21-JUN-2021
500
500
OWNER:
650
50
50
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
2
500
500
Type Pile Dia NO.OF Capacity CONSULTANT:
PILES Cut Off Level
Ton
50
Type-A P50 50 95 -0.17
650
50
Type-B P50 48 95 -0.95
Type-C P50 9 95 -1.22
500
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
500
3 Type-E P50 19 65 -2.55 MAIN CONTRACTOR:
500
500
PROJECT NAME :
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
50
5000
5000
G42 WASTE WATER
3900
4 ANALYSIS LABORATORY
50
500
ZONE :
500
652
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
50 PILING CONTRACTOR :
5
FILE LOCATION: D:\BAckup 29-07-17\VISMARK-WORK -PROJECT\2021\53 - WASTE WATER\MODIFIED DRAWING\REV.1\MODIFIED DRAWING.dwg
500
525
S & H ENGINEERING LLC
50 Tel no. 02-6313253 Fax: 02-6317704 P.O. Box 46865
650
67.5 57.5
50
DRAWING TITLE :
500
320
50
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
50
6 OVERALL PILE LAYOUT
360
DRAWING NO : REVISION NO:
50
650
50 S101 00
500
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
62.5 62.5
1390
380
7 50
PROJECT ID : PLAN ID :
50 B1N-2021-003914 000
650 650 515 270 515 650 650
465
A B C D D' E F G
330
50
50
50
50
50
50
50
50
50
50
50
50
50
50
20
50 449 500 497 500 278 500 500 500 500 521 634 110 445 15
555
E=100.00 E=159.99
N=100.00 N=100.00
5999
LAND KEY :
MAIN BUILDING /
SERVICE BLOCK BOUNDARY WALL PILE
64.0cm
64.0cm
PILES
GENERAL NOTES :
(VARIABLE) CUT OFF LEVEL (VARIABLE) CUT OFF LEVEL
*REFER TO OVERALL PILE LAYOUT DWG *REFER TO OVERALL PILE LAYOUT DWG
0 SUBMISSION 22-JUN-2021
REV. NO. DESCRIPTION Date
OWNER:
A A
75m A A M/S: WHITE CRESCENT
m 6 16mm
PROJECT NAME :
T8 @ 150 mm
PILE SECTION
500mm
PILE GEOMETRICAL CHARACTERISTICS
PILE DIAMETER = 500 MM
SECTION B-B DRAWING NO : REVISION NO:
S102 00
WORKING COMP. LOAD = 950 KN SUBMISSION DATE : SCALE :
WORKING HLE LOAD = 47.50 KN (-6.00 M) PILE TOE LEVEL 22-JUN-2021 NTS
COMP. FACTOR OF SAFETY = 3.75
PILE GEOMETRICAL CHARACTERISTICS PROJECT ID : PLAN ID :
B1N-2021-003914 000
REINFORCEMENT TYPE = Non-Epoxy Steel PILE DIAMETER = 500 MM
OFFICE USE ONLY :
PILE COORDINATES: B.WALL PILE COORDINATES: MAIN BLDG. PILE COORDINATES: MAIN BLDG. PILE COORDINATES: MAIN BLDG.
PILE NO. EASTINGS NORTHINGS PILE NO. EASTINGS NORTHINGS PILE NO. EASTINGS NORTHINGS PILE NO. EASTINGS NORTHINGS
1 100.50 149.50 40 108.35 137.12 79 134.35 130.62 118 114.85 111.12
2 105.00 149.50 41 101.85 144.88 80 140.85 131.88 119 114.85 112.37 GENERAL NOTES :
19 159.49 119.35 58 134.35 137.12 97 101.85 117.63 136 140.85 105.88 G42 WASTE WATER
ANALYSIS LABORATORY
20 147.95 100.50 59 127.85 138.37 98 108.35 118.87 137 140.85 104.63
ZONE :
21 142.74 100.50 60 127.85 137.12 99 108.35 117.62 PILE COORDINATES: SERV. BLOCK MAFRAQ INDUSTRIAL AREA
22 137.74 100.50 61 122.70 137.75 100 114.85 118.87 PILE NO. EASTINGS NORTHINGS SECTOR NO : PLOT NO :
MAFRAQ
P523
23 132.74 100.50 62 120.00 137.75 101 114.85 117.62 138 154.29 100.50 INDUSTRIAL CITY
PILING CONTRACTOR :
24 127.74 100.50 63 114.85 138.37 102 120.00 118.25 139 159.49 100.50
FILE LOCATION: D:\BAckup 29-07-17\VISMARK-WORK -PROJECT\2021\53 - WASTE WATER\MODIFIED DRAWING\MODIFIED DRAWING.dwg
25 122.74 100.50 64 114.85 137.12 103 122.70 118.25 140 155.39 103.50 S & H ENGINEERING LLC
Tel no. 02-6313253 Fax: 02-6317704 P.O. Box 46865
26 119.96 100.50 65 108.35 138.37 104 127.85 118.87 141 159.49 103.50
27 114.96 100.50 66 101.85 138.38 105 127.85 117.62 142 159.49 107.30 DRAWING TITLE :
28 109.99 100.50 67 101.85 137.13 106 134.35 118.87 143 155.39 107.30
29 104.99 100.50 68 101.85 131.88 107 134.35 117.62 144 155.39 110.90 OVERALL PILE COORDINATES
30 100.50 100.50 69 101.85 130.63 108 140.85 118.88 145 159.49 110.90 DRAWING NO : REVISION NO:
31 100.50 105.15 70 108.35 131.87 109 140.85 117.63 146 155.39 114.10 S101A 00
32 100.50 110.15 71 108.35 130.62 110 140.85 112.38 147 159.49 113.42
SUBMISSION DATE : SCALE :
21-JUN-2021 NTS
33 100.50 115.15 72 114.85 131.87 111 140.85 111.13 148 159.49 114.67 PROJECT ID : PLAN ID :