SIMPLEX INFRASTRUCTURES LIMITED

Project : Construction of 3 (three) elevated stations at Central Park, Karunamoyee and Sector- V including track supporting viaduct
structure of 140 m length at each Station on East-West Metro Project of KMRCL [Contract No: EWS-1(R)]
Client : Kolkata Metro Rail Corporation Limited.
General Consultant : MYCEL
Location : Karunamoyee (E=55829.708, N=538269.554)
Agreement No. : KMRCL/CE/EWS-1(R)/04/09, dated: 19/06/09
Date of Test : 24.02.2010.
ABSTRACT OF LOAD INCREMENT AND DECREMENT IN STAGES
Least Count of Pressure Gauge - 20 Kg/cm2
Ram Area (For 2nos. 1000MT capacity Jack) - 3696.39 Sq.cm.
Load per Division - 20 x 3696.39 = 73927.80 Kg = 73.927 MT, say 73.93 MT
Safe Design Load of Pile - 420.00 MT
Test Load of Pile (2.5 Times of 300.00MT) - 1050.00 MT
Load Increment 20% of Safe Design Load

LOADING
Load in UNLOADING
Required Load Actual Load
Stages
DivisionLoad in in Ton
Stages
Required Load
AppliedActual
in TonLoad
Division in Ton Applied in Ton
1 1 0 16 0.00 1092.00 0.00 1182.88
2 2 2 14 84.00 1008.00 147.861035.02
3 3 3 13 168.00 924.00 221.79961.09
4 4 4 12 252.00 840.00 295.72887.16
5 5 5 11 336.00 756.00 369.65813.23
6 6 6 10 420.00 672.00 443.58739.30
7 8 588.00 591.44
7 7 504.00 517.51
8 7 504.00 517.51
8 9 8 6 588.00 420.00 591.44443.58
9 10 10 5 672.00 336.00 739.30369.65
10 11 11 4 756.00 252.00 813.23295.72
11 12 12 3 840.00 168.00 887.16221.79
12 13 13 2 924.00 84.00 961.09147.86
13 14 14 0 1008.00 0.00 1035.020.00
14 16 1092.00 1182.88