ABBREVIATIONS:

SWP Sewer Waste Pipe


VP Vent Pipe
WP Drain Waste Pipe
FD Floor Drain
FT Floor Trap
FW Floor Waste
GT Gully Trap
CWP Cold Water Pipe
IC Inspection Chamber
WS Waster Sump
MH Manhole
SAD Supply Air Duct
RAD Return Air Duct
FAD Fresh Air Duct
EAD Exaust Air Duct
1 2 3 FR/TR Fire Rated Trunking
FO Floor Opening
WO Wall Opening
14800 PS Pipe Sleeve
PF Puddle Flange
3400 11400
MATCH TO DRAWING NO.
CR117-POCCL-CR13-L1-
B-SEM -DR-LPL-7302 LEGEND:

MATCH TO DRAWING NO. = 100(W) x 100(H) Kerb,


CR117-POCCL-CR13-L1- unless indicated as different Height
B-SEM -DR-LPL-7302

= 100(H) Plinth,
unless indicated as different Height

= Cladding/ Panel

= Concrete Wall

UP = Light Weight Concrete Wall

= Column

UP

H
FFL

All rectangular opening measured


from bottom of opening

H
UP
FFL

All circular opening measured from


bottom of opening

L1 ENTRANCE LEVEL (PART 3 OF 11)


1 1 : 50

Qualified Person Endorsement:

0m 0.5m 2.5m 5m

SCALE 1: 50 FOR FINAL DESIGN

CR117 SYSTEM WIDE CONTRACTORS


Land Transport Authority
DATE
Contractor: Consultant :

SIGNAGURE In Association with:


VHA Consultants Pte Ltd
CPG Consultants Pte Ltd
NAME
Project Title:

Maintenance Commercial Info


SERVICE Track Work Signaling System Power Supply System ISCS OCR Communication System AMS Lifts Escalators AFC TVS & ECS Electrical Service Fire Protection Water Handling PSC/SMR CONTRACT CR117 DESIGN AND
Management System Communication System
CONSTRUCTION OF BRIGHT HILL
CR150 CR152 CR153 CR155 CR156 CR159 CR160 CR161 CR168 CR171A CR171B CR172B CR173B (CR1009) CR175B (CR1009) CR178B (CR1009) CR1506 CR1805 _ _ _ _ _ INTERCHANGE STATION AND TUNNELS
GENERAL NOTES:
ECS SUPPLY AIR (SAD) ELE POWER LOW VOLTAGE TWK TRACKWORK AFC AUTOFARE CONTROL DRN WASTE PIPE
• ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. 8-1 8-2 Drawing Title:
8-3 8-4 8-5 8-6 8-7

ECS RETURN AIR (RAD) ELE POWER EQUIPMENT SIG-STN SIGNAL STATION LET LIFT-ESC-TRAVELLATOR DRN PUMP PIPE
8-8 8-9 8-10 8-11
8-A

8-B
7-1 7-2 7-3

CR13 BRIGHT HILL INTERCHANGE STATION AND TUNNEL


7-4 7-5 7-6 7-7 7-8 7-9 7-10 7-11

• ALL HEIGHTS OF SERVICES ARE WALL OPENINGS ARE REFERENCED FROM GENERAL FLOOR FINISHED LEVEL 8-C 7-A

7-B

(FFL) UNLESS OTHERWISE STATED. ECS FRESH AIR (FAD) PWR HIGH TENSION CABLE SIG-TUN SIGNAL TUNNEL PSS DOMESTIC WATER PIPE ELE PLATFORM TOUCH VOLTAGE S-1 S-2

L1 ENTRANCE LEVEL - LAYOUT PLAN


S-A
7-C S-B

S-C

ECS EXHAUST AIR (EAD) FPS SPRINKLER PIPE OCR OVERHEAD CONDUCTOR RAIL PSS NEWWATER PIPE ERT EARTH MAT 5-1 5-2 5-3 5-4 5-5 5-6 5-7 5-8 5-9

6-1 6-2 6-3 6-4 6-5 6-6 6-7


(PART 3 OF 11)
• ALL KERBS AROUND FLOOR OPENINGS ARE 100MM (W) X 100MM (H) UNLESS OTHERWISE STATED.
6-8 6-9 6-10 6-11 6-12
5-A

5-B

Designed Checked Approved


ECS FIRE RATED FPS HOSEREEL PIPE FCI COMMERCIAL INFO PSS HOSEREEL PIPE SCC STRAY CURRENT
5-C
6-A

6-B

SWC ARNEL/JAMEEL THAMEEZH


• ALL STRUCTURAL INVERT LEVEL FOR ALL PITS AND INSPECTION CHAMBERS SHALL BE BASED OM THE ECS REFRIGERANT PIPE FPS DRY RISER PIPE COM COMMS STATION PSS SPRINKLER PIPE Scale Drawn Date
INDICATED INVERT LEVEL OF THE PITS/IC/WS MINUS 50MM.
ECS TRAY FPS BREECHING INLET PIPE COM COMMS TUNNEL SAN VENT PIPE 1 : 50 POC NOV 23
Drawing No: Rev.
• LIFT, ESCALATOR AND TRAVELATOR PIT AND STRUCTURAL RECESS ARE INDICATIVE ONLY. FINAL SIZE WILL
ECS CHWS SUPPLY & RETURN FPS CLEAN GAS PIPE COM ISCS STATION SAN SOIL WASTE PIPE 0
BE CAPTURED ONCE SWC FOR LIFT AND TRAVELATOR ON BOARD. SIZE SHOWN FOR ESCALATOR AND CR117-POCCL-CR13-L1-B-SEM-DR-LPL- 7303
TRAVELATOR PIT IS BASED ON LTA-TVMS GIVEN SIZE AND DIMENSION. ECS CONDERSER SUPPLY & RETURN FPS FS TRUNKING COM ISCS TUNNEL SAN PUMP PIPE 0 NOV 23 POC SUBMISSION APPROVAL SWC ARNEL/JAMEEL THAMEEZH
KEYPLAN File Name: CR117-POCCL-CR13-ZZ-B-SEM-M3-PIM-0001 SHEET 3 OF 11 A0
Rev Date Drawn By Description Designed By Checked By Approved By

You might also like