BILL OF QUANTITY FOR METAL WORK

S.N WORK DESCRIPTION MATERIAL DESCRIPTION UNIT QTY


40mm*60mm*2.0mm (RHS) BERGA 7
1 TABLE FOR RAW MATERIAL STORAGE
CHECKER PLATE (2m*1m*1.4m) PCS 8
40mm*40mm*2.0mm (ANGLE) BERGA 9
2 SHELFE FOR SPAREPARTES AND TOOLS
CHIPWOOD (2.44m*1.22m) PCS 3
30mm*30mm*2.0MM (RHS) BERGA 7
3 STEPPING STAIR FOR DRIER AND WINDING
PLY WOOD (AUSTALIA) PCS 2
30mm*30mm*2.0MM (RHS) BERGA 15
30mm*30mm*3.0MM (STRIP) BERGA 6
4 ROLLER STAND FOR MATERIAL HANDLING
TONDINO PCS 1
ROLLER STAND PCS 6
ELECTRODE -2.5 PACKET 1
CUTTER DISC - 180mm PCS 5
GRINDER DISC - 180mm PCS 1
5 CONSUMBALE ITEMS
BLACK WIRE FOR WELDING KG 1
ANTIRUST GALON 1
BLACK PAINT GALON 1
6 LABOUR COST
RK
UNIT PRICE TOTAL AMOUNT REMARK
3,300.00 23,100.00 ESTIMATION
5,600.00 44,800.00 ESTIMATION
1,200.00 10,800.00 ESTIMATION
700 2,100.00 ESTIMATION
1,950.00 13,650.00 ESTIMATION
1,800.00 3,600.00 ESTIMATION
1,950.00 29,250.00 ESTIMATION
850 5,100.00 ESTIMATION
- ESTIMATION
- ESTIMATION
1,000.00 1,000.00 ESTIMATION
100 500.00 ESTIMATION
200 200.00 ESTIMATION
200 200.00 ESTIMATION
1,100.00 1,100.00 ESTIMATION
1,450.00 1,450.00 ESTIMATION
30,000.00
TOTAL SUM 166,850.00