Solar Power Plant
Solar Power Plant
ERODE-1.
QUOTATION
TO
N. RANJITH,
NANJANAPURAM,
ERODE- 638107.
Dear Sir,
We discussed with your need for your company we give our best quote for you in the
below .We assuring to give the best service at all time
S.N
Item Item / Specification Ratings/Make Quantity
o.
1 Solar PV The solar PV module which performs the Mono Perc–
module basic function of the solar assembly.
545wp 6 No’s
2 Solar PV Grid-tie inverters convert DC electrical
inverter power into AC power suitable for injecting
into the electric utility company grid. The 3 kw -1 NO’S
grid tie inverter (GTI) must match the phase
of the grid and maintain the output voltage DEYE/EVVO/GR
slightly higher than the grid voltage at any ROWAT
instant.
1 Nos.
6 ACDB Alternative Current Distribution Box is an 1 IN 1 Out –
important part of Solar Power generating 1 No.
system to provide extra electrical protection
to the system during failures.
Customer scope;
Civil work
Earth irrigation
Ac power cable
Net meter
1. 70% Advance with Purchase order against 30% at the time of delivery.
2. installations charges and delivery charges EXTRA, (approximately Rs.3500/-three thousand five
hundred only).