Log9 Rapid8000 battery Asset Assessment

Section Topic Rating (1-5)Evidence Comments


easily removed/ rationale
for repair. In a battery pack if required a single Definitions / benchmarks
Asset quality 4 cell be replaced
testing later for second
and development life use. testing and validation
cycle. However Rating
Built 1
through Rating
from 3 and tested Proprietary
tried Rating 5 with simulation tools as
- Design - Maturity 4 Audit Report reportsresearch
senior not shared so far.
fellow with Phd in cell design and experimentation product well dedicated
>15 as on-ground testingfolks
research
- R&D 5 Audit Report development No R&D team (excluding ancillary roles)
80% from consistent, accredited
- Suppliers ( Main component- Cell supplier 3 Audit Report Cell supplier
Log9 claims innot shared
house by Log9
BMS. team officially.
No evidence shown to prove this Adhoc supplier base Indianfrom
80% suppliers
consistent, accredited
- BMS supplier 3 Audit Report claim. Adhoc supplier base Indian
80% fromsuppliers
consistent, accredited
- Busbar 5 Audit Report Copper Adhoc supplier base Indian suppliers
- Outer body 4 Audit Report MS. Fabrication quality and IQC is good. e.g. drive train, batteries, body
- Operations - Incoming quality 5 Audit Report Adequate equipments and processes for incoming quality Only test-drive
Only assembly post panels
checks with specialised test
- Material Storage 5 Audit Report FIFO througly,
done system followed,
each screw proper materialat
is screwed storage in torque
speciific racks with assembly equipment
processes incld Quality circle,
- Production Process 5 Audit Report proper records
Qualified maintained
( Diploma via automatic
) operators, machines.
Departments and hierarchy Not implemented Kaizen, FMEA
Uniformed, charts
trained etc with
workers
- Manpower 5 Audit Report structure is implemented Manual with basic specialised tools, specific roles
- In-Process quality 5 Audit Report Poka-yoke
Final batterymaintained at crucial
testing ( EOL tested)stations
was not online. Done on tools equipment Key processes automated
- Quality assurance 3 Audit Report sampling basis.
- PDI 4 Audit Report Detailed PDI reports available
- Customer feedback NA TBD Detractors In-different Advocates
- Dealer feedback NA TBD Detractors In-different Advocates
parts are easily accessible, we can easily manage this asset.
Ease of maintenance / repairability 3.5 Screw type assembly.
replaceability. All key components locally
- General - Spare parts availability 4 Audit Report manufactured
- BMS modification 1 BMS
of theiscost
inhouse built pack.
of battery which Battery
is problemtic incasewith
pack works log9insta
is out
kitof business.
- Extent of onboard electro 1 Audit Report and this need to be explored more. No details shared High e.g. for 4W EVs Low
- Manufacturing complexity 5 Audit Report Simple assembly, except BMS No dedicated equipment required
No service centre 100% coverage in all cities with
- Company support - Service centres 5 Dedicated service centers in multiple cities support spare parts stock
- Warranty 5 Audit Report 6 yrs/ unlimited KM
- Customer feedback NA TBD Detractors In-different Advocates
- Dealer feedback NA TBD Detractors In-different Advocates

Battery can located due to IoT connectivity. It can also be


Ease of recovery 4 switched off remotely due to mosfet feature.
- IoT enablement 5 Audit Report Yes, Teltonica for 2G, 5G Tor.ai (formally CloudQ) No Yes
Conculsion - Business can be started with small ticket size and simultaneouly deep dive into risk zones
Summary message to explore more for further business.

Satisfaction Level Score


Good 4+