Part B consists of 5 Units. Answer any one full question from each unit.
Each question carries 10 marks and may have a, b, c as sub questions.
PART- A
(25 Marks)
H
2.a) Write short notes on: i) Mine ii) Mining iii) Mining Engineering.
b) Describe the different stages of mine life. [5+5]
OR
-0
3.a) What are: i) Development ii) Depillaring iii) Face iv) Strike.
b) Write the essay on coal deposit of India. [5+5]
5-
4.a) What is churn drilling? Describe the working principle of it with a neat diagram.
b) Write short notes on: i) Detonator ii) Detonation pressure iii) NONEL. [5+5]
OR
20
5.a) What is blasting? Describe the blasting practiced in surface mining for producing of
1000 T per day.
b) Write short notes on: i) Bore hole deviation ii) Secondary blasting. [5+5]
18
7.a) Describe the supporting system for bord and pillar method.
b) Write the method for withdrawal of supports with neat sketches. [5+5]
M
8.a) A coal seam of 3 m is being mined with shearer, face length is 150 m, panel length is
1.5 kilo metres, diameter and width of drum are 1.4 m and 0.45 m. Assume there are
3 cuts per shift of 8 hours. What will be the daily production?
b) Write the working principle of Tunnel Boring Machine with neat sketches. [5+5]
OR
9.a) A coal deposit of 2.5 m thick is being extracted by Bord and Pillar mining method, length
JN
of the blast hole and size of the faces are 1.8 m and 4.2 m × 2.5 m and pull per blast is
1 m. Determine output per blast?
b) What are the modern methods for tunnelling and drifting? Describe them with neat
TU
sketch. [5+5]
10.a) Explain the procedure for deepening of shaft from 300 m to 350 m for reach below seam.
b) Describe the method for dealing of water with neat diagram. [5+5]
H
OR
11.a) Write the following: i) Ventilation arrangement ii) Lighting arrangement.
b) Describe the modern method for driving the shaft of 6 m diameter. [5+5]