Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SUPREME POWER SYSTEM

N0.1 BHARATHI STREET, ADJOINT SENGUNTHAR SCHOOL COMPOUND,

ERODE-1.

Cell no : 98430-15340, 99653-68562. Customar care : 97877-40081.

NCS ID: E19F82-1631142478264

GSTIN/UIN : 33ALHPA7408G1ZI DATE :04.07.2024.

QUOTATION

TO

N. RANJITH,

NEAR KONGU ARTS&SCIENCE COLLAGE,

NANJANAPURAM,

ERODE- 638107.

SUB; ( QUATATION FOR 3KW SOLAR POWER PLANT)

Dear Sir,

We discussed with your need for your company we give our best quote for you in the
below .We assuring to give the best service at all time
S.N
Item Item / Specification Ratings/Make Quantity
o.
1 Solar PV The solar PV module which performs the Mono Perc–
module basic function of the solar assembly.
545wp 6 No’s
2 Solar PV Grid-tie inverters convert DC electrical
inverter power into AC power suitable for injecting
into the electric utility company grid. The 3 kw -1 NO’S
grid tie inverter (GTI) must match the phase
of the grid and maintain the output voltage DEYE/EVVO/GR
slightly higher than the grid voltage at any ROWAT
instant.

3 Module Module mounting structure suitable for Custom made by


mounting ground mount
system SUPREME As per design
4 DC Cable DC Cable - 1C x 6 Sq.mm Solar Flexible
Tinned Annealed Copper Cable
As per design –
30 MTRS
Polycab
5 DCDB 1) Array Junction Box or DCDB provides
the interconnection between the input string
from the solar panels, and the output string ABB/L&T –
to the solar inverter. Switch Gears
With SPD
Mersin – Fuse
Links 1 IN 1 OUT-

1 Nos.
6 ACDB Alternative Current Distribution Box is an 1 IN 1 Out –
important part of Solar Power generating 1 No.
system to provide extra electrical protection
to the system during failures.

AC Distribution Box contains 4 pole MCCB,


terminals, voltage and current monitoring ABB – Switch
etc. It has surge protection device to ensure Gears With SPD
maximum protection to the electronic
equipment.
Space requirement 270 sq/mtr

TOTAL PROJECT COST RS.2, 10,000/- (TWO LAKHS TEN THOUSAND)


ONLY

Customer scope;

 Civil work
 Earth irrigation

 Ac power cable
 Net meter

TERMS & CONDITION:

1. 70% Advance with Purchase order against 30% at the time of delivery.

2. installations charges and delivery charges EXTRA, (approximately Rs.3500/-three thousand five
hundred only).

3. Delivery for 3days from of your purchase order.

4. Warranty issues all are company terms & condition.

5. The above prices are including GST.

FOR SUPREME POWER SYSTEM

ASOKKUMAR.S

PROPRIETOR

You might also like