SIMPLEX INFRASTRUCTURES LIMITED

FIELD REPORT FOR THE PILE LOAD TEST

Project : Construction of 3 (three) elevated stations at Central Park, Karunamoyee and Sector-V
including track supporting viaduct structure of 140 m length at each Station on
East-West Metro Project of KMRCL [Contract No: EWS-1(R)]
Client : Kolkata Metro Rail Corporation Limited.
General Consultant : MYCEL
Agreement No. : KMRCL/CE/EWS-1(R)/04/09, dated : 19/06/09
Date of Test : 24.02.2010.

A. Pile Details: 1. Test Pile No - “05”


2. Drawing No. - 1.11 KE. 3.A.GL.DR.3.1
3. Type of Test - Initial Load Test
4. Nature of Test - Vertical Load Test
5. Type of Pile - Cast-In-situ Bored Pile
6. Test Pile Size - 1200mm Dia.
7. Date of Casting - 27.12.2009.
8. Grade of Concrete - M30
9. Location of Pile - Karunamoyee
10. Cut off Level of Pile - (+)2.95 [EGL (+) 3.1]
11. Founding Level - (-)34.9[ EGL (+) 3.1]
12. Load Applied at - (+) 3.25m [EGL (+) 3.1]
13. Date of Test - 24.02.2010
14. Safe Design Load - 420.00 MT
15. Test Load - 1050.00 MT [2.50 times of 420.00MT]
B. Test Pile Reinforcement Details:
1) Main Reinforcement - 16 tor – 24 nos.
2) Helical Reinforcement - Spiral of 10 tor @ 150mm C/C(Pitch)
C. Pressure Gauge Details:
1) Make - MASTA
2) Range - 0 – 960 Kg/cm2
3) Least Count - 20 Kg/cm2
D. Dial Gauge Details:
1) No. of Dial gauge Used - 4 nos.
2) Make - MITUTOYO
3) Model No. - 30589 – 19
4) Range - 0 to 50mm
5) Least Count - 0.01mm
6) Identification of Instrument- AI/ML/DCT/013
7) No. of magnetic Stand - 4 nos.
E. Jack Details: 1) Capacity of Jack - 1000 Ton
2) Ram Dia. of Jack - 48.50 cm.
3) Ram Area per Jack - 1848.196 Sq.cm.
4) No. of Jack - 2 nos.
5) Pump - Power Pack
F. Details of Kentledge:
1) No. of Anchor Pile - 2 nos.
2) Dia. of Anchor Pile - 1200mm Dia.
3) Founding Level of - (-) 33.00 M [EGL - (+) 3.1m]
Anchor Pile

G. Details of Anchor Pile Reinforcement:


1) Main Reinforcement - 32 dia 30nos tor steel
2) Helical Reinforcement - Spiral of 10 tor @ 150mm C/C(Pitch)